Methodology Statement

You might also like

Download as pdf
Download as pdf
You are on page 1of 6
METHODOLOGY STATEMENT IETHCDOLOGY STATEMENT — OUTDOOR PRINARY SUBSTATION ‘The Upgrading of Marble Factory PSS to 4x6MVA with TIKY feeders at Al ‘Suwaig in Al Batinah Governorate willbe uided into several smaller sections ot work The inalaton of power cable, power transiomers and protection equipment ‘il be handles by saparat ntallatcn team, The raroure alosted toe poeck ‘be caresyonding toe prec schedule. “This cocurett desorbes the main consruton actives that wil be executed and ‘he methedoigy that wil be flowed. These events wl flow afte the approval ot alldesigns by Mazoon Elcticty Company (S.A.0.C) and he appoined Consutant. 1 civiL WoRKS 11 SITEPREPERATION elo. any werk wil commence on ste the salty fie for Conssidated Powe Projects and ts subcorirecter wil be submited to azoen Electicy Company (S.A0.0) or approval. | Take. over Substation ste from MZEC, Confim construction boundatis end eri ll esting ences. Complete Geotechle! suvey to detemine lad bearing eapscty Foard resus to Cl Orsign Department to optimize equipment bases and baling degra, IM. Complete. soll resistiy test to detemine optimum earhmat ‘otiguration by electrical design team, 12. SITE CONSTRUCTION 124 Power Cable trenches Setting out of the cable trench as per the approved cable route design | Got approval tor excavation ram MZEC |, Excavate he cable ren ane arcade open excavations IM. Instat sand bedding according to manufacturers specticalons the manufacturer's specicalens. The necessary concrete ‘lcks and ean tape wl be nsiaed below ground level as ‘a waming and protecton forthe cable “The rout wil be frallyinccalod by suitable approved cable rare nated above ground eva Page 205 METHODOLOGY STATENENT — OUTDOOR PRIMARY SUBSTATION. 41.22 Outdoor Concrete Works Thi ie setion cescrbes the construction acts for outdoor foundations. a 2 ELECTRICAL Compete substation ‘Seting Out as per approved General ‘rangement and Foundaton Layout Drawings, Get approval for excavations rom MZEC. Al excavated ‘metal tobe spok in platform suround, (Compact inst soln excavated hols to $3%4 MODASSHTO Complete reiriercemont as per civ base design, instal Shutlering and pace hldsdown bots nconect postions. Belore pouring concrete, MZEC end AFAQ to sign off GCP ‘wit egaré to dimensional checks, ‘Gast bases (min MPA concrete) and tsi cubes ‘low 23hr belore stoping of shutleing and rubbing down (wth carborandum bios a8 moat nigh ‘low 14 days cuting of concrete beloreinstaling sictures fad squat. "The Sng pec forth ranslormerpnthe be 28 aye, INSTALLATION 21 OUTDOOR EQUIPMENT 2.4 HV Equipmentand Structures Inet main eath-mat as por approved desgn and associated ‘ening. Insta al equpment support structures. These stuctres tot {othe foundations complated ding the ch conatcon Insaation of the HV equpmert wil be done as per the General rangement Drawing and as pertne manutaturers ‘stalsion prozecure ‘Complete all equpment eathing and carnet tas to maln feartimal, instal eat spes as required earting design CGempleto the crop-down teminaions and connections tothe HV Terminals fhe equipment

You might also like