CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS

FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND


HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 1 of 20

KING ABDULAZIZ CITY FOR SCIENCE & TECHNOLOGY (KACST)

CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST
BIOTECHNOLOGY FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN
CAMPUS IN RIYADH

Prepared By

Monthly Report: #04


01 September 2018 – 30 September 2018
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 2 of 20

TABLE OF CONTENTS PAGE

1. PROJECT AND DOCUMENT REFERENCE 3


1.1. ISSUE HISTORY 3
1.2. VERSIONS 3
1.3. DISTRIBUTION 3
2. PROJECT SUMMARY 4
2.1. INTRODUCTION TO THE PROJECT 4
2.2. GENERAL PROJECT INFORMATION 4
2.3. CONTRACT PARTICULARS 4
3. LOCATIONS 5
3.1. SITES LOCATIONS 5
4. PROJECT STAKEHOLDERS 8
4.1. LEAD CONTACTS 8
4.2. PROJECT STAKEHOLDERS ORGANIZATION / RELATIONSHIP CHART 9
5. PROJECT HIGHLIGHTS 10
5.1. EXECUTIVE SUMMARY 10
5.1.1. SHOPDRAWING STATUS 10
5.1.2. MATERIALS SUBMITTALS 12
5.1.3. CONSTRUCTION STATUS 13
5.2. PLANNING SUMMARY 14
5.3. FINANCIAL STATUS 14
5.4. KEY RISKS 14
5.5. KEY ISSUES 14
6. PENDING ISSUES 15
7. PROJECT DOCUMANTATION STATUS 16
7.1. OFFICIAL DOCUMENTS LOG 17
7.2. LOG OF ADVANCE COPIES 21
8. MEETINGS 22
9. MAN POWER & EQUIPMENT AT SITE 22
10. ORGANIZATION CHART FOR SUPERVISION TEAM 23
11. REPORT INFORMATION 24
11.1. TIME SCHEDULE STATUS 24
12. SAFETY AT SITE 24
13. APPENDIX 25
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 3 of 20

1. PROJECT AND DOCUMENT REFERENCE


1.1. ISSUE HISTORY
Change
Document ID / Version Date Author
Details

01 01 JULY 2018 - Engr. Rami M. Elsaadaney

02 01 AUGUST 2018 - Engr. Rami M. Elsaadaney

03 01 SEPTEMBER 2018 - Engr. Rami M. Elsaadaney

1.2. VERSIONS

Prepared By Approved by Position Version date

PROJECT
Engr. Rami M. Elsaadaney Engr. Girgis H. Wissa 01 OCTOBER 2018
MANAGER

1.3. DISTRIBUTION

SR. Name
KING ABDULAZIZ CITY FOR SCIENCE & TECHNOLOGY – CONSTRUCTION PROJECTS
1
SUPERVISION DEPARTMENT

2 STS CO. - CONSTRUCTION TEAM


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 4 of 20

2. PROJECT SUMMARY
2.1. INTRODUCTION TO THE PROJECT
THE MUCH-NEEDED FACILITIES BUILDINGS TO POWER UP THE NEW ICONIC BUILDINGS OF
KING ABDELAZIZ CITY FOR SCIENCE AND TECHNOLOGY AS LISTED:

CP-07 CHILLER YARD AND ROOM NEAR BIOTECHNOLOGY FACILITY


41-A ELECTRICAL SUB-STATION NEAR BIOTECHNOLOGY FACILITY
WS-41 WORKSHOP NEAR BIOTECHNOLOGY FACILITY
SS-41 SEC SUB-STATION NEAR BIOTECHNOLOGY FACILITY
CPA-41 CAR PARKING AREA NEAR BIOTECHNOLOGY FACILITY
CP-06 CHILLER YARD, PUMP ROOM, GENERATORS & SUB STATIONS BLDG. NEAR HEAD QUARTERS BUILDING
CPA-200 CAR PARKING AREA NEAR HEAD QUARTERS BUILDING

2.2. GENERAL PROJECT INFORMATION

CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS


Project Name FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

CLIENT KING ABDUL-AZIZ CITY FOR SCIENCE AND TECHNOLOGY (KACST)

LOCATIONS KINGDOM OF SAUDI ARABIA

2.3. CONTRACT PARTICULARS

Contractor Al Ta’afuf Company for Electrical Works - STS


LOA Ref & Date LOA REF. 39117776 DATED 02/06/1439
Agreement Date SUNDAY 22/07/1439 - 08/04/2018
Original Contract Sum SAR 47,977,843/83
Construction Period (By Calendar Days) 360 DAYS
Project Site Handover Date 15-APRIL-2018
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 5 of 20

3. LOCATIONS
3.1. SITES LOCATIONS
CHILLER YARD, PUMP ROOM, GENERATORS & SUB STATIONS BLDG. NEAR HEAD QUARTERS
BUILDING & CAR PARKING AREA NEAR HEAD QUARTERS BUILDING

* SITE AREA IS MARKED WITH RED DASHED LINE.


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 6 of 20

CHILLER YARD, PUMP ROOM, SUB STATIONS, WORKSHOP & SEC SUB-STATION NEAR
BIOTECHNOLOGY RESEARCH FACILITY

* SITE AREA IS MARKED WITH RED DASHED LINE.


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 7 of 20

CAR PARKING AREA NEAR BIOTECHNOLOGY RESEARCH FACILITY

* SITE AREA IS MARKED WITH RED DASHED LINE.


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 8 of 20

4. PROJECT STAKEHOLDERS

4.1. LEAD CONTACTS

Client King Abdul Aziz City for Science and Technology


INTERSECTION OF KING ABDULLAH ROAD WITH PRINCE TURKI BIN ABDUL
ADDRESS
AZIZ (AL-AWAL) - RIYADH

LEAD CONTACT ENGR. ABDULLAH HAJLAA (PROJECT MANAGER)

TELEPHONE NO. 0543426631

Main Contractor Al Ta’afuf Company for Electrical Works - STS

ADDRESS AL MADINA ROAD - JEDDAH - SAUDIA ARABIA

LEAD CONTACT ENGR. GIRGIS WISSA (PROJECT MANAGER)

TELEPHONE NO. 0593096620


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 9 of 20

4.2. PROJECT STAKEHOLDERS ORGANIZATION / RELATIONSHIP CHART

Client
King Abdul Aziz City for Science
and Technology
(KACST)

End Users Supervisor


H.Q. Building & General Directorate of Facilities
Biotech Building (GDF)

Contractor
STS Al-Ta’afuf Co.
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 10 of 20

5. PROJECT HIGHLIGHTS
5.1. EXECUTIVE SUMMARY
5.1.1. SHOPDRAWING STATUS
Submittal Reference Discipline DWG No REV Drawing Title Action
CPC/CP-06/SITE/A-D/001/REV-01 ARC CPC/CP-06/SITE/A/001 REV-01 Site Layout of Chiller Yard near HQ B
CPC/CP-06/C-D/002/REV-01 STR CPC/CP-06/S/102 REV-01 EXCAVATION PLAN FOR BUILDING - HQ B
CPC/CP-06/A-D/001/REV-01 ARC CPC/CP-06/A/001 REV-01 Ground Floor Plan - Chiller Yard - HQ B
CPC/CP-06/C-D/004/REV-01 STR CPC/CP-06/S/100 REV-01 FOUNDATION LAYOUT PLAN - HQ C
CPC/CP-06/C-D/005/REV-01 STR CPC/CP-06/S/101 REV-01 COLUMNS & AXIS PLAN - COLUMNS NECK C
CPC/CP-06/C-D/006/REV-01 STR CPC/CP-06/S/103 REV-01 GRADE BEAM LAYOUT PLAN B
CPC/CP-06/S-D/007 STR CPC/CP-06/S/104 REV-00 CHILLER MACHINE FOUNDATION - HQ C
CPC/CP-06/S-D/008 STR CPC/CP-06/S/105 REV-00 SLAB ON GRADE LAYOUT - HQ C
CPC/CP-06/S-D/009 STR CPC/CP-06/S/106 REV-00 COLUMNS AND AXIS - GROUND FLOOR C
CPC/CP-06/S-D/010 STR CPC/CP-06/S/107 REV-00 ROOF FRAMING - DROP BEAMS B
CPC/CP-06/A-D/002/REV-01 ARC CPC/CP-06/A/002 REV-01 Roof floor plan - Chiller Yard - HQ B
CPC/CP-06/S-D/011 STR CPC/CP-06/S/108 REV-00 ROOF FRAMING - HOLLOW CORE SLAB B
CPC/CP-06/A-D/004/REV-01 ARC CPC/CP-06/A/004 REV-01 Sections - Chiller Yard - HQ C
CPC/CP-06/A-D/005/REV-01 ARC CPC/CP-06/A/005 REV-01 Finishing Schedule - Chiller Yard - HQ B
CPC/CP-06/A-D/003/REV-01 ARC CPC/CP-06/A/003 REV-01 Elevations - Chiller Yard - HQ C
CPC/41-A/E-D/003/REV-01 ELE CPC/41-A/E/003 REV-01 Ground Floor IP Telephone & Data System Layout Substation A
CPC/41-A/E-D/005/REV-01 ELE CPC/41-A/E/005 REV-01 Grounding System Layout Substation C
CPC/41-A/E-D/004/REV-01 ELE CPC/41-A/E/004 REV-01 Roof Floor Equipment Power System Layout Substation C
CPC/41-A/E-D/006/REV-01 ELE CPC/41-A/E/006 REV-01 Roof Floor Lightning System Layout Substation C
CPC/CP-07/E-D/007/REV-01 ELE CPC/CP-07/E/007 REV-01 Grounding System Layout & Lightning System Layout - Pump Room B
CPC/CP-06/SITE/A-D/001/REV-02 ARC CPC/CP-06/SITE/A/001 REV-02 Site Layout of Chiller Yard near HQ B
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 11 of 20

Submittal Reference Discipline DWG No REV Drawing Title Action


CPC/41-A/E-D/001/REV-01 ELE CPC/41-A/E/001 REV-01 Ground Floor Lighting System Layout Substation B
CPC/CP-07/E-D/001/REV-01 ELE CPC/CP-07/E/001 REV-01 Ground Floor Lighting System Layout - Chiller Yard & Pump Room B
CPC/GL/E-D/001 ELE CPC/GL/E/001 REV-00 MV CABLE ROUTING GENERAL SITE LAYOUT C
CPC/CP-06/MAC-D/001 MEC CPC/CP-06/MAC/001 REV-00 Chilled Water Piping Layout - Ground Floor (Master) C
CPC/CP-06/MAC-D/001 MEC CPC/CP-06/MAC/002 REV-00 Chilled Water Piping Layout - Ground Floor (Part-1) C
CPC/CP-06/MAC-D/001 MEC CPC/CP-06/MAC/003 REV-00 Chilled Water Piping Layout - Ground Floor (Part-2) C
CPC/CP-07/MAC-D/006 MEC CPC/CP-07/MAC/006 REV-00 Ground Floor Chilled Water System Layout C
CPC/CP-07/MAC-D/006 MEC CPC/CP-07/MAC/007 REV-00 Ground Floor Chilled Water System Layout (Part-1) C
CPC/CP-07/MAC-D/006 MEC CPC/CP-07/MAC/008 REV-00 Ground Floor Chilled Water System Layout (Part-1) C
CPC/CP-06/E-D/001 ELE CPC/CP-06/E/001 REV-00 HQ - POWER SINGLE LINE DIAGRAM
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 12 of 20

5.1.2. MATERIALS SUBMITTALS


Submittal Reference Description Action
CPC/E-MAT/018 ELECTRICAL MANHOLE COVER & FRAME C
CPC/C-MAT/006 BLOCK A
CPC/CP-07/MAC-MAT/033/REV01 Air Cooled Chiller - Biotech (REV-01) A
CPC/MFP-MAT/037 NOVEC 1230 FIRE SUPPRESSION SYSTEM C
CPC/E-MAT/019 uPVC Pipes & Fittings (Class-3) B
CPC/E-MAT/020 CCTV System C
CPC/MAC-MP-MAT/038 FLEXIBLE CONNECTOR Sample A
CPC/MAC-MAT/024/REV-01 Chilled Water Pumps (REV-01) D
CPC/CP-06/MAC-MAT/032/REV01 Air Cooled Chiller - HQ (REV-01) A
CPC/MAC-MAT/025/REV-01 Pressure Gauges (REV-01) A
CPC/C-MAT/007 Interlock Suppliers B
CPC/C-MAT/008 Asphalt Concrete Components C
CPC/C-MAT/009 Pre-Cast Concrete Hollow Core Slabs B
CPC/C-MAT/010 Plastering and Block Work Accessories
CPC/MAC-MP-MAT/039 Identification Marker Sample A
CPC/E-MAT/018/REV-01 ELECTRICAL MANHOLE COVER & FRAME (REV-01) B
CPC/E-MAT/021 CABLE LUGS & GLANDS
STS-MEC-MAT-014-REV02 PACKAGE & SPLIT UNIT (REV02)
CPC/C-MAT/008/REV-01 Asphalt Concrete Components (REV-01)
CPC/MP-MAT/023/REV-01 Domestic Water Booster Pumps (REV-01)
CPC/MAC-MAT/024/REV-02 Chilled Water Pumps (REV-02)
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 13 of 20

5.1.3. CONSTRUCTION STATUS


Activity Location % of Completion Notes
Fencing H.Q. Area 100
Port cabin offices H.Q. Area for All of the project 100 Including the all needed connections
Removing the existing obstacles Bio-Tech Area 90
Removing the existing obstacles H.Q. Area 100
Removing the existing obstacles H.Q. Parking Area 25 Still obstructed by ABVR since the start of the project
Removing the existing obstacles Bio-Tech Parking Area 100
Checking the control point H.Q. Area 100
Checking the control point Bio-Tech Area 100
Checking the border lines H.Q. Area 100
Checking the border lines Bio-Tech Area 100
NGL’s survey H.Q. Area 100
NGL’s survey H.Q. Parking Area 100
NGL’s survey Bio-Tech Area 100
NGL’s survey Bio-Tech parking Area 100
NGL’s survey Building 17 Parking Area 100
Building setting out H.Q. Area 100
Building setting out Bio-Tech Area 100
Building setting out H.Q. Parking Area 100
Building setting out Bio-Tech Parking Area 100
Excavation for buildings H.Q. Area 20
Excavation for buildings Bio-Tech Area 20
Backfilling Materials hauling H.Q. Area 80
Main Store area H.Q. Area for the whole project 100
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 14 of 20

Additional asphalt removal H.Q. Area 100


Additional asphalt removal Bio-Tech Area 10
Additional ABVR’S Obstacles Removal H.Q. Parking Area 10
Excavation of the HQ building foundations H.Q. Area 90
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 15 of 20

5.2. PLANNING SUMMARY


Attachment
Doc. Ref. Sent Date Reference Description Action
STS-GDF-PPC-001-2018 30 Apr 2018 (Monday) Time Schedule Modified Time Schedule C
STS-GDF-PPC-037-2018 28 May 2018 (Monday) Time Schedule REV01 Time Schedule Rev01 A

5.3. FINANCIAL STATUS


Out-
Contract Down Invoiced Latest Certification Actual Standing
Contract No.
Value Payment Amount invoice Amount Received Payment
Value
47,977,843/83 2,398,892/19 2,398,892/19 1 2,398,892/19 2,398,892/19 0

5.4. KEY RISKS


Action Action
Risk Description
Needed Owner
Delay of the construction of H.Q. Parking Area Due to the Occupation of Construction Removal of KACST TO
area by neighboring Contractor. The Obstacles ABV Rock
Delay of the construction of BIO-TECH AREA Due to the final approval of the design Deciding the KACST
levels of the area. design levels
Delay of the construction of the parking area of the Bio-tech area duo to the delay of Deciding the KACST
the approval of the location and primary design of the parking location

5.5. KEY ISSUES


Issue Description Action Needed Action Owner
Delay of the construction of H.Q. Parking Area Due to the Occupation Removal of The KACST
of Construction area by neighboring Contractor. Obstacles
Delay of the construction of BIO-TECH AREA Due to the final approval Deciding the design KACST
of the design levels of the area. levels
Delay of the construction of the parking area of the Bio-tech area duo Deciding the KACST
to the delay of the approval of the location and primary design of the location
parking
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 16 of 20

6. PENDING ISSUES
Action Action
Issue Description
Needed Owner
Delay of the construction of H.Q. Parking Area Due to the Occupation of Construction area KACST KACST
by neighboring Contractor. follow up
Delay of the construction of BIO-TECH AREA Due to the final approval of the design levels of KACST KACST
the area. follow up
Delay of the construction of the parking area of the Bio-tech area duo to the delay of the KACST KACST
approval of the location and primary design of the parking follow up

7. PROJECT DOCUMENTATION STATUS

Due to KACST’s system of communication, all documents had been submitted with letters.
A full log is attached.

Total No. of Material Total No. of Shop Total No. of Document Total No of
Total No. of Letters
Submittals Drawing Submittals Submittals RFIs
Outgoing Incoming
21 27 7 0
60 65

Total No of Submissions Code A Code B Code C Pending


55 7 18 17 12
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 17 of 20

8. MEETINGS

Weekly Progress Meeting with Contractor

(3) Weekly Meetings were Held to Follow up the Project with Contractor. (Attached)

Other Meetings

Few quick meetings discussing the standing issues of chillers, SLD, and obstacles.

9. MAN POWER & EQUIPMENT AT SITE

Name Position Equipment

Engr. Girgis H. Wissa Project Manager 5 Excavator


1 Pickup Truck
Construction Manager / 6 Dump Trucks
Engr. Rami M. Elsaadaney
Quality Control Manager 3 Loaders

Engr. Ahmad Zaki Architectural Engineer


Engr. Sherif Ibrahim Mechanical Engineer
Engr. Larry Ortega Mechanical Engineer
Engr. Jalal Fakhri Electrical Engineer
Mr. Ashraf Tawfiq Safety Officer
Mr. Ahmad Saeed Document Controller
Mr. Joneil Arizala Draft Man
3 Site Engineer
1 Surveyor
4 Plumber
5 Electrician
4 Guard
3 Excavator Operator
7 Laborer
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 18 of 20

10. ORGANIZATION CHART FOR SUPERVISION TEAM


CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 19 of 20

11. REPORT INFORMATION


11.1 TIME SCHEDULE STATUS

SR# Description Value Percentage

1 PROJECT TOTAL DURATION (DAY) 360 100%

2 TIME LAPSED (DAY) 168 % 46.67

3 REMAINING DURATION (DAY) 192 % 53.33

12. SAFETY AT SITE


No accidents were reported on site.
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS
FOR KACST BIOTECHNOLOGY RESEARCH FACILITY AND
HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH

Monthly Report # : 04 Date : 10/1/2018


Period : 9/1/2018 to 9/30/2018 Page : 20 of 20

13. APPENDIX
13.1 PROJECT PROGRESS PHOTOS & VIDEOS
Progress photos & videos are provided through the attached CD.

13.2 OFFICIAL DOCUMENTS LOG


Attached.

13.3 MINUTES OF MEETINGS


Attached.