04 20180901 - 20180930 (En)
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST
BIOTECHNOLOGY FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN
CAMPUS IN RIYADH
Prepared By
1.2. VERSIONS
PROJECT
Engr. Rami M. Elsaadaney Engr. Girgis H. Wissa 01 OCTOBER 2018
MANAGER
1.3. DISTRIBUTION
SR. Name
KING ABDULAZIZ CITY FOR SCIENCE & TECHNOLOGY – CONSTRUCTION PROJECTS
1
SUPERVISION DEPARTMENT
2. PROJECT SUMMARY
2.1. INTRODUCTION TO THE PROJECT
THE MUCH-NEEDED FACILITIES BUILDINGS TO POWER UP THE NEW ICONIC BUILDINGS OF
KING ABDELAZIZ CITY FOR SCIENCE AND TECHNOLOGY AS LISTED:
3. LOCATIONS
3.1. SITES LOCATIONS
CHILLER YARD, PUMP ROOM, GENERATORS & SUB STATIONS BLDG. NEAR HEAD QUARTERS
BUILDING & CAR PARKING AREA NEAR HEAD QUARTERS BUILDING
CHILLER YARD, PUMP ROOM, SUB STATIONS, WORKSHOP & SEC SUB-STATION NEAR
BIOTECHNOLOGY RESEARCH FACILITY
4. PROJECT STAKEHOLDERS
Client
King Abdul Aziz City for Science
and Technology
(KACST)
Contractor
STS Al-Ta’afuf Co.
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH
5. PROJECT HIGHLIGHTS
5.1. EXECUTIVE SUMMARY
5.1.1. SHOPDRAWING STATUS
Submittal Reference Discipline DWG No REV Drawing Title Action
CPC/CP-06/SITE/A-D/001/REV-01 ARC CPC/CP-06/SITE/A/001 REV-01 Site Layout of Chiller Yard near HQ B
CPC/CP-06/C-D/002/REV-01 STR CPC/CP-06/S/102 REV-01 EXCAVATION PLAN FOR BUILDING - HQ B
CPC/CP-06/A-D/001/REV-01 ARC CPC/CP-06/A/001 REV-01 Ground Floor Plan - Chiller Yard - HQ B
CPC/CP-06/C-D/004/REV-01 STR CPC/CP-06/S/100 REV-01 FOUNDATION LAYOUT PLAN - HQ C
CPC/CP-06/C-D/005/REV-01 STR CPC/CP-06/S/101 REV-01 COLUMNS & AXIS PLAN - COLUMNS NECK C
CPC/CP-06/C-D/006/REV-01 STR CPC/CP-06/S/103 REV-01 GRADE BEAM LAYOUT PLAN B
CPC/CP-06/S-D/007 STR CPC/CP-06/S/104 REV-00 CHILLER MACHINE FOUNDATION - HQ C
CPC/CP-06/S-D/008 STR CPC/CP-06/S/105 REV-00 SLAB ON GRADE LAYOUT - HQ C
CPC/CP-06/S-D/009 STR CPC/CP-06/S/106 REV-00 COLUMNS AND AXIS - GROUND FLOOR C
CPC/CP-06/S-D/010 STR CPC/CP-06/S/107 REV-00 ROOF FRAMING - DROP BEAMS B
CPC/CP-06/A-D/002/REV-01 ARC CPC/CP-06/A/002 REV-01 Roof floor plan - Chiller Yard - HQ B
CPC/CP-06/S-D/011 STR CPC/CP-06/S/108 REV-00 ROOF FRAMING - HOLLOW CORE SLAB B
CPC/CP-06/A-D/004/REV-01 ARC CPC/CP-06/A/004 REV-01 Sections - Chiller Yard - HQ C
CPC/CP-06/A-D/005/REV-01 ARC CPC/CP-06/A/005 REV-01 Finishing Schedule - Chiller Yard - HQ B
CPC/CP-06/A-D/003/REV-01 ARC CPC/CP-06/A/003 REV-01 Elevations - Chiller Yard - HQ C
CPC/41-A/E-D/003/REV-01 ELE CPC/41-A/E/003 REV-01 Ground Floor IP Telephone & Data System Layout Substation A
CPC/41-A/E-D/005/REV-01 ELE CPC/41-A/E/005 REV-01 Grounding System Layout Substation C
CPC/41-A/E-D/004/REV-01 ELE CPC/41-A/E/004 REV-01 Roof Floor Equipment Power System Layout Substation C
CPC/41-A/E-D/006/REV-01 ELE CPC/41-A/E/006 REV-01 Roof Floor Lightning System Layout Substation C
CPC/CP-07/E-D/007/REV-01 ELE CPC/CP-07/E/007 REV-01 Grounding System Layout & Lightning System Layout - Pump Room B
CPC/CP-06/SITE/A-D/001/REV-02 ARC CPC/CP-06/SITE/A/001 REV-02 Site Layout of Chiller Yard near HQ B
CONSTRUCTION OF CHILLER PLANTS, POWER PLANT AND CAR PARKS FOR KACST BIOTECHNOLOGY
RESEARCH FACILITY AND HEADQUARTERS BUILDING AT KACST MAIN CAMPUS IN RIYADH
6. PENDING ISSUES
Action Action
Issue Description
Needed Owner
Delay of the construction of H.Q. Parking Area Due to the Occupation of Construction area KACST KACST
by neighboring Contractor. follow up
Delay of the construction of BIO-TECH AREA Due to the final approval of the design levels of KACST KACST
the area. follow up
Delay of the construction of the parking area of the Bio-tech area duo to the delay of the KACST KACST
approval of the location and primary design of the parking follow up
Due to KACST’s system of communication, all documents had been submitted with letters.
A full log is attached.
Total No. of Material Total No. of Shop Total No. of Document Total No of
Total No. of Letters
Submittals Drawing Submittals Submittals RFIs
Outgoing Incoming
21 27 7 0
60 65
8. MEETINGS
(3) Weekly Meetings were Held to Follow up the Project with Contractor. (Attached)
Other Meetings
Few quick meetings discussing the standing issues of chillers, SLD, and obstacles.
13. APPENDIX
13.1 PROJECT PROGRESS PHOTOS & VIDEOS
Progress photos & videos are provided through the attached CD.