Revision: 001: Part 1 Completed by Originator
Revision: 001: Part 1 Completed by Originator
Revision: 001: Part 1 Completed by Originator
Contractor Date
Documentation Involved:
System/Sub-system No.
Please ‘check’ the categories Engineering , Specification , Material , Quality , Construction , Commissioning , HSE
DETAILS OF ENQUIRY
(Provide full details of the query, using a continuation sheet as appropriate, and attaching copies of relevant marked-up drawings and any other
supporting documentation):
ORIGINATORS RECOMMENDATION(S)
Discipline Engineer
Name & Position
Discipline Engineer
Date
Signature
PART 3 APPROVAL
Engineering Lead
Date
Name &Signature
NOTE: The Engineering Lead shall ensure that Process Risk Management (PRM), Health, Environment, Safety and Security (HESS) and Quality
Control (QC) issues are addressed if applicable.
Technical Query Request Form Revision: 001
SI / FI / VO / Design
Follow Engineering If necessary, work to be completed under
Engineering workpack
Recommendations the following Instruction:
Number:
SIPD Representative
Originator
SIPD Representative
PART 6 CLOSEOUT
SIPD Representative
TQ Administrator
On completion, TQ Administrator to send signed TQ form to originator and Completions Closeout Coordinator, and store records.