Ruang Operasi Dengan Standar Permenkes RI No 1204/MENKES/SK/X/2004
Ruang Operasi Dengan Standar Permenkes RI No 1204/MENKES/SK/X/2004
A. MODUL-MODUL UTAMA
* Power Socket Box with 5pcs Power Socket & 1pc Earth terminal
Size : 719 x 243 mm
* Medical Gas Terminal Box (with 4 pcs medical gas terminal unit )
Size : 734 x 234 mm
* Medicine Cabinet
Size : 900(W) X 1700(H) X 350(D) mm
* Writing table
with lighting, made of stainless steel
Size 700x400x250 mm
B. MODUL PENUNJANG
Page 1 of 4
No. Spesifikasi Teknis
b. Perlengkapan AHU :
Ducting supply instalasi sesuai ruangan Pra instal dan Instal
Ducting Return instalasi sesuai ruangan Pra instal dan Instal
Ducting Plenum instalasi sesuai ruangan Pra instal dan Instal
Ducting Low return instalasi sesuai ruangan Pra instal dan Instal
Return Air Grill instalasi sesuai ruangan Pra instal dan Instal
Damper instalasi sesuai ruangan Pra instal dan Instal
Pipa Drain dan Pipa Refrigrein instalasi sesuai ruangan Pra instal dan Instal
Electric Heater Instalasi di jalur AHU Pra instal dan Instal
Panel control dan kelistrikan AHU Instalasi, pengkabelan dan Panel listrik Pra instal dan Instal
c. Support AHU :
Magnehelic Pressure Instalasi, setting dan adjust Instalasi
Kanopi AHU/Teralis Instalasi sesuai ruangan Instalasi
Support ducting dan Pipa Instalasi tambahan sesuai ruangan Instalasi
Test Commisioning Setting, Adjust dan Running Setting, Adjust dan Running
2. Single Arm Surgical Pendant Instalasi, setting dan adjust Pra Instal main unit ke ruangan
(Bracket, Holder, Listrik dan Gas)
3. Power Electric Socket box Instalasi kelistrikan ruangan, arde dan Pra Instalasi peng kabelan
panel mcb ruangan
4. Medical gas terminal box Instalasi outlet Gas medis (O2, N2O, Pra instalasi piping pipa gas medis
Air compress, Suction)
5. LED Triple X ray Film Viewer Instalasi main unit Pra Instalasi kelistrikan unit dan
pasang pada wall panel sandwich
6. Central control panel 6 compartemen Instalasi main unit Pra Instalasi kelistrikan, sensor2
dan komunikasi pabx/telp dan
control utama output listrik
7. Automatic sliding doors Instalasi main unit Pra Instal kelistrikan unit, pasang
pada wall panel dan sensor auto
8. Air sealed lighting box Instalasi main unit Pra instalasi lampu2 pada ceiling
Air sealed lighting + emergency dan kelistrikannya
9. Passbox Instrument Instalasi main unit Pra Instalasi kelistrikan unit , pasang
pada wall panel ruangan
10. Vinyl flooring anti bacterial Pemasangan pada lantai dan penyolderan Pra instal pemerataan lantai, levelling
sambungan2 dan plint ataupun pembongkaran keramik jika
ada
11. Modular panel sandwich wall Pemasangan sandwich panel pada Pra instalasi leveling dinding atau
anti bacterial ruangan, Plint siku, accessories dan pembongkaran jika ada
sealent sambungan
12. Panel sandwich ceiling Pemasangan ceiling panel sandwich Pra instalas bracket ceiling, leveling
plint siku, accessories dan sealent dan pembongkaran/ penyesuaian
sambungan
13. Writing table (jika ada) Pemasangan unit Pra instal kelistrikan unit dan
pemasangan pada wall panel
14. Scrub Station (jika ada) Pemasangan unit Pra instal kelistrikan unit dan pasang
pipa-pipa supply dan buangan air
15. Cabinet Ruang Operasi (jika ada) Pemasangan unit Pra instal pasang pada wall panel
Page 2 of 4
No. Spesifikasi Teknis
A. MODUL-MODUL UTAMA
* Power Socket Box with 5pcs Power Socket & 1pc Earth terminal
Size : 719 x 243 mm
* Medical Gas Terminal Box (with 4 pcs medical gas terminal unit )
Size : 734 x 234 mm
B. MODUL PENUNJANG
Page 3 of 4
No. Spesifikasi Teknis
b. Perlengkapan AHU :
Ducting supply instalasi sesuai ruangan Pra instal dan Instal
Ducting Return instalasi sesuai ruangan Pra instal dan Instal
Ducting Plenum instalasi sesuai ruangan Pra instal dan Instal
Ducting Low return instalasi sesuai ruangan Pra instal dan Instal
Return Air Grill instalasi sesuai ruangan Pra instal dan Instal
Damper instalasi sesuai ruangan Pra instal dan Instal
Pipa Drain dan Pipa Refrigrein instalasi sesuai ruangan Pra instal dan Instal
Electric Heater Instalasi di jalur AHU Pra instal dan Instal
Panel control dan kelistrikan AHU Instalasi, pengkabelan dan Panel listrik Pra instal dan Instal
c. Support AHU :
Magnehelic Pressure Instalasi, setting dan adjust Instalasi
Kanopi AHU/Teralis Instalasi sesuai ruangan Instalasi
Support ducting dan Pipa Instalasi tambahan sesuai ruangan Instalasi
Test Commisioning Setting, Adjust dan Running Setting, Adjust dan Running
2. Single Arm Surgical Pendant Instalasi, setting dan adjust Pra Instal main unit ke ruangan
(Bracket, Holder, Listrik dan Gas)
3. Power Electric Socket box Instalasi kelistrikan ruangan, arde dan Pra Instalasi peng kabelan
panel mcb ruangan
4. Medical gas terminal box Instalasi outlet Gas medis (O2, N2O, Pra instalasi piping pipa gas medis
Air compress, Suction)
5. LED Triple X ray Film Viewer Instalasi main unit Pra Instalasi kelistrikan unit dan
pasang pada wall panel sandwich
6. Central control panel 6 compartemen Instalasi main unit Pra Instalasi kelistrikan, sensor2
dan komunikasi pabx/telp dan
control utama output listrik
7. Automatic sliding doors Instalasi main unit Pra Instal kelistrikan unit, pasang
pada wall panel dan sensor auto
8. Air sealed lighting box Instalasi main unit Pra instalasi lampu2 pada ceiling
Air sealed lighting + emergency dan kelistrikannya
9. Passbox Instrument Instalasi main unit Pra Instalasi kelistrikan unit , pasang
pada wall panel ruangan
10. Vinyl flooring anti bacterial Pemasangan pada lantai dan penyolderan Pra instal pemerataan lantai, levelling
sambungan2 dan plint ataupun pembongkaran keramik jika
ada
11. Modular panel sandwich wall Pemasangan sandwich panel pada Pra instalasi leveling dinding atau
anti bacterial ruangan, Plint siku, accessories dan pembongkaran jika ada
sealent sambungan
12. Panel sandwich ceiling Pemasangan ceiling panel sandwich Pra instalas bracket ceiling, leveling
plint siku, accessories dan sealent dan pembongkaran/ penyesuaian
sambungan
13. Writing table (jika ada) Pemasangan unit Pra instal kelistrikan unit dan
pemasangan pada wall panel
14. Scrub Station (jika ada) Pemasangan unit Pra instal kelistrikan unit dan pasang
pipa-pipa supply dan buangan air
15. Cabinet Ruang Operasi (jika ada) Pemasangan unit Pra instal pasang pada wall panel