This electricity bill preview provides key information about a past due bill for a customer. It summarizes the billing period from June 1st to July 2nd, 2018 for 1 month. It shows the current meter reading and consumed units as 1.94 KWH. The total amount due on the bill is Rs. 318.79 with a due date of July 22nd, 2018 and a disconnection date of July 29th if not paid. It also lists previous arrears of Rs. 419977 and total payable amount of Rs. 428266 due on or before the due date.
This electricity bill preview provides key information about a past due bill for a customer. It summarizes the billing period from June 1st to July 2nd, 2018 for 1 month. It shows the current meter reading and consumed units as 1.94 KWH. The total amount due on the bill is Rs. 318.79 with a due date of July 22nd, 2018 and a disconnection date of July 29th if not paid. It also lists previous arrears of Rs. 419977 and total payable amount of Rs. 428266 due on or before the due date.
This electricity bill preview provides key information about a past due bill for a customer. It summarizes the billing period from June 1st to July 2nd, 2018 for 1 month. It shows the current meter reading and consumed units as 1.94 KWH. The total amount due on the bill is Rs. 318.79 with a due date of July 22nd, 2018 and a disconnection date of July 29th if not paid. It also lists previous arrears of Rs. 419977 and total payable amount of Rs. 428266 due on or before the due date.
This electricity bill preview provides key information about a past due bill for a customer. It summarizes the billing period from June 1st to July 2nd, 2018 for 1 month. It shows the current meter reading and consumed units as 1.94 KWH. The total amount due on the bill is Rs. 318.79 with a due date of July 22nd, 2018 and a disconnection date of July 29th if not paid. It also lists previous arrears of Rs. 419977 and total payable amount of Rs. 428266 due on or before the due date.
Division Name EDDLALGANJ Consumer Name M/S RELIANCE BHITER GAON BHITER GAON RAEBARELI
Address Phone Number
., Book SC No. Supply Release Supply Load Bill Period 686694 Account No. Bill No. No/Bill Grp Date Type (KW/KVA/BHP) From To Months 0001 / 0 294001156 761702328877 04/12/2008 28 12.00 KW 3102180707729429 01/06/201802/07/2018 1 Last Current Multiplying Consumed Power Actual Meter No. Reading(KWH/KVAH) Reading(KWH/KVAH) Factor Units(KWH/KVAH) Factor Demand Status Bill Date Due Date 1543785134091.26 / 34259.4834093.2 / 34261.68 1.00 1.94 / 2.2 0.88 0.014 Normal 07/07/2018 22/07/2018 Security Bill Base Alotted Units Adjustment Units Total Units Total Demand Inoperative Amount Disconnection Date Amount MU 0 0 2 0.014 0.00 9600.00 29/07/2018 Bill Details Amount (Rs.Ps.) Bill Details Amount (Rs.Ps) 1. Energy Charges 9.90 Total Amount (SR. NO. 1 TO 12) 318.79 2. Fixed/Demand Charges 0.00 / 855.0013. Arrears 3. Voltage / Load Factor Rebate 0.00 / 0.00 i) Previous Arrears / Arrear Count 419977.00 / 41 4. Minimum Charges 0.00 ii) Provisional Credit 0.00 5. Regulatory Surcharge 14. Previous Arrear LPSC Regulatory Surcharge 1 : 0.00 i) Current Component : 12.83 Regulatory Surcharge 2 : 37.02 ii) Arrear Component : 7667.39 6. Dishonoured Cheque 0.0015. Installment Amount 7. Excess Load/Demand Penality 0.00 i) Bill No. 8. Capacitor / LPF Surcharge 0.00 / 0.00 ii) Installment No. 9. Electricity Duty 64.87 iii) Payable Date 10. Power Looms ( No.of Looms LS60" : 0 / No.of Looms GT60" 16. Other Dues 290.21 : 0) A) PLC Charges (+) 0.0017. Total Payable Amount 428266.00 B) PLC ED (+) 0.0018. Rebate Given 0.00 19. Total Payable Amt. On or Before 11. Debit 428266.00 Due Dt A) Assesment / CCBR Adjustments (+) 0.00/0.00 B) Meter Charges (+) 0.00 C) D/R Fee (+) 0.00 D) Others (+) 0.00 12. Credit A) Progressive / CCBR Adjustments () 0.00/0.00 Previous Current B)Temporary (ISD Interest ) / Solar Rebate () 648.00/0.00 Year Year C) Others / Energy Rebate/Subsidy () 0.00/0.00/0.00Energy Arrear 325615.84 3949.58 329565.42 Total Amount (SR. NO. 1 TO 12) 318.79Surcharge 71491.1618920.42 90411.58
Bill Processor Name & ID Assistant Engineer
ENERGY SAVED IS ENERGY PRODUCED Note: If the Bill is not paid by due date, the supply will be disconnected without any further notice Receipt No : 099641/32 Collection Date : 17/09/2017 Amount in Rs : 9856.00 Amount In Words : (Rupees Nine Eight Five Six Only ) Payment Mode : CASH / CHEQUE Cheque/Draft No : Cheque/Draft Date : Bank Name : Cashier Name :
************* BILL ONLY ************
Used for the advice of meter reading for next month Book No. Sc No. Account No. Meter No. Meter Reading Date 0001 294001156 761702328877 15437851 1. Please mention connection no., book no., account no, name and address on the back of cheque/draft. 2. Mention "crossed" and "account payee" on the cheque/draft.