Refer appendixes 13.A fitted coefficient for IDF Curves ARI=Average Recurrence Interval
given by : Tr = 100/P
State = [ Johor Bahru ]
From table equations 13.3, we read appoxiamately as 100 mm
Coefficient of the IDF Polynomial Equations (MASMA volume 4 - design fundamentals)
1) Calculation for rainfall intensity 2 years ARI 2) Calculation for rainfall intensity
5 years ARI
a = 3.8645 a = 4.3251
b = 1.1150 b = 1.0147
c = -0.3272 c = -0.3308
d = 0.0182 d = 0.0205
3) Calculation for rainfall intensity 10 years ARI 4) Calculation for rainfall intensity
20 years ARI
a = 4.4896 a = 4.7656
b = 0.9971 b = 0.8922
c = -0.3279 c = -0.3060
d = 0.0205 d = 0.0192
5) Calculation for rainfall intensity 50 years ARI 6) Calculation for rainfall intensity
100 years ARI
a = 4.5463 a = 5.0532
b = 1.1612 b = 0.8998
c = -0.3758 c = -0.3222
d = 0.0249 d = 0.0215
Depth of rainfall
2 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.08 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
2P5 = 13.5014 mm 2P10 = 27.2087 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
2P15 = 35.4331 mm 2P20 = 41.0873 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
2P30 = 49.1403 mm
Depth of rainfall
5 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.0800 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
5P5 = 19.3434 mm 5P10 = 34.2682 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
5P15 = 43.2231 mm 5P20 = 49.3796 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
5P30 = 58.1479 mm
Depth of rainfall
10 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.08 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
10P5 = 21.6831 mm 10P10 = 39.0222 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
10P15 = 49.4257 mm 10P20 = 56.5781 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
10P30 = 66.7648 mm
Depth of rainfall
20 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.08 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
20P5 = 23.8595 mm 20P10 = 43.6763 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
20P15 = 55.5664 mm 20P20 = 63.7408 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
20P30 = 75.3831 mm
Depth of rainfall
50 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.08 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
50P5 = 28.8414 mm 50P10 = 50.1923 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
50P15 = 63.0028 mm 50P20 = 71.8101 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
50P30 = 84.3537 mm
Depth of rainfall
100 year ARI - 30 minute duration
5 minutes 10 minutes
FD = 2.08 FD = 1.28
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
100P5 = 32.5939 mm 100P10 = 56.0611 mm
15 minutes 20 minutes
FD = 0.8 FD = 0.47
P d = P 30 -F D (P 60 -P 30 ) P d = P 30 -F D (P 60 -P 30 )
100P15 = 70.1415 mm 100P20 = 79.8217 mm
30 minutes
FD = 0
P d = P 30 -F D (P 60 -P 30 )
100P30 = 93.6087 mm
Take 10 years ARI =10P10 x (60 minute)(1/10 minute)= 234.133 mm/hr(Road Side Drain)
Take 50 years ARI =50P10 x (60 minute)(1/10 minute)= 301.154 mm/hr(Pond/Minor Drain)
Take 100 years ARI =100P10 x (60 minute)(1/10 minute)= 336.367 mm/hr(Major Drain)