Professional Documents
Culture Documents
SuperDeck User Manual
SuperDeck User Manual
USER’S MANUAL
Add: 88#, Liangyuan Eastern Road, Liangtian Development Area, Zhuliao, Baiyun, Guangzhou, China
Tel:+8620-62654448 Fax:+8620-62856498 E-mail: gd-yhx@163.com WEB:www.gd-yhx.com
Add: 196 Silverwater Road, Silverwater in New South Wales, Australia Web:www.prestonaustralia.com
Tel: (+612)97484677 , Fax: (+612)96483591 , e-mail: mail@ prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 1
CONTENT
FOREWORD ........................................................................................................................................2
2 TECHNICAL SPECIFICATIONS...................................................................................................5
3 TRANSPORT................................................................................................................................9
4 STACK ........................................................................................................................................10
5 ASSEMBLY ................................................................................................................................ 11
6 INSTALLATION ..........................................................................................................................12
6.1 LIFTING..................................................................................................................................12
6.2 INSTALLATION .........................................................................................................................13
7 DISMANTLE ...............................................................................................................................14
8 OPERATION ...............................................................................................................................16
Photographs and drawings are illustrative only and do not necessarily show the design
of the products on the market at any given point in time. The products must be used in
conformity with applicable practice and safety regulations. Specifications of the products
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 2
FOREWORD
This product is designed and manufactured to meet strict quality and safety standard. This
manual is intended to provide advice and instructions to the operator and qualified service
personnel so that they can safely control the situations which can occur when the product is used,
and can carry out the required service and maintenance on the product.
This manual shall always be available with the equipment in order to guarantee that the
YHX or GD-YHX, is licensed the exclusive rights, by Preston Australia Pty Limited, to
manufacture and sale the patented Superdecktm Retractable Loading Platform in China and some
WARNING!
The equipment should not be operated if Instruction Manual is
missing. Misuse of this equipment could result in personal
injury or property damage.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 3
Page
1 Technical description
CNG series SuperdeckTM retractable loading platforms is a kind of
all over the world――Preston Australia Pty Limited and licensed the
exclusive rights of producing and selling in China and some other asia
Manufacture Co.,Ltd..
particular floor level, all the platforms installed above that level can
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 4
deck. To receive the material, rolls the movable deck out of the building edge. If don’t use the
platform, retract the platform back. The adjustable support props support the platform between
Besides of above parts, there are the deck locking pin to lock the movable deck, side panels
with safety lanyard line and door adjustment, front end doors with door lock, safety chain for
longer loads.
A foot operated leveling ramp is provided to allow the trolley roll up the deck.
CNG series SuperdeckTM retractable loading platforms have four types: CNG22, CNG26,
CNG30 and CNG32 and the allowable maximum load capacity for uniform distribution load is
5t.
Fig.1
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 5
Page
2 Technical specifications
Table 1: Technical specifications
Distance between front and rear prop W3 mm 2235 2235 2235 2235
Distance between left and right prop W4 mm 2015 2415 2815 3015
Distance between the front prop and the slab edge L4 mm 1643 1643 1643 1643
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 6
Fig.2
The standard props allow a minimum height of 2400mm and a maximum height of
3750mm.Consult your dealer or YHX and PRESTON for other special requirements. We can design
special props according to your requirements. Furthermore, CNG22, CNG26, CNG30, CNG32
can also be fixed to the concrete slab with bolt through slab.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 7
Page
The maximum allowable safe working load varies according to the different load
distribution position. The maximum allowable safe working load for three load cases (showed in
Fig.3) are given in table 1. The maximum allowable safe working load for other load distribution
position can be calculated through interpolation method or consult your dealer and YHX or PRESTON.
Q1=5000kg
Q2=3500kg
Q3=2500kg
Fig.3
The deadweight and load of the loading platform apply to the ceiling and the concrete
slab by the support props or the fixing anchoring bolts. The forces on the ceiling or the slab
When calculating the forces on the ceiling and floor from the loading platform, we used
following suppositions:
c) All loads are static loads, ie - no impact forces factored into the action forces;
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 8
Fig.4
Item Unit Fix platform with props Fix platform with bolt
E mm 000 250 500 750 000 250 500 750
D mm 1643 1393 1143 893 1220 970 720 470
L3+L4+E mm 4500 4750 5000 5250 4500 4750 5000 5250
SWL-UDL Kg 5000 4000 3200 2500 5000 4000 3200 2500
*
RA t 10.1 10.2 10.7 11.2 12.9 14.4 17.4 23.7
*
RB t 5.9 6.3 6.9 7.4 8.7 10.7 14.1 20.7
*
RC t -0.3 -0.1 0.2 0.6 -0.5 -0.5 -0.4 -0.4
Deflections at front support roller? 1 mm 5.5 6.9 8.4 10.5 4.1 4.7 5.4 6.5
Deflections at free end ? 2 mm 27.1 29.1 31.5 34.9 22.5 23 23.7 25.3
*Forces on building from each side of the platform
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 9
on the building for three distance “E” are listed in Table 2. According to the different distance
“E”, the different maximum allowable SWL are also listed in Table 2. The SWL corresponding
to SWL the different distance E are also painted in the H beam of the stationary frame.
Before installation of the superdecktm loading platform, make sure that the concrete slab and
the ceiling of the building must have enough strength to bear the forces RA, RB, RC from the
loading platform.
3 Transport
To transport the loading platform,
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 10
Page
4 Stack
To stack superdeck load platforms, firstly make the load platform into folded configuration
Place the platform in alternate directions, e.g. front to rear (see Fig.7) to prevent damage to
Place the bottom “H” frame(Fig.7⑤)to lay on the H beam of the lower platform and let the
bolt hole in upper platform align with lower one. Fasten SUPERDECK together by using 4-6 M16
WARNING
Secure all loose items on platform. No loose items on the deck of the platform.
Don’t stand under the lifting platform.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 11
5 Assembly
Before assembly of the superdeck loading platform, please read this
manual carefully at first. At the same time, the local safety regulations and
rules must also be understood. Prepare the necessary tools for assembly and
Put on the crash helmet, safe belt and other safety equipment or tools.
c) Loose the M16 bolts fixed the platform together,Lifting the top one
platform of the stack and put on the ground。
f) Close the front end doors(Fig.8,⑩,⑪) to vertical with side panel and
platform deck by adjusting the door adjustment(Fig.8,⑭) ;
g) Lock the door by door locking pin (Fig.8,⑫) and inserted bar
(Fig.8,⑬);
i) Erect the support props (Fig.8,⑮) and the top tie bar(Fig.8,⑯), insert
the jacks into the internal props.
j) Fix the handrails (Fig.8,⑰) and secure the handrail locks to side panel;
k) Pull the locking pin out of the rear locking hole in the H beam of the
stationary frame (Fig.5②) and unlock the movable deck;
l) Extend the movable deck to a full 8.5m length installation position and
insert two rear locking pins (Fig.5①)into the front locking hole in the
H beam of the stationary frame (Fig.5②).
m) Fix all components using M16 bolts, nuts and washers, secure all
components.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 12
Page
6 Installation
Before installation of the loading platform, please read this manual and the operation
6.1 Lifting
Fig.9 Lifting on truck
A. On truck
a) Assembly the loading platform according
b) Four 6m long wire rope or chains are Fig.10 Hanging the chains
preferred for liftting. Hook the wire rope or
Fig.10).
B. On ground
a) Unlock the movable deck by pulling the
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 13
Page
stationary frame.
WARNING
Secure all loose items on platform. No loose items on the deck of the platform.
Don’t stand under the lifting platform.
6.2 Installation
a) Lift superdeck loading platform on 4 wire rope or chains to floor level desired;
b) Reset the rear end of superdeck loading platform on the slab floor as shown Fig.12a.
d) Fasten the screw jacks and let the load of the loading platform be supported by the rear props.
e) After make sure that 2 rear props are secured, release 2 rear chains or wire rope so that
superdeck loading platform is lifted on 2 front chains or wire rope only as shown in Fig.12b.
f) Make sure that the front chains take the weight and release rear props.
g) Tilt up susperdeck slightly downward at rear and upward a height at front(see Fig.12b).
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 14
h) Place 2 rollers on floor 500-1000mm distance from the rear end of the loading platform under
the H beams of the stationary frame as shown Fig.12b. The roller is about 50mm diameter and
i) Place the front end of the loading platform downward until the loading platform becomes level
and the weight of rear end of the platform is support on the roller;
j) With the superdeck loading platform on only 2 chains, move superdeck inwards on rollers.
k) Push superdeck inwards until “H” frame touches the edge of floor slab.
l) Lift slightly the front end of the platform upward a height and let the front end of the platform
touch the floor until the roller pipes separate the H beam. Remove the rollers;
m) Place the platform on the slab floor and adjust the platform level;
n) Extend the internal props and tighten four props securely with M24 bolts. The props must be
o) Fasten the four screw jacks to loak the props in a vertical position between the floor and the
ceiling and make sure that the load and weight are supported by the four props.
r) Unbolt the rear tie bar in middle and lift 90°(upright) and bolt in locating hole in beam using
7 Dismantle
For the dismantle, reverse the procedure of installation.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 15
Fig.12a
Fig.12b
Fig.12c
Fig.12d
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 16
8 Operation
a) Before using this equipment, the operators must carefully read this manual and the operation
b) Personnel involved in the installation, dismantlement and using of the superdeck loading
platform must be trained by the authorized department. All local regulations and the
c) Personnel who use, install and maintain the equipment must put the crash helmet, safe belt and
h) The load in the loading platform should be put on the movable deck as close as possible to the
i) In general, "H" frame should touch the slab edge. If this is impossible, the maximum allowable
safe working load (SWL) should be reduced according to the instruction on the section 2.2 or
j) The doors must be closed at all times except for long loads. At this situation, use the chain for
safety.
k) When loading or unloading goods on the platform, always place the goods gently and avoid
l) The platform should be fully retracted when wind speed exceeds 20m/s.;
m) Keep decks and beams are clean, Ensure the platform surfaceis free from grease to prevent
worker slipping.
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 17
n) Inspect the platform periodically in accordance with local legislation requirement, report any
deck(Fig.5②);
b) Press the operation mechanism to raise the leveling ramp by foot(Fig.13). (if need to put down
f) Relocate the locking pins(Fig.5①) from the rear locking holes to the front locking holes in the
WARNING
DON’T ROLL SUPERDECK IN OR OUT WITH LOAD!
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 18
Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG series SUPERDECKtm Installation
z Lift SUPERDECK into pre-arranged location Fig.4-1,
(floor to be clean and level).
Loading Platform z Reset SUPERDECK into position with the ‘H’ frame ⑤
adjacent to the edge of the building.
Operation Instructions z Extend internal props ⑮ to a maximum permissible
height, fix top braces ⑯ in position .
Important
z Use adjustable jacks to lock props in a vertical
Do not commence unloading or loading or installation until you are
position between the floor and the ceiling.
confident of the safe use of the superdeck..
z Release and remove the hooks from lift points, release
Transport
the crane.
z Secure (two) rear locks ①.
z Unbolt the rear tie bar ③④ and fold into vertical
z Secure rear tie bar③④.
position and bolt to rear of beams in storage position
z Place SUPERDECK in a retracted configuration with the
fig 4-4.
front of the platform (doors) facing the cab of the
Operation regulations
truck.
z Before using this equipment, the operators must
Stack
carefully read this manual and the operation
z To stack SUPERDECK, place it in a fully folded
instructions found on a plate on the side panel;
configuration.
z All local regulations and the instructions in the user’s
z Let the platform in alternate directions, e.g. front to
manual should be complied.
rear to prevent damage to the folded side panels.
z Personnel who use, install and maintain the equipment
z Place the bottom “H” frame ⑤ to lay on the H beam
must put the crash helmet, safe belt and other safety
of the lower platform and let the bolt hole in upper
equipment or tools.
platform align with lower one.
z Don’t use excessive force to extend and retract the
z Fasten SUPERDECK together by using 4-6 M16 bolts and
platform.
nuts.
z Never overload the platform;
ASSEMBLE
z Don’t roll superdeck loading platform in or out with
z Unfold the side panels ⑦⑧ to vertical direction;
load in it.
z Fix 6×M16 locating bolts ⑨ for the side panels;
z Use minimal adjustable jack extension.
z Close the doors ⑩⑪ to vertical with side panel and
z The load in the loading platform should be put on the
platform deck, adjust the door adjustment ⑭;
movable deck as close as possible to the building slab
z Lock the door by door locking pin ⑫⑬ ;
and the centre of the deck.
z Fasten the 2-M16 bolt for the door adjustment ⑭;
z In general, "H" frame should touch the slab edge. If
z Erect the props ⑮ and the top tie bar ⑯,
this is impossible, the maximum allowable safe
z Fix the handrails ⑰ and secure the handrail locks;
working load (SWL) should be reduced according to
z Pull the locking pin① out and unlock the movable
the instructions on the use’s manual or the load sign
deck;
painted on the H beam of the stationary frame.
z Extend the movable deck to a full 8.5m length
z The doors must be closed at all times except for long
installation position and lock the locking pins①
loads. At this situation, use the chain for safety.
z Fix all components using M16 bolts, nuts and washers,
z When loading or unloading goods on the platform,
secure all components.
always place the goods gently and avoid shock load,
LIFTING
don’t crash platform.
z Assembly the platform and place it into retracted
z The platform should be fully retracted when wind
position;
speed exceeds 20m/s.;
z Lock all 4 locks⑱on handrail on rear of the side
z Keep decks and beams are clean, Ensure the platform
panels.
surfaceis free from grease to prevent worker slipping.
z Make sure the rear tie bar③④ in horizontal position ;
z Inspect the platform periodically in accordance with
z Secure crane-lifting hooks in marked lifting position,
local legislation requirement, report any damage or
Secure all loose items on platform.
loose components.