CNG 系列 superdeckTM 卸料平台

CNG Series SuperdeckTM Loading Platform

USER’S MANUAL

Add: 88#, Liangyuan Eastern Road, Liangtian Development Area, Zhuliao, Baiyun, Guangzhou, China
Tel:+8620-62654448 Fax:+8620-62856498 E-mail: gd-yhx@163.com WEB:www.gd-yhx.com

Add: 196 Silverwater Road, Silverwater in New South Wales, Australia Web:www.prestonaustralia.com
Tel: (+612)97484677 , Fax: (+612)96483591 , e-mail: mail@ prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 1

CONTENT
FOREWORD ........................................................................................................................................2

1 TECHNICAL DESCRIPTION ........................................................................................................3

2 TECHNICAL SPECIFICATIONS...................................................................................................5

2.1 SUPPORT PROPS HEIGHT ..........................................................................................................6


2.2 LOAD CASES ............................................................................................................................7
2.3 FORCES ON THE BUILDING ........................................................................................................7

3 TRANSPORT................................................................................................................................9

4 STACK ........................................................................................................................................10

5 ASSEMBLY ................................................................................................................................ 11

6 INSTALLATION ..........................................................................................................................12

6.1 LIFTING..................................................................................................................................12
6.2 INSTALLATION .........................................................................................................................13

7 DISMANTLE ...............................................................................................................................14

8 OPERATION ...............................................................................................................................16

8.1 REGULATIONS AND REQUIREMENTS FOR OPERATION .................................................................16


8.2 OPERATION PROCEDURE ........................................................................................................17
8.2.1 To retract the platform.......................................................................................................17
8.2.2 To extend the platform ......................................................................................................17

9 OPERATION INSTRUCTION ON PLATFORM...........................................................................18

Photographs and drawings are illustrative only and do not necessarily show the design

of the products on the market at any given point in time. The products must be used in

conformity with applicable practice and safety regulations. Specifications of the products

and equipment presented herein are subject to change without notice.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 2

FOREWORD
This product is designed and manufactured to meet strict quality and safety standard. This

manual is intended to provide advice and instructions to the operator and qualified service

personnel so that they can safely control the situations which can occur when the product is used,

and can carry out the required service and maintenance on the product.

This manual shall always be available with the equipment in order to guarantee that the

equipment can be used correctly and effectively.

GuangDong YeeHuaXing Construction Machinery Manufacture Co.,Ltd., simplified as

YHX or GD-YHX, is licensed the exclusive rights, by Preston Australia Pty Limited, to

manufacture and sale the patented Superdecktm Retractable Loading Platform in China and some

other asia countries.

Superdecktm is the registered trademark of Preston loading platform.

Read and understand


this user’s manual carefully
before using or servicing
this equipment

WARNING!
The equipment should not be operated if Instruction Manual is
missing. Misuse of this equipment could result in personal
injury or property damage.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 3
Page

1 Technical description
CNG series SuperdeckTM retractable loading platforms is a kind of

patented product developed by the leading platform technology expert

all over the world――Preston Australia Pty Limited and licensed the

exclusive rights of producing and selling in China and some other asia

country to GuangDong YeeHuaXing Construction Machinery

Manufacture Co.,Ltd..

CNG series SuperdeckTM retractable loading platforms is a unique

product to improve materials handling efficiency and safety for the

multi storey and high rise construction sectors. It offers a cost

effective method of delivering goods to different levels of a building

when used w i t h a crane. When goods are required to be delivered to a

particular floor level, all the platforms installed above that level can

be retracted, enabling the crane to operate unobstructed.

CNG series SuperdeckTM

retractable loading platforms

mainly consist of stationary

frame, moving frame and

adjustable support props. The

stationary frame is located on

the floor slab of the building and a “H” frame in

stationary frame is kept close to the slab edge; the

movable deck rolls in or out on the stationary frame by

the rollers fixed in the stationary frame and movable

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 4

deck. To receive the material, rolls the movable deck out of the building edge. If don’t use the

platform, retract the platform back. The adjustable support props support the platform between

the two floors by transforming the load to the ceiling.

Besides of above parts, there are the deck locking pin to lock the movable deck, side panels

with safety lanyard line and door adjustment, front end doors with door lock, safety chain for

longer loads.

A foot operated leveling ramp is provided to allow the trolley roll up the deck.

CNG series SuperdeckTM retractable loading platforms have four types: CNG22, CNG26,

CNG30 and CNG32 and the allowable maximum load capacity for uniform distribution load is

5t.

The sizes of CNG22 is designed to be able to transport with container.

Fig.1

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 5
Page

2 Technical specifications
Table 1: Technical specifications

Model Symbol Unit CNG22 CNG26 CNG30 CNG32

External width W1 mm 2165 2565 2965 3165

Internal width W2 mm 1651 2051 2451 2651

Distance between front and rear prop W3 mm 2235 2235 2235 2235

Distance between left and right prop W4 mm 2015 2415 2815 3015

Folded height/Stacking height H mm 500/405 500/405 500/405 500/405

Height of the side panel H1 mm 1070 1070 1070 1070

Min. prop height H2min mm 2400 2400 2400 2400

Max. prop height H2max mm 3750 3750 3750 3750

Retracted length L1 mm 5500 5500 5500 5500

Extend length L2 mm 8500 8500 8500 8500

Overhang length of stationary frame L3 mm 1400 1400 1400 1400

Distance between the front prop and the slab edge L4 mm 1643 1643 1643 1643

Extended length of movable deck L5 mm 3100 3100 3100 3100

Weight ` T t 2.3 2.5 2.7 2.8

Safe Working load (UDL) SWL t 5.0 5.0 5.0 5.0

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 6

Fig.2

2.1 Support props height

The standard props allow a minimum height of 2400mm and a maximum height of

3750mm.Consult your dealer or YHX and PRESTON for other special requirements. We can design

special props according to your requirements. Furthermore, CNG22, CNG26, CNG30, CNG32

can also be fixed to the concrete slab with bolt through slab.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 7
Page

2.2 Load cases

The maximum allowable safe working load varies according to the different load

distribution position. The maximum allowable safe working load for three load cases (showed in

Fig.3) are given in table 1. The maximum allowable safe working load for other load distribution

position can be calculated through interpolation method or consult your dealer and YHX or PRESTON.

Q1=5000kg
Q2=3500kg
Q3=2500kg

Fig.3

2.3 Forces on the building

The deadweight and load of the loading platform apply to the ceiling and the concrete

slab by the support props or the fixing anchoring bolts. The forces on the ceiling or the slab

floor of the building can be provided as Fig.4.

When calculating the forces on the ceiling and floor from the loading platform, we used

following suppositions:

a) Assumed load always centered on deck;

b) Self weight of the loading platform is calculated as 330kg/m;

c) All loads are static loads, ie - no impact forces factored into the action forces;

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 8

Fig.4

Item Unit Fix platform with props Fix platform with bolt
E mm 000 250 500 750 000 250 500 750
D mm 1643 1393 1143 893 1220 970 720 470
L3+L4+E mm 4500 4750 5000 5250 4500 4750 5000 5250
SWL-UDL Kg 5000 4000 3200 2500 5000 4000 3200 2500
*
RA t 10.1 10.2 10.7 11.2 12.9 14.4 17.4 23.7
*
RB t 5.9 6.3 6.9 7.4 8.7 10.7 14.1 20.7
*
RC t -0.3 -0.1 0.2 0.6 -0.5 -0.5 -0.4 -0.4
Deflections at front support roller? 1 mm 5.5 6.9 8.4 10.5 4.1 4.7 5.4 6.5
Deflections at free end ? 2 mm 27.1 29.1 31.5 34.9 22.5 23 23.7 25.3
*Forces on building from each side of the platform

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 9

d) All loads are working loads, ie - no load factors applied.

e) Horizontal forces not taken into account;

f) Reactions provided based on rigid supports, ie - effects of deflections of supporting


slabs not factored into design.
In the site condition, the “H” frame may keep a distance E from the slab edge, The forces

on the building for three distance “E” are listed in Table 2. According to the different distance

“E”, the different maximum allowable SWL are also listed in Table 2. The SWL corresponding

to SWL the different distance E are also painted in the H beam of the stationary frame.

Before installation of the superdecktm loading platform, make sure that the concrete slab and

the ceiling of the building must have enough strength to bear the forces RA, RB, RC from the

loading platform.

3 Transport
To transport the loading platform,

dismantle the support props and the top tie bar

firstly, then remove the door adjustment and

fix them on the movable deck. According to

Fig.2, fold the front end door and the side

panels and let the loading platform into folded


Fig.5
position.

Insert two rear locking pin (Fig.5①) into

the rear locking hole in the H beam of the

stationary frame (Fig.5②).

Secure the rear tie bar (Fig.6, ③,④),

stack superdeck. Place SUPERDECK in a retracted


Fig.6
configuration with the front of the platform

(doors) facing the cab of the truck.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 10
Page

4 Stack
To stack superdeck load platforms, firstly make the load platform into folded configuration

according to the instructions in above chapter。

Place the platform in alternate directions, e.g. front to rear (see Fig.7) to prevent damage to

the folded side panels.

Place the bottom “H” frame(Fig.7⑤)to lay on the H beam of the lower platform and let the

bolt hole in upper platform align with lower one. Fasten SUPERDECK together by using 4-6 M16

bolts and nuts (see Fig.7).

Fig.7 Stack SUPERDECK

WARNING
Secure all loose items on platform. No loose items on the deck of the platform.
Don’t stand under the lifting platform.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 11

5 Assembly
Before assembly of the superdeck loading platform, please read this
manual carefully at first. At the same time, the local safety regulations and
rules must also be understood. Prepare the necessary tools for assembly and
Put on the crash helmet, safe belt and other safety equipment or tools.

The assembly procedure of platform is as follow:

a) Clear the worksite for storage and assembly;

b) Lifting the stacked platforms from truck to ground by using suitable


crane or other tools.

c) Loose the M16 bolts fixed the platform together,Lifting the top one
platform of the stack and put on the ground。

d) Unfold the side panels(Fig.8,⑦and⑧)to vertical direction;

e) Fix 6×M16 locating bolts (Fig.8,⑨) for the side panels;

f) Close the front end doors(Fig.8,⑩,⑪) to vertical with side panel and
platform deck by adjusting the door adjustment(Fig.8,⑭) ;

g) Lock the door by door locking pin (Fig.8,⑫) and inserted bar
(Fig.8,⑬);

h) Fasten the 2-M16 bolt for the door adjustment(Fig.8,⑭);

i) Erect the support props (Fig.8,⑮) and the top tie bar(Fig.8,⑯), insert
the jacks into the internal props.

j) Fix the handrails (Fig.8,⑰) and secure the handrail locks to side panel;

k) Pull the locking pin out of the rear locking hole in the H beam of the
stationary frame (Fig.5②) and unlock the movable deck;

l) Extend the movable deck to a full 8.5m length installation position and
insert two rear locking pins (Fig.5①)into the front locking hole in the
H beam of the stationary frame (Fig.5②).

m) Fix all components using M16 bolts, nuts and washers, secure all
components.

n) For the used- or old-equipment, must check it carefully to make sure it


in good condition. If there is any damage or rusty, repair it before use.
Fig.8 Assembly

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 12
Page

6 Installation
Before installation of the loading platform, please read this manual and the operation

instructions on the side panels of SUPERDECKTM loading platform carefully.

6.1 Lifting
Fig.9 Lifting on truck
A. On truck
a) Assembly the loading platform according

to the instructions in above chapter and

place the loading platform into retracted

position; make sure that the locking pins

(Fig.5①)were inserted into the rear locking

hole in the stationary frame (Fig.5②);

b) Four 6m long wire rope or chains are Fig.10 Hanging the chains
preferred for liftting. Hook the wire rope or

chains on 4 holes of the lifting lugs(see

Fig.10).

c) Lift flat or slightly tilting downward at the

propping end. Lift the platform off truck

and put on the plain ground.

B. On ground
a) Unlock the movable deck by pulling the

locking pin (Fig.8,①) out of the rear

locking hole of the stationary frame;

b) Extend the movable deck to a full 8.5m

length and lock the movable deck by

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform 13
Page

inserting the locking ping into the front

locking hole in the H beam of the

stationary frame.

c) Lock all 4 locks ① and 18 on handrail

on rear of the side panels.

d) Make sure that the rear tie bar must be in

horizontal position and bolted;

e) Four 6m long wire rope or chains are

preferred for liftting. Hook the wire rope or

chains on 4 holes of the lifting lugs(see


Fig.11 Lifting
Fig.11).

f) Lift flat or slightly tilting downward at the

propping end . Lift the platform off truck

and put on the plain ground.

WARNING
Secure all loose items on platform. No loose items on the deck of the platform.
Don’t stand under the lifting platform.

6.2 Installation

a) Lift superdeck loading platform on 4 wire rope or chains to floor level desired;

b) Reset the rear end of superdeck loading platform on the slab floor as shown Fig.12a.

c) Extend and secure 2 rear internal props as shown Fig.12a.

d) Fasten the screw jacks and let the load of the loading platform be supported by the rear props.

e) After make sure that 2 rear props are secured, release 2 rear chains or wire rope so that

superdeck loading platform is lifted on 2 front chains or wire rope only as shown in Fig.12b.

f) Make sure that the front chains take the weight and release rear props.

g) Tilt up susperdeck slightly downward at rear and upward a height at front(see Fig.12b).

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 14

h) Place 2 rollers on floor 500-1000mm distance from the rear end of the loading platform under

the H beams of the stationary frame as shown Fig.12b. The roller is about 50mm diameter and

400mm length preferred;

i) Place the front end of the loading platform downward until the loading platform becomes level

and the weight of rear end of the platform is support on the roller;

j) With the superdeck loading platform on only 2 chains, move superdeck inwards on rollers.

k) Push superdeck inwards until “H” frame touches the edge of floor slab.

l) Lift slightly the front end of the platform upward a height and let the front end of the platform

touch the floor until the roller pipes separate the H beam. Remove the rollers;

m) Place the platform on the slab floor and adjust the platform level;

n) Extend the internal props and tighten four props securely with M24 bolts. The props must be

plumb 90°with the “H” beam of the stationary frame.

o) Fasten the four screw jacks to loak the props in a vertical position between the floor and the

ceiling and make sure that the load and weight are supported by the four props.

p) Fix the top tie bars between props(see Fig.8,⑯)

q) Fully secure all locks, bolts and other safety requirements.

r) Unbolt the rear tie bar in middle and lift 90°(upright) and bolt in locating hole in beam using

the 2 bolts from the middle connection.

s) After be sure of everything correct, release lifting chains.

7 Dismantle
For the dismantle, reverse the procedure of installation.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 15

Fig.12a

Fig.12b

Fig.12c

Fig.12d

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 16

8 Operation

8.1 Regulations and requirements for operation

a) Before using this equipment, the operators must carefully read this manual and the operation

instructions found on a plate on the side panel;

b) Personnel involved in the installation, dismantlement and using of the superdeck loading

platform must be trained by the authorized department. All local regulations and the

instructions in this manual should be complied.

c) Personnel who use, install and maintain the equipment must put the crash helmet, safe belt and

other safety equipment or tools.

d) Don’t use excessive force to extend and retract the platform.

e) Never overload the platform;

f) Don’t roll superdeck loading platform in or out with load in it.

g) Use minimal adjustable jack extension.

h) The load in the loading platform should be put on the movable deck as close as possible to the

building slab and the centre of the deck.

i) In general, "H" frame should touch the slab edge. If this is impossible, the maximum allowable

safe working load (SWL) should be reduced according to the instruction on the section 2.2 or

the load sign painted on the H beam of the stationary frame.

j) The doors must be closed at all times except for long loads. At this situation, use the chain for

safety.

k) When loading or unloading goods on the platform, always place the goods gently and avoid

shock load, don’t crash platform.

l) The platform should be fully retracted when wind speed exceeds 20m/s.;

m) Keep decks and beams are clean, Ensure the platform surfaceis free from grease to prevent

worker slipping.

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 17

n) Inspect the platform periodically in accordance with local legislation requirement, report any

damage or loose components.

8.2 Operation procedure

8.2.1 To retract the platform

a) Release the locking pins (Fig.5①) on the movable

deck(Fig.5②);

b) Press the operation mechanism to raise the leveling

ramp by foot(Fig.13). (if need to put down the ramp,

just press the front of the ramp by foot).


Fig.13
c) Roll superdeck in using push/pull bar on side panel;

d) Relocate the locking pins(Fig.5①) from the front

locking holes to the rear locking holes in the H beam of

the stationary frame (Fig.5②).

8.2.2 To extend the platform

a) Release the locking pins (Fig.5①) on the movable deck(Fig.5②);

b) Press the operation mechanism to raise the leveling ramp by foot(Fig.13). (if need to put down

the ramp, just press the front of the ramp by foot).

e) Roll superdeck out using push/pull bar on side panel;

f) Relocate the locking pins(Fig.5①) from the rear locking holes to the front locking holes in the

H beam of the stationary frame (Fig.5②).

WARNING
DON’T ROLL SUPERDECK IN OR OUT WITH LOAD!

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG.SM
CNG 系列 superdeckTM 卸料平台用户手册 Version V1.0
User Manual Of CNG Series SuperdeckTM Loading Platform
Page 18

9 Operation instruction on platform


On the side panel of each CNG series superdecktm, an operation instruction sheet can be found. If
the sheet was lost or damaged, a copy of following sign can be used.

Fig.14: Operation Instructions sheet

Guangdong Yeehuaxing Construction Machinery Manufacture Co., Ltd. P.B: 510545 WEB: www.gd-yhx.com E-mail: technic@gd-yhx.com
Preston Australia Pty Limited WEB: www.prestonaustralia.com E-mail: mail@prestonaustralia.com
CNG series SUPERDECKtm Installation
z Lift SUPERDECK into pre-arranged location Fig.4-1,
(floor to be clean and level).
Loading Platform z Reset SUPERDECK into position with the ‘H’ frame ⑤
adjacent to the edge of the building.
Operation Instructions z Extend internal props ⑮ to a maximum permissible
height, fix top braces ⑯ in position .
Important
z Use adjustable jacks to lock props in a vertical
Do not commence unloading or loading or installation until you are
position between the floor and the ceiling.
confident of the safe use of the superdeck..
z Release and remove the hooks from lift points, release
Transport
the crane.
z Secure (two) rear locks ①.
z Unbolt the rear tie bar ③④ and fold into vertical
z Secure rear tie bar③④.
position and bolt to rear of beams in storage position
z Place SUPERDECK in a retracted configuration with the
fig 4-4.
front of the platform (doors) facing the cab of the
Operation regulations
truck.
z Before using this equipment, the operators must
Stack
carefully read this manual and the operation
z To stack SUPERDECK, place it in a fully folded
instructions found on a plate on the side panel;
configuration.
z All local regulations and the instructions in the user’s
z Let the platform in alternate directions, e.g. front to
manual should be complied.
rear to prevent damage to the folded side panels.
z Personnel who use, install and maintain the equipment
z Place the bottom “H” frame ⑤ to lay on the H beam
must put the crash helmet, safe belt and other safety
of the lower platform and let the bolt hole in upper
equipment or tools.
platform align with lower one.
z Don’t use excessive force to extend and retract the
z Fasten SUPERDECK together by using 4-6 M16 bolts and
platform.
nuts.
z Never overload the platform;
ASSEMBLE
z Don’t roll superdeck loading platform in or out with
z Unfold the side panels ⑦⑧ to vertical direction;
load in it.
z Fix 6×M16 locating bolts ⑨ for the side panels;
z Use minimal adjustable jack extension.
z Close the doors ⑩⑪ to vertical with side panel and
z The load in the loading platform should be put on the
platform deck, adjust the door adjustment ⑭;
movable deck as close as possible to the building slab
z Lock the door by door locking pin ⑫⑬ ;
and the centre of the deck.
z Fasten the 2-M16 bolt for the door adjustment ⑭;
z In general, "H" frame should touch the slab edge. If
z Erect the props ⑮ and the top tie bar ⑯,
this is impossible, the maximum allowable safe
z Fix the handrails ⑰ and secure the handrail locks;
working load (SWL) should be reduced according to
z Pull the locking pin① out and unlock the movable
the instructions on the use’s manual or the load sign
deck;
painted on the H beam of the stationary frame.
z Extend the movable deck to a full 8.5m length
z The doors must be closed at all times except for long
installation position and lock the locking pins①
loads. At this situation, use the chain for safety.
z Fix all components using M16 bolts, nuts and washers,
z When loading or unloading goods on the platform,
secure all components.
always place the goods gently and avoid shock load,
LIFTING
don’t crash platform.
z Assembly the platform and place it into retracted
z The platform should be fully retracted when wind
position;
speed exceeds 20m/s.;
z Lock all 4 locks⑱on handrail on rear of the side
z Keep decks and beams are clean, Ensure the platform
panels.
surfaceis free from grease to prevent worker slipping.
z Make sure the rear tie bar③④ in horizontal position ;
z Inspect the platform periodically in accordance with
z Secure crane-lifting hooks in marked lifting position,
local legislation requirement, report any damage or
Secure all loose items on platform.
loose components.