Work Program List SHEET
2 12 K - - - - - 3 3
Professional
Airmen Training Institute at BAF Base
7 Associates Ltd 11 0 11 0% - -
Zahurul Haque in Chittagong
(Ar Monjur)
8 Cadet College - - - - - 3 3
9 BASB - - - - - 1 1
1 of
Porilekh (Ar
10 DGDP 1 1 0 100% - -
Aman)
11 DGFI - - - - - 7 6
12 MIST - - - - - 3 2
Professional
13 ISSB Associates Ltd 1 1 0 100% 1 1
(Ar Monjur)
TOTAL= 62 4 58 6% 115 71
2 of
WINGS)
11/11/2018 6:39
Wks Dte
Remarks
Remaining % Completion
0 100%
0 100%
14 70%
2 75%
- -
9 31%
- -
0 100%
0 100%
3 of
- -
1 86%
1 67%
0 100%
- -
0 100%
9 0%
8 0%
44 62%
4 of
SUMMARY OF PROJECTS (STRUCTURAL DRAWINGS)
Date & Time:
1 AFD - - - - - 5
2 12 K - - - - - 3
Advance
3 Sheikh Hasina Cantonment, Barisal Engineering (Engr. 52 46 6 88% -
Monaim)
Establishment of Faridpur Textile
4 - - - - - 8
Institute
MRA Architects
5 BNS SHER-E-BANGLA Patuakhali 39 0 39 0% -
(Arch Mamun)
Professional
Airmen Training Institute at BAF
7 Associates Ltd 11 0 11 0% -
Base Zahurul Haque in Chittagong
(Arch Monjur)
8 Cadet College - - - - - 3
9 BASB - - - - - 1
5 of
10 DGDP - - - - - 1
11 DGFI - - - - - 7
12 MIST - - - - - 3
Professional
13 ISSB Associates Ltd 1 1 0 100% 1
(Arch Monjur)
A+Aa
Mujib Battery Complex at Artillery
Consultants
14 Centre & School Halishahar, 5 0 5 0% -
Chittagong (Arch Bikash
Ansary)
6 of
AL DRAWINGS)
Date & Time: 11/11/2018 6:39
Wks Dte
Remarks
%
Completed Remaining
Completion
5 0 100%
3 0 100%
- 0 -
8 0 100%
- - -
5 8 38%
- - -
3 0 100%
1 0 100%
7 of
1 0 100%
6 1 86%
2 1 67%
1 0 100%
- - -
- - -
0 9 0%
0 8 0%
35 27 56%
8 of
Date & Time:
1 AFD - - - - 5
2 12 K - - - - 3
Professional
Airmen Training Institute at BAF
7 Associates Ltd 11 0 11 0% -
Base Zahurul Haque in Chittagong
(Arch Monjur)
8 Cadet College - - - - - 3
9 BASB - - - - - 1
9 of
Prolekh (Arch
10 DGDP 1 1 0 100% -
Aman)
11 DGFI - - - - - 4
12 MIST - - - - - 3
Professional
13 ISSB Associates Ltd 1 0 1 0% 1
(Arch Monjur)
A+Aa
Mujib Battery Complex at Artillery
Consultants
14 Centre & School Halishahar, 5 0 5 0% -
Chittagong (Arch Bikash
Ansary)
TOTAL= 59 1 58 2% 97
10 of
Date & Time: 11/11/2018 6:39
Wks Dte
Remarks
%
Completed Remaining
Completion
5 0 100%
3 0 100%
22 14 61%
6 2 75%
- - -
4 9 31%
- - -
3 0 100%
1 0 100%
11 of
- - -
3 1 75%
2 1 67%
1 0 100%
- - -
3 0 100%
0 9 0%
0 7 0%
53 43 55%
12 of
LIST OF DRAFTSMEN AND THEIR WORKING STATUS
16/09/18 17/09/18 18/09/18 19/09/18 20/09/18 21/09/18 22/09/18 23/09/18 24/09/18 25/09/18 26/09/18 27/09/18 28/09/18 29/09/18 30/09/18 01/10/18 02/10/18 03/10/18 04/10/18 05/10/18 06/10/18 07/10/18 08/10/18 09/12/18 10/13/18 11/10/18 12/10/18 10/13/18 14-10-18 15-10-18 16-10-18 17-10-18 18-10-18 19-10-18 20-10-18 21-10-18 22-10-18 23-10-18 24-10-18 25-10-18 26-10-18 27-10-18 28-10-18 29-10-18 30-10-18 31-10-18 01-11-18 02-11-18 03-11-18 04-11-18 05-11-18 06-11-18 07-11-18
Sl.
Name of Drafts Man Mobile No.
No .
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY
Coxs-Bazar-IB Coxs-Bazar-IB (Roof (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose Jirabo School SOIII Jirabo School SOIII Approach Road, Internal Approach Road, Internal
D/MAN-CLASS-A 8801731422661 Hall Hall Hall Hall Hall Hall Hall Hall Jirabo School Jirabo School Jirabo School Jirabo School Jirabo School Road, Box Road, Box SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School
2 (Roof top) top) Jirabo School SOIII [D] Jirabo School SOIII [D] Jirabo School SOIII [D] Jirabo School SOIII [D] - SOIII [D] [D] Bore location [D] Bore location --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- SAVAR School SOIII(D) SAVAR School SOIII(D) SOIII(D) SOIII(D) SAVAR School SOIII(D) SOIII(D) SOIII(D) SOIII(D)
SHREE MOLIN KUMAR SO-II (D) SO-II (D) Structure) Structure) Structure) Structure) Structure) Structure) Structure) Structure) plan shibchor plan shibchor SOIII [D] SOIII [D] SOIII [D] SOIII [D] Culvert,Garage, Water Culvert,Garage, Water SIII(D) SIII(D)
SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) Res. SOII(D) Res. SOII(D)
Railing Railing
Vertical extn Details Details Female Hostel Section Preparing
Elevation Preparing Authority
Jamalpur Of Of Jamalpur Textile Mosque Architecture Mosque Architecture Mosque Architecture Mosque Architecture Mosque Architecture Female Hostel Section Female Hostel Section Female Hostel Section Jamalpur Mosque MS PM Female Hostel Authority Female Hostel Faridpur Female Hostel Faridpur Female Hostel Faridpur
D/MAN-CLASS-C 8801922406370 Presentation (Pending) SM Barrack MS PM Architecture SO MS PM Archi tecture SO Female Hostel Faridpur Female Hostel Faridpur Approval dwg MS PM Architecture SO [preparing [preparing [prepari ng MS PM Architecture SO MS PM Arc hitec ture
3 (Academic, Diksha House Diksha House SO-II (A) Vertical Extentions SO - (Faridpur) (Faridpur) (Faridpur) (Faridpur) (Faridpur) Elevation Elevation Elevation - - Architecture SO- Architecture SO III III [A] III [A] Faridpur - Approval dwg III [A] --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- III [A] 1100hrs SO III [A] --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE ---
ISHRAT JAHAN RUNU Staff qtr) & Authority Approval drg & Authority Approval drg III [A] SO III [A] SO III [A] SO III [A] SO III [A] SO III [A] SO-III [A] SO-III [A] SO-III [A] MT Garage Lebukhali, III [A] [A] SO-III [A] SO-III [A] SO-III [A] (Sylhet Textile Institute) final draf t 25/10/18] fi nal draft 25/10/18] final draft 25/10/18]
1200 hrs Jamalpur (Sylhet Textile Institute) SO III [A] SO III [A] SO III [A]
SO-III (A) Principal Qtr Principal Qtr SO III [A] Female Hostel Faridpur
Mosque SO-III [A] SO III [A],
SO-lll (A) SO-lll (A)
Frontage Ltd
1 0 E6 Wks Dte 1 1
E6
1 0 Wks Dte 1 1
18-09-18
E6
1 0 Wks Dte 1 1
16-09-18
3 0 3 3
ural Drawing MEP Drawing
0 E6 Wks Dte 1 1 0
E6
0 Wks Dte 1 1 0
18-09-18
E6
0 Wks Dte 1 1 0
16-09-18
0 3 3 0
Remarks
Remarks
E6
E6
18-09-18
E6
16-09-18
Ser CA No & Name of Works
S
4 CA No. EINC/ 379 of 2017-2018
Construction of 1 x Garbage point including ancillary works for
Armed Forces Division (AFD) at Dhaka Cantt.
5 CA No. EINC/ 380 of 2017-2018
Extension of MT Garage including ancillary works for Armed
Forces Division (AFD) at Dhaka Cantt.
Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total
M/S. National Engineering &
Aluminium Fabrication
0 3
E6
1 0 Wks Dte 1 1
23-10-18
E6
1 0 Wks Dte 1 1
23-10-18
2 0 5 5
ural Drawing MEP Drawing
0 E6 Wks Dte 1 1 0
0 E6 Wks Dte 1 1 0
0 E6 Wks Dte 1 1 0
E6
0 Wks Dte 1 1 0
23-10-18
E6
0 Wks Dte 1 1 0
23-10-18
0 5 5 0
Remarks
Remarks
E6
E6
E6
E6
23-10-18
E6
23-10-18
Ser CA No & Name of Works Name of Contractor’s Firm
MSCL-SCML JV
(Mazid Sons Construction Ltd &
CA No. EINC/ 08 of 2017-2018
Shepherd Consultant and
Construction of 1 x 20 `C’/`D’/`E’ Type Officers’ quarters (6 storey with
Management Ltd JV)
1 14 storied foundation) incl ancillary works for Establishment of 99
Authorized Signatory: Mafiz
Composite Brigade for safety and security of Padma Multipurpose
Ahmed Bhuiyan
Bridge Project at Janzira, Shariatpur
Index No. EinC/A-46 (Army) & C-
895 (Army)
MSCL-SCML JV
(Mazid Sons Construction Ltd &
CA No. EINC/ 13 of 2017-2018 Shepherd Consultant and
Construction of 1 x 100 Metre Firing Range incl ancillary works for Management Ltd JV)
2
Establishment of 99 Composite Brigade for safety and security of Authorized Signatory: Mafiz
Padma Multipurpose Bridge Project at Janzira, Shariatpur Ahmed Bhuiyan
Index No. EinC/A-46 (Army) & C-
895 (Army)
E6 Advance
Drishik Revised Engineering
Tk. 21,01,44,515.95 Consultants 1 1 0 Drawings (Engr.
(Arch Shihir) SO III
[A]
Monaim)
Advance
Drishik
Engineering
Tk. 10,02,32,019.65 Consultants 1 1 0 E6
(Engr.
(Arch Shihir)
Monaim)
Advance
Engineering
Tk. 2,99,36,371.80 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 6,65,25,258.00 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 5,23,16,127.50 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 3,10,00,489.80 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 1,49,96,441.13 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 36,89,791.44 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 65,75,347.30 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 24,91,500.00 Wks Dte 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
Tk. 1,26,66,972.00 Wks Dte 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
Tk. 67,73,917.63 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 86,46,180.00 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 1,43,66,189.87 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Total= 10 10 0
Structural Drawing MEP Drawing
Drishik
1 1 0 E6 Consultants 1 0 1
(Arch Shihir)
Drishik
1 1 0 E6 Consultants 1 0 1
(Arch Shihir)
2 0 2
1 1 0 E6 1 1 0 E6
1 1 0 E6 0 0 0 N/A
1 1 0 E6 1 1 0 E6
1 1 0 E6 0 0 0 N/A
1 1 0 E6 1 1 0 E6
1 1 0 E6 0 0 0 N/A
1 1 0 E6 0 0 0 N/A
0 0 0 N/A 0 0 0 N/A
0 0 0 As Built 0 0 0 As Built
1 1 0 E6 0 0 0 N/A
1 1 0 E6 0 0 0 N/A
1 1 0 E6 0 0 0 N/A
12 12 0 3 3 0
Remarks
Architectural Drawing
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
Consultants Total Completed Remaining
CA No. EINC/ 64 of 2017-2018 SB Builders & Properties Ltd
Construction of 1 x Singlemen Barrack Complex (5 Storey with 5
storied foundation) with garage & Driver’s accn (2 Storey with 2 Managing Director: Md. Shahjahan
storied foundation) including ancillary works at Inf Bn for Bablu
1 Establishment of Sheikh Hasina Cantonment, Barisal (Barrack-2). Tk. 42,76,37,309.60 Wks Dte 1 1 0
Index No. C-989 (Army)
Total= 47 33 14
wing Structural Drawing MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining Remarks
Advance
Engineering
E6 1 1 0 E6 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
1 1 0 E6 Wks Dte 1 0 1
(Engr.
Monaim)
Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
18-09-18 (Engr. 18-09-18 18-09-18
Monaim)
Advance
Engineering
1 1 0 E6 1 0 1
(Engr.
Monaim)
Advance
Engineering
N/A 0 0 0 N/A 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
1 1 0 E6 1 0 1
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
04-11-2018 (Engr. 04-11-2018 04-11-2018
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 E6
(Engr.
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
As Built 0 0 0 As Built 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
1 0 1 SOIII [D] 1 0 1
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
10-09-18 (Engr. 10-09-18 10-09-18
Monaim)
Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)
Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
24-09-18 (Engr. 24-09-18 24-09-18
Monaim)
Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering SO-I (P&A) on 08-11-
1 1 0 1 0 1
(Engr. 2018 at 0900 Hrs
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
SO-I (P&A)
15102018 AT 1200 HRS
Advance
ALL SIGNATURE
Engineering
1 1 0 COMPLETE BUT 1 0 1
(Engr.
PENDING IN SECTION
Monaim)
FOR REVISED PILE
LONG SECTION
Advance
SOII [D]
Engineering
1 0 1 07/11/18 1 0 1
(Engr.
01:25 PM
Monaim)
Advance
Engineering
1 0 1 SOIII [D] 1 0 1
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
16-0918 (Engr. 16-0918 16-0918
Monaim)
Advance
Engineering
N/A 0 0 0 N/A 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering E6
As Built 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)
Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)
Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)
Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)
Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
23-10-18 (Engr. On 23-10-18 On 23-10-18
Monaim)
52 46 6 36 22 14
Ser CA No & Name of Works Name of Contractor’s Firm
TOT
Architectural Drawing Structu
CA Amount
Consultants Total Completed Remaining Remarks Consultants Total
MASTER COPY
Tk. 4,01,87,521.33 Wks Dte 1 0 1
SO II [A]
Wks Dte 1
MASTER COPY
SO III [A]
Tk. 6,12,19,300.00 Wks Dte 1 0 1
20181107 1145
Wks Dte 1
HRS
Tk. 3,00,19,641.49 Wks Dte 1 0 1 Wks Dte 1
MASTER COPY
back to section for
correction by SO II
Tk. 5,25,65,458.00 Wks Dte 1 0 1 [D] Wks Dte 1
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
Tk. 7,92,11,002.00 Wks Dte 1 0 1 [D] Wks Dte 1
07-11-2018
09:15 AM
TOTAL= 8 0 8 8
Structural Drawing MEP Drawing
0 1 Wks Dte 1 0 1
MASTER COPY
0 1 SO II [A] Wks Dte 1 0 1
20181105 1010 hrs
0 1 Wks Dte 1 0 0
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
MASTER COPY
back to section for
correction by SO II
0 1 [D] Wks Dte 1 0 1
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
0 1 [D] Wks Dte 1 0 1
07-11-2018
09:15 AM
0 8 8 0 7
Remarks
Remarks
MASTER COPY
SO II [A]
20181105 1010 hrs
E/M
MASTER COPY
back to section for
correction by SO II
[D]
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
[D]
07-11-2018
09:15 AM
Ser CA No & Name of Works Name of Contractor’s Firm
TOT
Architectural Drawing Structural Drawin
CA Amount
Consultants Total Completed Remaining Remarks Consultants Total
TOTAL= 9 0 9 9
Structural Drawing MEP Drawing
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1
0 9 9 0 9
Remarks
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
1
CA No. EINC/ 345 of 2017-2018 Advance Engineering
Digital Survey, Soil Test, Material Test & Load Test for Establishment Prop: Md. Monayem Hossain, Tk. 9,00,000.00
of Faridpur Textile Institute. M.Sc. Engg (Civil)
2
Shepherd Consultant and
CA No. EINC/ 401 of 2017-2018 Management Ltd
Construction of Officer Dormitory (4 storey building with 4 storied
foundation) including ancillary works for Establishment of Faridpur Managing Director: Mafiz Ahmed Tk. 3,71,38,848.94
Textile Institute. Bhuiyan
Index No. C-895 (Army)
3
Shepherd Consultant and
CA No. EINC/ 402 of 2017-2018 Management Ltd
Construction of Spinning Shed (Cotton & Jute) (2 storey building with 2
storied foundation) including ancillary works for Establishment of Managing Director: Mafiz Ahmed Tk. 9,41,43,914.54
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
4
Shepherd Consultant and
CA No. EINC/ 403 of 2017-2018 Management Ltd
Construction of Workshop cum Library (2 storey building with 2 storied
foundation) including ancillary works for Establishment of Faridpur Managing Director: Mafiz Ahmed Tk. 3,10,98,154.91
Textile Institute. Bhuiyan
Index No. C-895 (Army)
5
Shepherd Consultant and
CA No. EINC/ 404 of 2017-2018 Management Ltd
Construction of Female Hostel (100 bedded) (4 storey building with 4 Managing Director: Mafiz Ahmed Tk. 5,80,64,438.76
storied foundation) including ancillary works for Establishment of
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
6
Shepherd Consultant and
CA No. EINC/ 405 of 2017-2018 Management Ltd
Construction of Weaving Shed (Weaving & Knitting) (2 storey building Managing Director: Mafiz Ahmed Tk. 7,36,43,575.73
with 2 storied foundation) including ancillary works for Establishment of
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
7
Shepherd Consultant and
CA No. EINC/ 406 of 2017-2018 Management Ltd
Construction of Dyeing Shed (2 storey building with 2 storied Managing Director: Mafiz Ahmed Tk. 3,93,96,393.05
foundation) including ancillary works for Establishment of Faridpur
Textile Institute. Bhuiyan
Index No. C-895 (Army)
8
Shepherd Consultant and
CA No. EINC/ 407 of 2017-2018 Management Ltd
Construction of Academic Cum Administrative Building (4 storey
building with 4 storied foundation) including ancillary works for Managing Director: Mafiz Ahmed Tk. 10,04,72,849.91
Establishment of Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
9
Shepherd Consultant and
CA No. EINC/ 408 of 2017-2018 Management Ltd
Construction of Boys Hostel (100 bedded) (4 storey building with 4
storied foundation) including ancillary works for Establishment of Managing Director: Mafiz Ahmed Tk. 5,19,80,047.84
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
TOTA
Architectural Drawing Structural Drawing
E6
Wks Dte 1 1 0 Wks Dte 1 1
25-09-18
E6
Wks Dte 1 1 0 Wks Dte 1 1
24-09-18
E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018
MASTER COPY
Approved by SO II
Wks Dte 1 0 1 [D] Wks Dte 1 1
07-11-2018
14:00 hrs
E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018
E6
Wks Dte 1 1 0 Wks Dte 1 1
24-09-18
E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018
TOTAL= 8 6 2 8 8
ructural Drawing MEP Drawing
E6 E6
0 Wks Dte 1 1 0
25-09-18 25-09-18
E6 E6
0 Wks Dte 1 1 0
24-09-18 24-09-18
E6 E6
0 Wks Dte 1 1 0
24-09-18 04-11-2018
MASTER COPY
Approved by SO II
E6 [D]
0 Wks Dte 1 0 1
30-09-18 07-11-2018
14:00 hrs
E6 E6
0 Wks Dte 1 1 0
04-11-2018 04-11-2018
E6 E6
0 Wks Dte 1 1 0
24-09-18 24-09-18
E6 E6
0 Wks Dte 1 1 0
04-11-2018 04-11-2018
PILOT COPY
SO II [A] 20181011
E6
0 Wks Dte 1 0 1 1400 hrs Back to
16-09-18
Section for Corection
(stair issue)
0 8 6 2
Remarks
Ser CA No & Name of Works Name of Contractor’s Firm
E6
Tk. 2,04,32,574.95 Wks Dte 1 1 0
04-11-2018
Wks Dte
E6
Tk. 2,01,20,248.37 Wks Dte 1 1 0 Wks Dte
04-11-2018
E6
Tk. 2,91,70,255.91 Wks Dte 1 1 0
06-11-2018
Wks Dte
E6
Tk. 2,38,11,023.68 Wks Dte 1 1 0
06-11-2018
Wks Dte
MASTER COPY
06112018 1400
Tk. 4,52,30,957.73 Wks Dte 1 0 1
HRS back to sec
Wks Dte
fromTEC
E6
1 1 0 Wks Dte 1 0 1
16-09-18
E6
1 1 0 Wks Dte 1 1 0
04-11-2018
E6
1 1 0 Wks Dte 1 1 0
04-11-2018
1 0 1 Wks Dte 1 0 1
1 0 1 Wks Dte 1 0 1
1 0 1 Wks Dte 1 0 1
E6
1 1 0 Wks Dte 1 1 0
06-11-2018
E6
1 1 0 Wks Dte 1 1 0
06-11-2018
1 0 1 Wks Dte 1 0 1
MASTER COPY
Back to Draftsman
Sohel Rana
1 0 1 07112018 0815 Wks Dte 1 0 1
HRS by SO-II
(D)
1 0 1 Wks Dte 1 0 1
1 0 1 Wks Dte 1 0 1
13 5 8 13 4 9
Remarks
Remarks
E6
04-11-2018
E6
04-11-2018
E6
06-11-2018
E6
06-11-2018
N/A
Sent to Section
for Correction
06XWATCH TOWER
1 X NSD WARE HOUSE (01 STORIED)
Hossain Construction
MRA
(Pvt.) Ltd
ARCHITECTS
Managing Director: Md. Tk. 30,81,07,367.25 0
(ARCH
Anwar Hossain
MAMUN)
Index No. EinC/A-56 (Air)
MRA
NDE Steel Structures Ltd
ARCHITECTS
Managing Director: Imran Tk. 25,62,03,496.82 1
(ARCH
Mustafiz
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 10,00,53,653.39 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 13,73,69,389.43 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 35,63,84,636.52 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 7,37,70,028.32 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 17,95,22,824.27 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 13,04,35,706.50 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 10,06,72,488.83 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 4,00,23,238.16 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 5,00,49,012.32 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 2,91,20,645.75 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 9,43,03,762.22 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 6,14,54,260.14 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 4,08,91,334.99 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 16,77,38,427.82 1
(ARCH
Mazharul Islam
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,86,17,947.38 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,86,17,947.38 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 10,14,39,525.15 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 10,14,39,525.15 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 2,28,70,773.32 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 3,80,20,498.60 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,94,84,159.61 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,94,84,159.61 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 18,52,93,348.66 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
0 39 39 0
Structural Drawing MEP Drawing
MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
39 39 0
P Drawing
Remarks
Remaining Remarks
0 N/A
0 N/A
1
1
1
1
1
1
1
1
0 N/A
1
1
1
1
1
39
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
TOTA
Architectural Drawing Structural Drawing
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
TOTAL= 11 0 11 11 0 11
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)
11 0 11
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
M/S. Razzaque
CA No. EINC/ 198 of 2017-2018
Construction & Co
Construction of 1 x 10 Married ORs’ Qtr (5 storey with 5
1 Prop: Md. Anwar Hossain Tk. 2,79,65,516.70
storied foundation) including ancillary works for Jhenaidah
(Razzaque)
Cadet College.
Index No. EinC/B-131 (Navy)
TOTA
TOTA
E6
Wks Dte 1 1 0 Wks Dte 1 1 0
10-09-18
TOTAL= 3 3 0 3 3 0
TOTAL= 1 1 0 1 1 0
Prolekh (Arch
1 1 0 E6 Wks Dte 1 1 0
Aman)
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
E6 Wks Dte 1 1 0 E6
E6 E6
Wks Dte 1 1 0
10-09-18 10-09-18
E6 Wks Dte 1 1 0 E6
3 3 0
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
As built Wks Dte 0 0 0 As built
E6 Wks Dte 1 1 0 E6
1 1 0
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
Prolekh (Arch
E6 1 1 0 E6
Aman)
Ser CA No & Name of Works
M/S. Foresight
Developments
Prop: Maksud-Ul-Alam Tk. 1,74,75,374.55 Wks Dte 1
Chowdhury
Index No. C-618 (Air)
TOTAL= 7
Architectural Drawing Structural Drawing
1 0 E6 Wks Dte 1
1 0 E6 Wks Dte 1
E6
1 0 Wks Dte 1
16-09-18
1 0 E6 Wks Dte 1
E6
1 0 Wks Dte 1
24-09-18
1 0 E6 Wks Dte 1
6 1 7
Structural Drawing MEP Drawing
1 0 E6 Wks Dte 0 0
1 0 E6 Wks Dte 1 1
E6
1 0 Wks Dte 0 0
16-09-18
1 0 E6 Wks Dte 1 1
ASKED FOR
PBQ ON
0 1 10102018 BY Wks Dte 1 0
E6, DRAWING
IS COMPLETE
E6
1 0 Wks Dte 0 0
24-09-18
1 0 E6 Wks Dte 1 1
6 1 4 3
MEP Drawing
Remarks
Remaining Remarks
0 N/A
0 N/A
0 E6
0 N/A
0 E6
1 /L
0 N/A
0 E6
1
Ser CA No & Name of Works
M/S. S. A Traders
Prop: KH. Sarowar Ali Tk. 37,67,432.73 Wks Dte 0
Index No.D-25 (Navy)
TOTAL= 3
Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total
Professional
M/S. S. M Construction Associates
Tk. 26,32,00,149.31 1
Prop: Md.Hasibur Rahman Ltd ( Arch
Monjur)
TOTAL= 2
Architectural Drawing Structural Drawing
0 1 Wks Dte 1 0
1 0 E6 Wks Dte 1 1
1 0 E6 Wks Dte 1 1
2 1 3 2
Professional
Associates
1 0 E6 1 1
Ltd ( Arch
Monjur)
1 0 E6 Wks Dte 1 1
2 0 2 2
ural Drawing MEP Drawing
1 Wks Dte 1 0 1
0 E6 Wks Dte 1 1 0
0 E6 Wks Dte 1 1 0
1 3 2 1
Professional
Associates
0 E6 1 0 1
Ltd ( Arch
Monjur)
0 E6 Wks Dte 1 1 0
0 2 1 1
Remarks
Remarks
As Built
As Built
As Built
As Built
E6
E6
Remarks
Remarks
E6
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
TOTA
Architectural Drawing Structural Drawing
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
TOTAL= 5 0 5 5 0 5
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
5 0 5