SUMMARY OF PROJECTS (ARCHITECTURAL DRAWINGS)

Date & Time:

Name of Consultant Wks Dte


Sl.
Name of Description Consultant
No. %
(If Required) Total Completed Remaining Total Completed
Completion
Basa Bari Ltd
1 AFD 3 0 3 0% 2 2
(Part)

2 12 K - - - - - 3 3

3 Sheikh Hasina Cantonment, Barisal - - - - - 47 33

Establishment of Faridpur Textile


4 - - - - - 8 6
Institute
MRA Architects
5 BNS SHER-E-BANGLA Patuakhali 39 0 39 0% - -
(Ar Mamun)

Sheikh Hasina Textile Engineering


6 - - - - - 13 4
College, Melandah, Jamalpur

Professional
Airmen Training Institute at BAF Base
7 Associates Ltd 11 0 11 0% - -
Zahurul Haque in Chittagong
(Ar Monjur)

8 Cadet College - - - - - 3 3

9 BASB - - - - - 1 1

1 of
Porilekh (Ar
10 DGDP 1 1 0 100% - -
Aman)
11 DGFI - - - - - 7 6

12 MIST - - - - - 3 2

Professional
13 ISSB Associates Ltd 1 1 0 100% 1 1
(Ar Monjur)

Mujib Battery Complex at Artillery A+Aa


14 Centre & School Halishahar, Consultants (Ar 5 0 5 0% - -
Chittagong Bikash Ansary)

Establishment of 99 Composite Drishik


15 Brigade for safety and security of Consultants (Ar 2 2 0 100% 10 10
Padma Multipurpose Bridge Project Shihir)

Sheikh Russel Textile Engineering


16 - - - - - 9 0
College, Sylhet

17 Sylhet Textile Institute. - - - - - 8 0

TOTAL= 62 4 58 6% 115 71

2 of
WINGS)
11/11/2018 6:39

Wks Dte
Remarks
Remaining % Completion

0 100%

0 100%

14 70%

2 75%

- -

9 31%

- -

0 100%

0 100%

3 of
- -

1 86%

1 67%

0 100%

- -

0 100%

9 0%

8 0%

44 62%

4 of
SUMMARY OF PROJECTS (STRUCTURAL DRAWINGS)
Date & Time:

Name of Consultant Wks Dte


Sl.
Name of Description Consultant
No. %
(If Required) Total Completed Remaining Total
Completion

1 AFD - - - - - 5

2 12 K - - - - - 3

Advance
3 Sheikh Hasina Cantonment, Barisal Engineering (Engr. 52 46 6 88% -
Monaim)
Establishment of Faridpur Textile
4 - - - - - 8
Institute
MRA Architects
5 BNS SHER-E-BANGLA Patuakhali 39 0 39 0% -
(Arch Mamun)

Sheikh Hasina Textile Engineering


6 - - - - - 13
College, Melandah, Jamalpur

Professional
Airmen Training Institute at BAF
7 Associates Ltd 11 0 11 0% -
Base Zahurul Haque in Chittagong
(Arch Monjur)

8 Cadet College - - - - - 3

9 BASB - - - - - 1

5 of
10 DGDP - - - - - 1

11 DGFI - - - - - 7

12 MIST - - - - - 3

Professional
13 ISSB Associates Ltd 1 1 0 100% 1
(Arch Monjur)
A+Aa
Mujib Battery Complex at Artillery
Consultants
14 Centre & School Halishahar, 5 0 5 0% -
Chittagong (Arch Bikash
Ansary)

Establishment of 99 Composite Advance


15 Brigade for safety and security of Engineering (Engr. 12 12 0 100% -
Padma Multipurpose Bridge Project Monaim)

Sheikh Russel Textile Engineering


16 - - - - - 9
College, Sylhet

17 Sylhet Textile Institute. - - - - - 8

TOTAL= 120 59 61 49% 62

6 of
AL DRAWINGS)
Date & Time: 11/11/2018 6:39

Wks Dte
Remarks
%
Completed Remaining
Completion

5 0 100%

3 0 100%

- 0 -

8 0 100%

- - -

5 8 38%

- - -

3 0 100%

1 0 100%

7 of
1 0 100%

6 1 86%

2 1 67%

1 0 100%

- - -

- - -

0 9 0%

0 8 0%

35 27 56%

8 of
Date & Time:

Name of Consultant Wks Dte


Sl.
Name of Description Consultant
No. %
(If Required) Total Completed Remaining Total
Completion

1 AFD - - - - 5

2 12 K - - - - 3

3 Sheikh Hasina Cantonment, Barisal - - - - 36

Establishment of Faridpur Textile


4 - - - - 8
Institute
MRA Architects
5 BNS SHER-E-BANGLA Patuakhali 39 0 39 0% -
(Arch Mamun)

Sheikh Hasina Textile Engineering


6 - - - - - 13
College, Melandah, Jamalpur

Professional
Airmen Training Institute at BAF
7 Associates Ltd 11 0 11 0% -
Base Zahurul Haque in Chittagong
(Arch Monjur)

8 Cadet College - - - - - 3

9 BASB - - - - - 1

9 of
Prolekh (Arch
10 DGDP 1 1 0 100% -
Aman)
11 DGFI - - - - - 4

12 MIST - - - - - 3

Professional
13 ISSB Associates Ltd 1 0 1 0% 1
(Arch Monjur)

A+Aa
Mujib Battery Complex at Artillery
Consultants
14 Centre & School Halishahar, 5 0 5 0% -
Chittagong (Arch Bikash
Ansary)

Establishment of 99 Composite Drishik


15 Brigade for safety and security of Consultants (Arch 2 0 2 0% 3
Padma Multipurpose Bridge Project Shihir)
Sheikh Russel Textile Engineering
16 - - - - - 9
College, Sylhet
17 Sylhet Textile Institute. - - - - - 8

TOTAL= 59 1 58 2% 97

10 of
Date & Time: 11/11/2018 6:39

Wks Dte
Remarks
%
Completed Remaining
Completion

5 0 100%

3 0 100%

22 14 61%

6 2 75%

- - -

4 9 31%

- - -

3 0 100%

1 0 100%

11 of
- - -

3 1 75%

2 1 67%

1 0 100%

- - -

3 0 100%

0 9 0%

0 7 0%

53 43 55%

12 of
LIST OF DRAFTSMEN AND THEIR WORKING STATUS

16/09/18 17/09/18 18/09/18 19/09/18 20/09/18 21/09/18 22/09/18 23/09/18 24/09/18 25/09/18 26/09/18 27/09/18 28/09/18 29/09/18 30/09/18 01/10/18 02/10/18 03/10/18 04/10/18 05/10/18 06/10/18 07/10/18 08/10/18 09/12/18 10/13/18 11/10/18 12/10/18 10/13/18 14-10-18 15-10-18 16-10-18 17-10-18 18-10-18 19-10-18 20-10-18 21-10-18 22-10-18 23-10-18 24-10-18 25-10-18 26-10-18 27-10-18 28-10-18 29-10-18 30-10-18 31-10-18 01-11-18 02-11-18 03-11-18 04-11-18 05-11-18 06-11-18 07-11-18
Sl.
Name of Drafts Man Mobile No.
No .
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY MONDAY TUESDAY WEDNESDAY

DWKS MOSQUE- Female Hostel


Boys Hostel: STRUCTURE SO-II (D) DWKS MOSQUE- Boys Hostel
(Jamalpur, DWKS MOSQUE- DWKS MOSQUE- DWKS MOSQUE-
-URGENT. STRUCTURE SO-II (D) STRUCTURE SO-II (D) Changing names for Boys' Hostel STRUCTURE SO-II (D) Workshop Cum Library Workshop Cum Library Workshop Cum Library ARCHITECTURE SO-II [D] Correction Boys Boys Hostel Jamalpur Boys Hostel Sylhet SOIII Boys Hostel Sylhet SOIII
Lift Core Academic bldg Female Hostel Sylhet Pile long section Boys Hostel Manda Boys Hostel Manda Manda Correction,
D/MAN-CLASS-A Faridpur MEP) Pump House Lebukhali -URGENT. -URGENT. -URGENT. Architecture (Faridpur) Architecture & Boys' Architecture & Boys' -URGENT. Correction Boys Boys Hostel Jamalpur Boys Hostel Jamalpur Boys Hostel Boys Hostel Jamalpur Boys Hostel Jamalpur Lift Core Academic bldg Jamalpur SOII[D] Female Hostel Sylhet Female Hostel Sylhet College,Boys Vertical extension ofcr Vertical extension ofcr Vertical extension ofcr Vertical extension Boys Correction, Coxs Correction, Coxs
1 MD TOFFAZEL HOSSAIN 8801675751371 Sylhet Textile Institute (Jamalpur) - Hostel,Jamalpur SOII [D] SOII [D] Jamalpur SOII [D] SOII [D] SOII [D] SOII [D],E in C [D] Master Copy [D] Master Copy Sylhet College Shibchor Textile Bazar Sub Station Coxs Bazar Sub
Workshop: SO II [D] under the SO III [A] SO III [A] SO III Hostel (Faridpur) Hostel (Faridpur) Staff Dormitory (Jamalpur) Hostel,Jamalpur
SOII [D] residence JamalpurSOII[D UPDATE WILL BE College SOIII(D) College SOIII(D)
SOIII(D)
Hostel Sylhet
9:30SOIII(D)
Dorm and Boys Hostel Dorm and Boys Hostel Pirganj Hostel Pirganj Bazar Sub Station
Station Corrrection
(Faridpur Arch) surpervision of SO II [A] SO III [A] SO III [A] SHOWN AT 1000 HRS Institute, Correction Corrrection SOII(D) Corrrection SOII(D)
SO III [D] SOII(D)
SO-III (A) [WKS] E/M 9:30SOIII(D)

Coxs-Bazar-IB Coxs-Bazar-IB (Roof (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose (Jamalpur Multipurpose Jirabo School SOIII Jirabo School SOIII Approach Road, Internal Approach Road, Internal
D/MAN-CLASS-A 8801731422661 Hall Hall Hall Hall Hall Hall Hall Hall Jirabo School Jirabo School Jirabo School Jirabo School Jirabo School Road, Box Road, Box SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School SAVAR School
2 (Roof top) top) Jirabo School SOIII [D] Jirabo School SOIII [D] Jirabo School SOIII [D] Jirabo School SOIII [D] - SOIII [D] [D] Bore location [D] Bore location --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- SAVAR School SOIII(D) SAVAR School SOIII(D) SOIII(D) SOIII(D) SAVAR School SOIII(D) SOIII(D) SOIII(D) SOIII(D)
SHREE MOLIN KUMAR SO-II (D) SO-II (D) Structure) Structure) Structure) Structure) Structure) Structure) Structure) Structure) plan shibchor plan shibchor SOIII [D] SOIII [D] SOIII [D] SOIII [D] Culvert,Garage, Water Culvert,Garage, Water SIII(D) SIII(D)
SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) SO-II (D) Res. SOII(D) Res. SOII(D)

Railing Railing
Vertical extn Details Details Female Hostel Section Preparing
Elevation Preparing Authority
Jamalpur Of Of Jamalpur Textile Mosque Architecture Mosque Architecture Mosque Architecture Mosque Architecture Mosque Architecture Female Hostel Section Female Hostel Section Female Hostel Section Jamalpur Mosque MS PM Female Hostel Authority Female Hostel Faridpur Female Hostel Faridpur Female Hostel Faridpur
D/MAN-CLASS-C 8801922406370 Presentation (Pending) SM Barrack MS PM Architecture SO MS PM Archi tecture SO Female Hostel Faridpur Female Hostel Faridpur Approval dwg MS PM Architecture SO [preparing [preparing [prepari ng MS PM Architecture SO MS PM Arc hitec ture
3 (Academic, Diksha House Diksha House SO-II (A) Vertical Extentions SO - (Faridpur) (Faridpur) (Faridpur) (Faridpur) (Faridpur) Elevation Elevation Elevation - - Architecture SO- Architecture SO III III [A] III [A] Faridpur - Approval dwg III [A] --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE --- III [A] 1100hrs SO III [A] --- LEAVE --- --- LEAVE --- --- LEAVE --- --- LEAVE ---
ISHRAT JAHAN RUNU Staff qtr) & Authority Approval drg & Authority Approval drg III [A] SO III [A] SO III [A] SO III [A] SO III [A] SO III [A] SO-III [A] SO-III [A] SO-III [A] MT Garage Lebukhali, III [A] [A] SO-III [A] SO-III [A] SO-III [A] (Sylhet Textile Institute) final draf t 25/10/18] fi nal draft 25/10/18] final draft 25/10/18]
1200 hrs Jamalpur (Sylhet Textile Institute) SO III [A] SO III [A] SO III [A]
SO-III (A) Principal Qtr Principal Qtr SO III [A] Female Hostel Faridpur
Mosque SO-III [A] SO III [A],
SO-lll (A) SO-lll (A)

Preparing Print Brig. Asraf SEAT PLAN


Print Preparing residence SOII(A), Flag FLAG STAFF HOUSE
Printing Sub Station & Authority Preparing Preparing PRINT-SO-III (D), Not MAC -2018
Authority Authority Authority Authority Correction Staff Sheikh Rasel Textile Sheikh Rasel Textile Sheikh Rasel Textile Mosque Architecture Preparing Approval dwg Preparing Preparing Staff HouseSOIII(D) SO III [A] 10:30- MES IB B. Wall Staff Qtr Vertical
Approval dwg Approval dwg Sheikh Rasel Textile Sheikh Rasel Textile Sheikh Rasel Textile Engineering College , Engineering College , Engineering College , Mosque Architecture Mosque Architecture (Lebukhali) Staff Dormitory O.G.W.R. Authority Authority Authority Authority Authority printing Yt for Plotter pblm Printing offrs mess MES IB Dhaka B. Foundation Detail Staff Dorm Vertical Staff Qtr Vertical Staff Qtr Vertical extension Print PMB GATE
D/MAN-CLASS-C Approval dwg Approval dwg Dormitory & Principal [Melandah] (Faridpur Textile) [0945 Approval dwg Approval dwg Motherganj Bore hole Flag Staff House Flag Staff House + 11:30,Flag staff house Bore Hole Location Wall Detail Drawing Bore Hole Location PMB GATE SO I II [A]
4 8801737727285 (Faridpur Textile)+ prep (Faridpur Textile)+ prep Engineering College SO Engineering College SO Engineering College SO Sub Station, Cycle Stand Sub Station, Cycle Sub Station, Cycle (Lebukhali) (Lebukhali) Staff Dormitory (Jamalpur) - - Approval dwg Approval dwg Approval dwg lebukhali, IB renovation Lebukhali 6 set print, Drawing, Staff Dorm extension Pirganj extension Pirganj extension Pirganj Pirganj , Female [ 0945
MD SHAFIQUL ISLAM (Faridpur) (Faridpur Textile) Qtr for Authority HDM Bari hrs] Authority (Sylhet Textile location plan Lebukhali SOIII(D) Lebukhali SOIII(D) Motherganj Motherganj SO III [A]
SO-III (A) new 3 new 3 SO-III (A) Lebukhali Approval SO III [A]
III [A] III [A] III [A] & O.G.W.R. [Melandah] Stand & O.G.W.R. Stand & O.G.W.R. SO III [A] SO III [A] (Jamalpur) SO SO III [A] Madaripur Plinth (Faridpur Textile) Approval dwg (Sylhet Textile Institute) (Sylhet Textile Institute) (Sylhet Textile Institute)
WIDRAWN 1115 hrs SEAT PLAN design detail SOIII(D) ofcrs mess Lebukhali SOIII(D) Vertical extension SOIII(D) SOIII(D), SOIII(D) ,CCTV(SAO) Hostel Correction hrs]
SO-III (A) + Master Plan SO-III (A) + Master Plan SO III [A] [Melandah] SO III [A] [Melandah] SO III [A] III [A] SO III [A] SO III [A] Institute) SO III [A] PirganjSOIII(D) Manda (H/D)
Mosque SO II [D] area Compare (JCO's Mess Lebukhali) SO III [A] SO III [A] MAC -2018 Compare Structure with
for all Faridpur Drawings for all Faridpur Drawings [1000 hrs] SO III [A] SOIII [A] Arch.
Pabna DGFI
Pri nt- Test pile location With Lift core Female Hostel Lift core Female Hostel Boundary Wall
#Female Hostel Print CD Type-2
Printing 4 MT Female Hostel [Vertical co-ordinate for Jamalpur ,SOII(D) Jamalpur ,SOII(D) lebukhali ,Weaving SO II[D]
(Faridpur) Printing CD Extention ] PENDING Sylhet,SOIII(D) SYLHET TEXTILE
Female Hostel #AFD-Garbage Sylhet Textile Institute Academic Academic Building Academic Building Garage Lebukhali type,Btype, JCOS Academic Female Hostel Sylhet Female Hostel Sylhet Shed Sylhet ; Female Hostel Vertical Female Hostel Vertical Workshop Cum Dying Shed Sylhet
D/MAN-CLASS-C EinC's Residence AFD Garrage & Print 1 set for all Proj & Faridpur SO III [D] Faridpur SO III [D] Female Hostel Faridpur Female Hostel F aridpur Textile List HDM Sylhet Academic Printing CD Academic building Sylhet Academic Sylhet Academic 0900 hrs Sylhet Sylhet Academic bldg FEMALE HOSTEL-SO-II Female Hostel Weaving Shed Weaving Shed Sylhet Dyeing Shed
5 MD RAHINUL ISLAM 8801734104044 (Faridpur) #Pabna SO-II (D) Garbage Point Building Faridpur Female Hostel Faridpur Female Hostel Faridpur Working SO III [A] Working SO III [A] - - - - - - - Bari Building printing CD qtr,100 ofcrs type,Correction Jcos Qtr Sylhet( 2) SOIII(D) bldg,Dyeing Shed Building Faridpur bldg,Dyeing Shed SOIII Academic bldg,Dyeing Final print [D], WILL GIVE UPDATE Institute, Dyeing Shed Institute, Dyeing Shed Sylhet SOII(D) SOII(D) extension extension Pirganj Female Hostel Pirganj, Correction SOII(D), Library Sylhet Institute Institute
SO-II (D) Boundary Wall SO-II (D) Female Hostel Faridpur SO III [D] mess,Followers SOIII [D] SOIII [D] SO III [D] [D] SOII(D) SOII(D) Faridpur PirganjSOIII(D) SOIII(D) SOII(D)
SO-ll (D) SO III [A] Working SO III [A] Working SO III [A] type and B type Shed Sylhet Textile ON 1230 HRS CORRECTION FOR
Qtr, SOIII [D] Vertical Extention
Lebukhali Mosque-02 Borehole plan SOIII [D] TEC BY HDM BARI Female Hostel
Nos Final Print Pirganj
Boys' Hostel (Faridpur) Progress Report Correction SO III [A]
Weaving Shed, Textile List JCO's Qtr Lebukhali
SO-III [A] Sheikh Rasel Boys HDM Bari Academic bldg and [Submitted to HDM to Correction Jamalpur
Spinning Shed Weaving Shed MT Garage Print MT Garage Print C/D Type Qtr Lebukhali SO III [D] SEAT PLAN
(Arch) Female Correction Weaving Boys' Hostel (Faridpur) Weaving Shed Architectural SO III [A] Weaving Shed Weaving Shed Staff Dormitory & Boys Staff Dormitory & Boys BRIG GEN ASHRAF Hostel (Pending) 0900 hrs MT offrs qtr SO III [D] [Done 1100 hrs] Textile List Works by SO II [A] 1200 check] PENDING 0900 Jamalpur Female JCO's Qtr Lebukhali Jamalpur Mosque Academic Building Academic Building MES ANNUAL SEAT PLAN Print & Officers' Qtr Academic bldg Academic Bldg ;
D/MAN-CLASS-C Stair correction 0845 Boys' Hostel (Faridpur) Assisted HDM Hostel Sheikh Rasel Hostel Sheikh Rasel Jamalpur Vertical Progress Report Garage Lebukhali, SO III [D] 1145 hrs Assisted HDM hrs hrs JCO's Qtr Lebukhali JCO's Qtr Lebukhali Lift Core Academic bldg SO III [D] SO III [D] Jamalpur [Lift Jamalpur [Lift Dyeing Shed Shylhet Officers' Qtr Pirganj MES ANNUAL Officers' Qtr Pirganj Pirganj Academic
HDM Textile List Hostel [Vertical
6
MD SOHEL RANA
8801792784372 Hostel Shed done, SO-III [A]
SO III [D] MasterPlan SO-III [A] Ashok
MEP Drawing for Architectural print Architectural print
[Architecture] [Architecture]
SIR'S [SHAGUFTA]
Extention Print SM Barrack MT
-
Bari SO III
Mirpur DOHS
Mirpur Restaurant MEP
SO III [D]
SO III Ashok Jamalpur Female Extention] SO III [D] SO III [D] Jamalpur Arch.SOII[D] Military
Military Farm
MEP
Section] Section] SO III [A] CONFERENCE 2018 SO III CONFERENCE 2018 Pirganj SO III Pirganj
bldg Pirganj
(Faridpur) Lebukhali Mosque Print DWks Mosque SO III SO III [A] SO III [A] MEP SO-III [A] Jamalpur Toilet Fixtures [A] SO III [A] SO III [A] Farm HDM BARI [preparing final draft HDM BARI SO II I [A] 0930 [A] SO III [A] [A] SO III [A]
Print, Diksha House SO III [A] SO III [A] Garage Lebukhali" [D] Correction DOHS Restaurant Hostel [Vertical HDM BARI HDM Bari hrs SO III [A] SO III
SO-III (A) - 1 SET Window Grill Detailing & [D] SO-III [A] Academic bldg and MEP SO III [A] SO III [A] HDM Bari Extention] 25/10/18] [A]
SO III [A] SO III [A]
Booklet SO-III [A] offrs qtr 1000 hrs
SO I (Wks) Rack
Scan MS PM FURNITURE
SO I (Wks) Rack Draft FURNITURE Draft
"Documents
AHQ Renovation drg
Print & Scan BGMC Plans BGMC Plans BGMC Plans BGMC Plans BGMC Plans BGMC Plans Lift Core Pirganj Architecture SO III Boys Hostel Sheikh
Boys Hostel Sheikh Boys Hostel Boys Hostel Sheikh Boys Hostel Sheikh Boys Hostel Sheikh SYLHET TEXTILE SYLHET TEXTILE FURNITURE FURNITURE FURNITURE [29/11/18] FURNITURE
FURNITURE [29/11/18]
D/MAN-CLASS-C Drafting of SO-I & drafting SO-lIl [A] Print "Documents [Madarganj Office Bldg] [Madarganj Office Bldg]
[Madarganj ] [Madarganj ] [Madarganj ] [Madarganj ] Master Plan Print HDM Bari 1300 hrs [A] [Pending 1030 Rasel Architecture Rasel Section Sheikh Rasel
Rasel Architecture Rasel Architecture Rasel Architecture
Boys Hostel Sheikh Boys Hostel Sheikh SYLHET TEXTILE BOYS SYLHET TEXTILE BOYS SYLHET TEXTILE BOYS BOYS HOSTEL BOYS HOSTEL FURNITURE [29/11/18] [29/11/18] [29/11/18]
[29/11/18] SO
7 8801783870010 [wks] Boundary Books" & Assisting HDM - SO II SO II - - MS PM hr s ] Boys Hostel Ground Floor Section - Rasel Architecture Rasel Architecture --- LEAVE --- HOSTEL [30/10/18] HOSTEL [30/10/18] HOSTEL [30/10/18] [29/11/18] SO I I [A] SO I I [A] SO II [A] SO II [A] II [A]
RUMANA Wall SO-ll (Arch) AHQ MES IB COX'S BAZAR for Books" [D] SO [D] SO SO II [D] SO II [D] SO II [D] SO II [D] SO-III [A] Architecture SO III Sheikh Rasel Modification [1000 hrs ] SO III SO III SO III SO III [A] SO III [A] SO III [A] SO III [A] SO III [A] [30/10/18] [30/10/18] SO II [A] SO II [A] [29/11/18]
SO-lI [A] SO III [A] SO III [A] SO III [A] SO III [A] SO III [A] SO [A] [A] [A] SO III [A] SO III [A] [ 3]
Renovation drg drafting SO-ll (Arch) III [A] III [A] [A] Architecture SO III SO III [A] III [A] [ 3 + 1/2 ] [ 1/2 + 2 ] [ 1] [2 ] SO II [A]
[1 ] 45 / 110
SO-lIl (Arch) [A] 47 / 110
[ 1+]
Pirganj Vertical Ext Sylhet Textile
DWKS MOSQUE- Faridpur Mosque HDM Bari Authority Approval Institute Female
Jamalpur Mosque -3D FARIDPUR TEXTILE SYLHET TEXTILE Hostel
ARCHITECTURE SO-II [Pending 1030 [PENDING 1030 INSTITUTE BOYS Drawing for Shaheed Jamalpur Mosque
Offrs' DWKS MOSQUE- DWKS MOSQUE- DWKS MOSQUE- Staff Dormitory-3D Staff Dormitory- Staff Dormitory-3D (A) -URGENT. Jamalpur Mosque -3D Jamalpur Mosque -3D Jamalpur Mosque -3D Jamalpur Mosque -3D Jamalpur Mosque -3D Modelling DWKS MOSQUE- Faridpur Mosque -3D Faridpur Mosque Faridpur Mosque hrs] Faridpur Mosque [Done Madaripur & MES IB Mirpur DOHS Staff Dormitory- MES IB Interior Faridpur Boys Hostel DWKS MOSQUE Jamalpur Mosque Jamalpur Mosque Jamalpur Mosque SYLHET TEXTILE HRS] INSTITUTE BOYS Sylhet Textile Institute Sylhet Textile Institute Minar , Jamalpur & Architecture
ARCHITECTURE SO-II ARCHITECTURE SO-II (A) ARCHITECTURE SO-II Modelling Pending ARCHITECTURE SO-II [A] 1130 hrs] Interior Booklet Prin t , Faridpur Master Jamalpur Mosque Boys Hostel Faridpur Jamalpur Mosque Architecture Plan, Section Architecture Architecture HOSTEL PRINT HOSTEL PRINT Sheikh Rasel Textile
8 D/MAN-CLASS-C 8801960947753 Dormitory-3D (A) -URGENT. -URGENT. (A) -URGENT. 20180920 1230 hrs 3D Modelling Modelling Modelling Modelling Modelling - Modelling Pending SO-III (Arch) Sylhet -URGENT. Modelling - 3D Modelling 3D Modelling Boys Hostel Madaripur & [Done 1000 hrs] Restaurant 3D 3D Modelling Booklet & Dinning Plan Submitted to Plan Print , Textile List Architecture SO Architecture Architecture SO AA [preparing final [preparin g final draft MASTERCOPY 1220 hrs INSTITUTE BOYS Jamalpur SO III [D] Female Hostel Female Hostel Pirganj; College Female Hostel (working); PMB
MD YASIR ARAFAT MES IB Dinning -3D [Sheikh Rasel] 3D Modelling Faridpur Boys Hostel SO II [A] HOST EL Mosque SO III [D] SO III [A] SO III [A] Sylhet Textile Institute SO III Jamalpur Mosque plinth area
SO-II (Arch) SO-III (Arch) SO-III (Arch) SO-III (Arch) Modelling SO-III (Arch) SO-III (Arch) SO-III (Arch) SO-III (Arch) SO-III (Arch) Sylhet test test pile drg SO III [D] SO-III [A] SO III [A] SO III [A] Modelling Laalmonirhat Booklet MES IB Dinning Plan SO III [A] SO-III (Arch) SO III [A] 1330 hrs Check SO III [A] SO III [A] III [A] draft 25/10/18] 25/10/18] SO SO III [D] Architecture Mosque Architecture Sylhet Textile Institute Female Hostel [A] Calculation SO III
pile drg SO II [D] Female Hostel Faridpur SO III [A] SO III [A] III [A] SO III [A] III [A] SO III [A] CLARIFICATION Female Hostel
Print CLARIFICATION SO III [A] SO III [A] [A]
SO-III (Arch)" SO III [A] SO III [A] SO III [A]
SO III [A]
08-11-18 09-11-18 10-11-18 11-11-18

THURSDAY FRIDAY SATURDAY SUNDAY


Ser CA No & Name of Works

1 CA No. EINC/ 174 of 2017-2018


Construction of 1 x 50,000 gallon Semi Over ground water reservoir
including external service for EinC’s Complex at Dhaka Cantt.

2 CA No. EINC/ 331 of 2017-2018


Construction of 1st & 2nd Floor to over existing of 1 x 20 Men SM BK
(1 storey with 5 storied foundation) including internal/external services
for MES Staff at Ramu Cantt

3 CA No. EINC/ 334 of 2017-2018


Construction of 1st & 2nd Floor to over under Construction of 1 x 20
Men SM BK for MES Staff including internal/external Services (1
storey with 5 storied foundation) for 17 Infantry Division at Sylhet
Cantt.
Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total
M/S. Nazmul Alam (Hatem)

Prop: Md. Nazmul Alam (Hatem)

Index No. DD-427 (Army) Tk. 62,89,562.40 Wks Dte 1

Frontage Ltd

Managing Director: Maj Md.


Morshedur Rahman Chowdhury
(Retd) Tk. 1,38,22,079.89 Wks Dte 1

Index No. C-877 (Army)

M/S. Rafique & Brothers

Prop: Rafiqul Islam

Index No. C-804 (Army) Tk. 1,42,55,213.73 Wks Dte 1

Total for Wks Dte= 3


Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total Completed

1 0 E6 Wks Dte 1 1

E6
1 0 Wks Dte 1 1
18-09-18

E6
1 0 Wks Dte 1 1
16-09-18

3 0 3 3
ural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed Remaining

0 E6 Wks Dte 1 1 0

E6
0 Wks Dte 1 1 0
18-09-18

E6
0 Wks Dte 1 1 0
16-09-18

0 3 3 0
Remarks
Remarks

E6

E6
18-09-18

E6
16-09-18
Ser CA No & Name of Works

1 CA No. EINC/ 97 of 2017-2018


Remaining work for Construction of 1 x Complete Bungalow (2
storey with 2 storied foundation) including ancillary works,
Furniture & Other’s Facilities for PSO, AFD at Shaheed Belayet
Road area, Dhaka Cantt (3rd Phase).

2 CA No. EINC/ 203 of 2017-2018


Construction of 1 x Complete Bungalow (2 storey with 2 storied
foundation) including ancillary works and Other’s facilities for
PSO, AFD at Shaheed Belayet Road area, Dhaka Cantt (4th
Phase).

3 CA No. EINC/ 344 of 2017-2018


Construction of 1 x Complete Bungalow (2 storey with 2 storied
foundation) including ancillary works for PSO, AFD at Shaheed
Belayet Road area, Dhaka Cantt (Last Phase).

S
4 CA No. EINC/ 379 of 2017-2018
Construction of 1 x Garbage point including ancillary works for
Armed Forces Division (AFD) at Dhaka Cantt.
5 CA No. EINC/ 380 of 2017-2018
Extension of MT Garage including ancillary works for Armed
Forces Division (AFD) at Dhaka Cantt.
Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total
M/S. National Engineering &
Aluminium Fabrication

Proprietor: A.B.M. Abdur Rahim


Basa-Bari
Index No. C-800 (Army) Tk. 1,73,47,679.90 1
Dr. Nizam

M/S. MAN Enterprise

Managing Partner & CEO : Brig


Gen A K M Mahfuzul Haque
(Retd) Basa-Bari
Tk. 3,57,25,000.00 1
Dr. Nizam
Index No. EinC/B-149 (Army)

M/S. National Engineering &


Aluminium Fabrication

Proprietor: A.B.M. Abdur Rahim


Basa-Bari
Index No. C-800 (Army) Tk. 32,91,357.71 1
Dr. Nizam

Sub Total for Consultant= 3


N4 Construction

Prop: Major Noung Chow Mong


(Retd)

Index No.Ga-599 (Navy) Tk. 6,52,234.56 Wks Dte 1


M/S. Momen Traders

Prop: Md. Abdul Momen

Index No. C-535 (Navy)


Tk. 15,83,334.00 Wks Dte 1

Total for Wks Dte= 2


Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total Completed

0 1 As Built Wks Dte 1 1

0 1 As Built Wks Dte 1 1

0 1 As Built Wks Dte 1 1

0 3

E6
1 0 Wks Dte 1 1
23-10-18
E6
1 0 Wks Dte 1 1
23-10-18

2 0 5 5
ural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed Remaining

0 E6 Wks Dte 1 1 0

0 E6 Wks Dte 1 1 0

0 E6 Wks Dte 1 1 0

E6
0 Wks Dte 1 1 0
23-10-18
E6
0 Wks Dte 1 1 0
23-10-18

0 5 5 0
Remarks
Remarks

E6

E6

E6

E6
23-10-18
E6
23-10-18
Ser CA No & Name of Works Name of Contractor’s Firm

MSCL-SCML JV
(Mazid Sons Construction Ltd &
CA No. EINC/ 08 of 2017-2018
Shepherd Consultant and
Construction of 1 x 20 `C’/`D’/`E’ Type Officers’ quarters (6 storey with
Management Ltd JV)
1 14 storied foundation) incl ancillary works for Establishment of 99
Authorized Signatory: Mafiz
Composite Brigade for safety and security of Padma Multipurpose
Ahmed Bhuiyan
Bridge Project at Janzira, Shariatpur
Index No. EinC/A-46 (Army) & C-
895 (Army)

MSCL-SCML JV
(Mazid Sons Construction Ltd &
CA No. EINC/ 13 of 2017-2018 Shepherd Consultant and
Construction of 1 x 100 Metre Firing Range incl ancillary works for Management Ltd JV)
2
Establishment of 99 Composite Brigade for safety and security of Authorized Signatory: Mafiz
Padma Multipurpose Bridge Project at Janzira, Shariatpur Ahmed Bhuiyan
Index No. EinC/A-46 (Army) & C-
895 (Army)

Sub Total for consultant=

CA No. EINC/ 09 of 2017-2018 M/S Purbachal Holdings


Construction of Surface Drain incl ancillary works for Establishment of Ltd
3
99 Composite Brigade for safety and security of Padma Multipurpose Chairman: Abdul Hannan (Kakon)
Bridge Project at Srinagar, Munshiganj & Janzira, Shariatpur Index No. C-601 (Air)
MSCL-SCML JV
(Mazid Sons Construction Ltd &
CA No. EINC/ 10 of 2017-2018 Shepherd Consultant and
Construction of Boundary / Retaining Wall incl ancillary works for Management Ltd JV)
4
Establishment of 99 Composite Brigade for safety and security of Authorized Signatory: Mafiz
Padma Multipurpose Bridge Project at Janzira, Shariatpur Ahmed Bhuiyan
Index No. EinC/A-46 (Army) & C-
895 (Army)

CA No. EINC/ 11 of 2017-2018 MARCS Architect &


Construction of 1 x SM BK for Brigade Headquarter (4 storey with 5 Engineer Ltd
5 storied foundation) incl ancillary works for Establishment of 99 Managing Director: Engr. Abdullah
Composite Brigade for safety and security of Padma Multipurpose Al Mamun, Peng
Bridge Project at Srinagar, Munshiganj Index No. C-862 (Army)

CA No. EINC/ 12 of 2017-2018 M/S Purbachal Holdings


6 Construction of Boundary / Retaining Wall incl ancillary works for Ltd
Establishment of 99 Composite Brigade for safety and security of Chairman: Abdul Hannan (Kakon)
Padma Multipurpose Bridge Project at Srinagar, Munshiganj Index No. C-601 (Air)

CA No. EINC/ 49 of 2017-2018 M/S Purbachal Holdings


Construction of 1 x Sub Division Office cum Store for MES (Single
7 storey) for Establishment of 99 Composite Brigade for safety and
Ltd
security of Padma Multipurpose Bridge Project at Srinagar (Mawa Chairman: Abdul Hannan (Kakon)
side), Munshiganj. Index No. C-601 (Air)
CA No. EINC/ 92 of 2017-2018 M/S. Mitali Prokoushali
Construction of Guide wall for protection of site development works for
8 Prop: Md. Akram Hossain
Establishment of 99 Composite Brigade for safety and security of
Index No. SD-63 (Army)
Padma Multipurpose Bridge Project at Janzira, Shariatpur.

CA No. EINC/ 93 of 2017-2018


Construction of RCC box culvert for drainage system of site M/S. Faruk Enterprise
9 development works for Establishment of 99 Composite Brigade for Prop: Abu Nasir Omar Faruk
safety and security of Padma Multipurpose Bridge Project at Janzira, Index No. DD-285 (Army)
Shariatpur.

AHKS Construction Firm


CA No. EINC/ 95 of 2017-2018 Ltd
10 Arboriculture / Tree plantation for Establishment of 99 Composite Managing Director: Abdul Hannan
Brigade for safety and security of Padma Multipurpose Bridge Project. Kakon
Index No. D-440 (Air)

CA No. EINC/ 96 of 2017-2018


Construction of Protection Embankment along the Perimeter of Sand M/S. Ratan Enterprise
11 filled area for site development at SA-2 for Establishment of 99 Prop: Sheikh Nasir Uddin
Composite Brigade for safety and security of Padma Multipurpose Index No. DD-163 (Army)
Bridge Project at Janzira, Shariatpur.

AHKS Construction Firm


CA No. EINC/ 112 of 2017-2018
Construction of brick bottoming Road for Establishment of 99 Ltd
12 Managing Director: Abdul Hannan
Composite Brigade for safety and security of Padma Multipurpose
Bridge Project at Janzira, Shariatpur (Group-V). Kakon
Index No. D-440 (Air)
AHKS Construction Firm
CA No. EINC/ 212 of 2017-2018
Ltd
Filling of existing Pond including ancillary works for Establishment of
13
99 Composite Brigade for safety and security of Padma Multipurpose Managing Director: Abdul Hannan
Bridge Project at SA-2, Janzira, Shariatpur (Group-II). Kakon
Index No. D-440 (Air)

CA No. EINC/ 214 of 2017-2018 M/S Purbachal Holdings


14 Digging of Pond including ancillary works for Establishment of 99 Ltd
Composite Brigade for safety and security of Padma Multipurpose Chairman: Abdul Hannan (Kakon)
Bridge Project at SA-2, Janzira, Shariatpur (Group-I). Index No. C-601 (Air)
Architectural Drawing Structura
CA Amount
Consultants Total Completed Remaining Remarks Consultants

E6 Advance
Drishik Revised Engineering
Tk. 21,01,44,515.95 Consultants 1 1 0 Drawings (Engr.
(Arch Shihir) SO III
[A]
Monaim)

Advance
Drishik
Engineering
Tk. 10,02,32,019.65 Consultants 1 1 0 E6
(Engr.
(Arch Shihir)
Monaim)

Sub Total for consultant= 2 2 0 0

Advance
Engineering
Tk. 2,99,36,371.80 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 6,65,25,258.00 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 5,23,16,127.50 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 3,10,00,489.80 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 1,49,96,441.13 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 36,89,791.44 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 65,75,347.30 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 24,91,500.00 Wks Dte 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
Tk. 1,26,66,972.00 Wks Dte 0 0 0 As Built
(Engr.
Monaim)

Advance
Engineering
Tk. 67,73,917.63 Wks Dte 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
Tk. 86,46,180.00 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
Tk. 1,43,66,189.87 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Total= 10 10 0
Structural Drawing MEP Drawing

Total Completed Remaining Remarks Consultants Total Completed Remaining Remarks

Drishik
1 1 0 E6 Consultants 1 0 1
(Arch Shihir)

Drishik
1 1 0 E6 Consultants 1 0 1
(Arch Shihir)

2 0 2

1 1 0 E6 1 1 0 E6
1 1 0 E6 0 0 0 N/A

1 1 0 E6 1 1 0 E6

1 1 0 E6 0 0 0 N/A

1 1 0 E6 1 1 0 E6
1 1 0 E6 0 0 0 N/A

1 1 0 E6 0 0 0 N/A

0 0 0 N/A 0 0 0 N/A

0 0 0 As Built 0 0 0 As Built

1 1 0 E6 0 0 0 N/A
1 1 0 E6 0 0 0 N/A

1 1 0 E6 0 0 0 N/A

12 12 0 3 3 0
Remarks
Architectural Drawing
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount
Consultants Total Completed Remaining
CA No. EINC/ 64 of 2017-2018 SB Builders & Properties Ltd
Construction of 1 x Singlemen Barrack Complex (5 Storey with 5
storied foundation) with garage & Driver’s accn (2 Storey with 2 Managing Director: Md. Shahjahan
storied foundation) including ancillary works at Inf Bn for Bablu
1 Establishment of Sheikh Hasina Cantonment, Barisal (Barrack-2). Tk. 42,76,37,309.60 Wks Dte 1 1 0
Index No. C-989 (Army)

CA No. EINC/ 65 of 2017-2018 Multi Trade Enterprise Ltd


Construction of 1 x GOC’s Office with Link corridor (Single storey)
including ancillary works for Establishment of Sheikh Hasina Managing Director: Ehsan Ali
2
Cantonment, Barisal.
Tk. 3,20,00,064.37 Wks Dte 1 0 1
Index No. C-565 (Navy)

CA No. EINC/ 66 of 2017-2018 AWR Developments (BD) Ltd


Construction of 1 x Div HQ (4 storey with 4 storied foundation)
3 including ancillary works for Establishment of Sheikh Hasina Chairman: Chowdhury Fazle Tk. 40,07,85,897.14 Wks Dte 1 0 1
Cantonment, Barisal. Imam

CA No. EINC/ 67 of 2017-2018 M/S. Home Street Builders


Construction of 1 x Singlemen Barrack Complex (5 Storey with 5
storied foundation) with garage & Driver’s accn (2 Storey with 2 Prop: Md. Monjur Elahi Rana
4 storied foundation) including ancillary works at Div Support Bn for Tk. 42,76,37,309.60 Wks Dte 1 1 0
Establishment of Sheikh Hasina Cantonment, Barisal. Index No. C-915 (Army)

CA No. EINC/ 68 of 2017-2018 M/S. Dipu Enterprise


Construction of 1 x Singlemen Barrack Complex (5 Storey with 5 Prop. Shaikh Asgar Hossain (Dipu)
storied foundation) with garage & drivers accn (2 Storey with 2 storied
5 foundation) including ancillary works at Inf Bn for Establishment of Index No. EinC/A-54 (Navy) Tk. 42,76,37,309.60 Wks Dte 1 1 0
Sheikh Hasina Cantonment, Barisal (Barrack-1).

CA No. EINC/ 69 of 2017-2018 Star Trading Corporation


Construction of 1 x Singlemen Barrack Complex (5 Storey with 5
storied foundation) with garage & Drivers accn (2 Storey with 2 storied Prop: Alhaj Nur Mohammed
6 foundation) including ancillary works at Div Engr Bn for Establishment Tk. 42,76,37,309.60 Wks Dte 1 1 0
of Sheikh Hasina Cantonment, Barisal.

CA No. EINC/ 70 of 2017-2018 M/S. MAN Enterprise


Construction of 1 x Singlemen Barrack (6 Storey with 6 storied Managing Partner & CEO : Brig
foundation) with CH/DH & Link corridor (2 Storey with 2 storied Gen A K M Mahfuzul Haque (Retd)
7 foundation) including ancillary works at Div HQ for Establishment of Index No. EinC/B-149 (Army) Tk. 8,79,65,300.00 Wks Dte 1 1 0
Sheikh Hasina Cantonment, Barisal.

CA No. EINC/ 79 of 2017-2018 Hossain Construction (Pvt.) Ltd


Site development/Earth filling for Establishment of Sheikh Hasina Managing Director: Md. Anwar
8 Cantonment, Barisal (Island No. 03). Hossain Tk. 50,00,00,020.75 Wks Dte 1 1 0
Index No. EinC/A-56 (Air)
CA No. EINC/ 80 of 2017-2018 Kabico Limited
Construction of 1 x Singlemen Barrack (6 Storey with 6 storied Managing Director: Sheikh Kabir
foundation) with CH/DH & Link corridor (2 Storey with 2 storied Hossain
9 foundation) for Lady Sainik including ancillary works; Establishment Index No. EinC/A-47 (Navy) Tk. 8,79,64,838.00 Wks Dte 1 1 0
of Sheikh Hasina Cantonment, Barisal.

CA No. EINC/ 83 of 2017-2018 Logistic Export Import &


Construction of 1 x Brigade HQ/Equivalent ( 3 storey with 3 storied Distribution
foundation) and 1 x Brigade Commander Office with Link Corridor Proprietor: Mohammed Rajib
10 (Single storey) including ancillary works for Establishment of Sheikh Hasan Tk. 7,56,34,245.13 Wks Dte 1 0 1
Hasina Cantonment, Barisal (Island-01). Index No.C-1011 (Army)

CA No. EINC/ 84 of 2017-2018 M/S. Nuruzzaman Khan


Site development/Earth filling for Establishment of Sheikh Hasina Prop: Md Nuruzzaman Khan
Cantonment, Barisal (Island No. 01 & 02).
11 Tk. 49,99,99,955.10 Wks Dte 0 0 0

CA No. EINC/ 85 of 2017-2018 Spectra Engineers Limited


Construction of 1 x CMH (6 storey with 8 storied foundation) including Managing Director: Khan Md.
ancillary works for Establishment of Sheikh Hasina Cantonment, Aftabuddin
12 Barisal. Index No. EinC/A-28 (Army) Tk. 99,73,74,405.51 Wks Dte 1 0 1

CA No. EINC/ 94 of 2017-2018 SM Rafiuddin Ahmed


Construction of 1 x 500 M.Ton Godown (Single Storey) for MES including Proprietor: SM Rafiuddin Ahmed
ancillary works for Establishment of Sheikh Hasina Cantonment, Barisal. Index No. C-993 (Army)
13 Tk. 1,08,05,658.72 Wks Dte 1 1 0

CA No. EINC/ 104 of 2017-2018 Nuruzzaman Khan


Construction of 1 x Main Gate with Guard Room including ancillary
works for Establishment of Sheikh Hasina Cantonment, Barisal.
14 Tk. 61,16,827.97 Wks Dte 0 0 0

CA No. EINC/ 167 of 2017-2018 M/S. Abdus Salam


Construction of 1 x Mosque (for 2000 Musulli) (2 storey with 2 storied Prop: Md. Abdus SalamIndex No.
foundation) including ancillary works for Establishment of Sheikh C-998 (Army)
15 Hasina Cantonment, Barisal (Mosque-01). Tk. 5,42,85,924.99 Wks Dte 1 1 0

CA No. EINC/ 201 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of RCC drain for Inf Bn, back side of Flag Staff House, Prop: Sheikh Nazrul Islam
BOQ and Div HQ area for Establishment of Sheikh Hasina Index No. EinC/B-99 (Army)
16 Cantonment, Barisal (Group-I). Tk. 1,64,68,816.40 Wks Dte 0 0 0

CA No. EINC/ 202 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of disposal/out let drain in various unit and Prop: Sheikh Nazrul Islam
Accommodation area (Inf Bn, Div Engr Bn, Div Support Bn, Fd Regt Index No. EinC/B-99 (Army)
17 Arty) of Island-01 for Establishment of Sheikh Hasina Cantonment, Tk. 1,59,15,836.66 Wks Dte 0 0 0
Barisal (Group-IV).
CA No. EINC/ 210 of 2017-2018 M/S. Fareast Engineers
Construction of HBB Road from Container shed towards West side for Prop: Md. Nuruzzaman Hassan
Establishment of Sheikh Hasina Cantonment, Barisal (Group-V). Index No. C-219 (Air)
18 Tk. 38,95,782.82 Wks Dte 1 1 0

CA No. EINC/ 211 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of Canal, kacha drain with Masonary wall in Island-01 for Prop: Sheikh Nazrul Islam
Establishment of Sheikh Hasina Cantonment, Barisal (Group-III). Index No. EinC/B-99 (Army)
19 Tk. 1,78,37,321.57 Wks Dte 0 0 0

CA No. EINC/ 213 of 2017-2018 M/S. R. M. Construction


Construction of HBB Road from Main Road towards CMH and Guide Prop: Golam Monsef
wall for Round About of Main road for Establishment of Sheikh Index No. C-289 (Air)
20 Hasina Cantonment, Barisal (Group-IV). Tk. 35,39,297.90 Wks Dte 1 1 0

CA No. EINC/ 216 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of RCC/Masonary drain for Officers Accommodation, Prop: Sheikh Nazrul Islam
MES Complex, JCO’s Qtr and beside Main Gate area for Index No. EinC/B-99 (Army)
21 Establishment of Sheikh Hasina Cantonment, Barisal (Group-II). Tk. 1,38,95,056.25 Wks Dte 0 0 0

CA No. EINC/ 219 of 2017-2018 M/S. M. H Enterprise


Construction of Main Road (HBB Road) in Island-03 for Prop: Md. Mosharraf Hossain
Establishment of Sheikh Hasina Cantonment, Barisal (Group-V). Index No. C-852 (Army)
22 Tk. 1,28,80,556.00 Wks Dte 1 1 0

CA No. EINC/ 220 of 2017-2018 MHR Enterprise


Construction of HBB Road for ‘C’/`D’ Type Qtr, ‘B’ Type Qtr & Officers Prop: Brig Gen Md. Habibur
Mess (Island-03) for Establishment of Sheikh Hasina Cantonment, Rahman, afwc, psc (Retd)
23 Barisal (Group-II). Index No. C-1021 (Army) Tk. 1,65,81,340.10 Wks Dte 1 1 0

CA No. EINC/ 221 of 2017-2018 Saj Enterprise


Construction of HBB Road for Inf Bde HQ, JCOs’ Mess and Inf Bn Prop: Roushon Ara Lima
Barrack Complex (Island-02) for Establishment of Sheikh Hasina Index No. C-571 (Navy)
24 Cantonment, Barisal (Group-III). Tk. 1,96,75,408.00 Wks Dte 1 1 0

CA No. EINC/ 222 of 2017-2018 Zaman Enterprise (Pvt) Ltd


Construction of HBB Road for JCOs’ Qtr, ORs’ Qtr & Followers’ Qtr Managing Director: Maj M.
(Island-03) for Establishment of Sheikh Hasina Cantonment, Barisal Asaduzzaman (Retd)
25 (Group-I). Index No. C-949 (Army) Tk. 1,23,80,032.00 Wks Dte 1 1 0

CA No. EINC/ 223 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of HBB Road in front of Main Gate and Hardstanding Prop: Sheikh Nazrul Islam
towards East side of GOC’s Office for Establishment of Sheikh Hasina Index No. EinC/B-99 (Army)
26 Cantonment, Barisal (Group-I). Tk. 60,19,540.47 Wks Dte 0 0 0
CA No. EINC/ 224 of 2017-2018 M/S. Faruk Enterprise
Construction of HBB Road & Hardstanding with Saluting Dias, Flag Prop: Md. Faruk Hossain
Stand for Parade ground and HBB Road from Bungalow area towards Index No. D-362 (Air)
27 Engineers Container for Establishment of Sheikh Hasina Tk. 1,18,59,640.40 Wks Dte 1 1 0
Cantonment, Barisal (Group-II).

CA No. EINC/ 226 of 2017-2018 M/S. Md. Nizam Uddin


Construction of Hardstanding with Pavement tiles in front of Flag Staff Prop: Md. Nizam Uddin
House & VVIP Rest House and HBB Road from Flag Staff House Index No. C-952 (Army)
28 towards East side upto BOQ for Establishment of Sheikh Hasina Tk. 79,57,039.34 Wks Dte 1 1 0
Cantonment, Barisal (Group-III).

CA No. EINC/ 227 of 2017-2018 Dhaka Construction Company


Construction of Main Road (HBB Road) in Island-02 for Prop: Md. Jahidul Islam
Establishment of Sheikh Hasina Cantonment, Barisal (Group-IV).
29 Tk. 1,28,75,796.00 Wks Dte 1 1 0

CA No. EINC/ 229 of 2017-2018 M/S. Advanced Development


Construction of HBB Road in front of ADB Proposed Construction site Engineering & Construction
for Establishment of Sheikh Hasina Cantonment, Barisal (Group-VI). Prop: Md. Akhtaruzzaman
30 Index No. C-362 (Navy) Tk. 1,16,13,875.80 Wks Dte 1 1 0

CA No. EINC/ 247 of 2017-2018 M/S. Home Street Builders


Construction of 1 x 104 Other Ranks Quarter (14 storey with 14 storied Prop: Md. Monjur Elahi Rana
foundation) including ancillary works for Establishment of Sheikh Hasina Index No. C-915 (Army)
Cantonment, Barisal (Other Ranks Quarter No.03). Tk. 36,57,45,384.36 Wks Dte 1 1 0

CA No. EINC/ 248 of 2017-2018 M/S. Home Street Builders


Construction of 1 x 104 JCOs’ Quarter (14 storey with 14 storied Prop: Md. Monjur Elahi Rana
foundation) including ancillary works for Establishment of Sheikh Index No. C-915 (Army)
32 Hasina Cantonment, Barisal. Tk. 39,30,78,796.41 Wks Dte 1 0 1

CA No. EINC/ 249 of 2017-2018 M/S. Home Street Builders


Construction of 1 x Cantonment Public School & College (4 storey with 5 Prop: Md. Monjur Elahi Rana
storied foundation) (Bangla Medium) including ancillary works for Index No. C-915 (Army)
33 Establishment of Sheikh Hasina Cantonment, Barisal. Tk. 22,77,98,618.24 Wks Dte 1 1 0

CA No. EINC/ 251 of 2017-2018 M/S. S. M Construction


Construction of 1 x 100 Officers’ Mess Complex and BOQ (6 storey with Prop: Md.Hasibur Rahman
6 storied foundation) including ancillary works for Establishment of Index No. C-909 (Army)
34 Sheikh Hasina Cantonment, Barisal. Tk. 26,59,09,189.68 Wks Dte 1 0 1

CA No. EINC/ 252 of 2017-2018 AWR Developments (BD) Ltd


Construction of 1 x 40 JCOs’ and ORs’ Quarter (6 storey with 14 storied Chief Executive Officer: Md.
foundation) including ancillary works for Establishment of Sheikh Hasina Zohurul Islam
35 Cantonment, Barisal. Tk. 18,11,79,231.87 Wks Dte 1 0 1
CA No. EINC/ 254 of 2017-2018 M/S. Zaman Enterprise
Construction of 1 x Singlemen Barrack (4 Storey with 4 storied Prop: Kazi Kamruzzaman
foundation) including ancillary works for MES; Establishment of Sheikh Index No. C-534 (Air)
36 Hasina Cantonment, Barisal. Tk. 3,45,63,508.65 Wks Dte 1 1 0

CA No. EINC/ 255 of 2017-2018 M/S. Rahman Brothers


Construction of 1 x 104 Followers’ Quarter (14 storey with 14 storied Prop: Mohidur Rahman Hira
foundation) including ancillary works for Establishment of Sheikh Hasina Index No. C-932 (Army)
37 Cantonment, Barisal. Tk. 19,90,37,356.60 Wks Dte 1 0 1

CA No. EINC/ 257 of 2017-2018 Polestar Construction & Supply


Construction of 1 x Singlemen Barrack (6 Storey with 6 storied Prop: Mohammad Ashiq Khan
foundation) with CH/DH & Link corridor (2 Storey with 2 storied Index No. C-591 (Navy)
38 foundation) including ancillary works for Inf Bde HQ; Establishment of Tk. 8,93,90,966.16 Wks Dte 1 1 0
Sheikh Hasina Cantonment, Barisal.

CA No. EINC/ 262 of 2017-2018 M/S. S. M Construction


Construction of 1 x Flag Staff House (2 storey with 2 storied foundation) Prop: Md.Hasibur Rahman
including ancillary works for Establishment of Sheikh Hasina Index No. C-909 (Army)
39 Cantonment, Barisal. Tk. 2,23,75,313.20 Wks Dte 1 0 1

CA No. EINC/ 263 of 2017-2018 MSCL-SCML JV,


Construction of 1 x Singlemen Barrack Complex (5 Storey with 5 storied (Mazid Sons Construction Ltd &
foundation) with garage & drivers accommodation (2 Storey with 2 Shepherd Consultant and
storied foundation) including ancillary works at Riverine Engineers for Management Ltd JV)
Establishment of Sheikh Hasina Cantonment, Barisal. Authorized Signatory: Mafiz
40 Tk. 42,82,38,720.91 Wks Dte 1 1 0
Ahmed Bhuiyan
Index No. EinC/A-46 (Army) & C-
895 (Army)

CA No. EINC/ 265 of 2017-2018 Hossain Construction (Pvt.) Ltd


Construction of 1 x 18 `B’ Type Officers’ Quarter (10 storey with 10 Managing Director: Md. Anwar
storied foundation, 02 Unit in each floor) including ancillary works for Hossain
41 Establishment of Sheikh Hasina Cantonment, Barisal. Index No. EinC/A-56 (Air) Tk. 18,72,68,840.08 Wks Dte 1 0 1

CA No. EINC/ 266 of 2017-2018 Hossain Construction (Pvt.) Ltd


Construction of 1 x 52 `C’/`D’ Type Officers’ Quarter (14 storey with 14 Managing Director: Md. Anwar
storied foundation) including ancillary works for Establishment of Hossain
42 Sheikh Hasina Cantonment, Barisal (Officers’ Quarter No. 01). Index No. EinC/A-56 (Air) Tk. 38,37,56,171.00 Wks Dte 1 0 1

CA No. EINC/ 267 of 2017-2018 M/S. Confidence Trade


Construction of 1 x 52 `C’/`D’ Type Officers’ Quarter (14 storey with 14 International
storied foundation) including ancillary works for Establishment of Prop: Md. Saleh Ahammed
43 Sheikh Hasina Cantonment, Barisal (Officers’ Quarter No. 02). Index No. EinC/B-117 (Army) Tk. 38,37,76,848.31 Wks Dte 1 0 1
CA No. EINC/ 270 of 2017-2018 Ikhtear Uddin Khan Limited
Construction of 1 x 104 Other Ranks Quarter (14 storey with 14 storied Managing Director : Ikhtear Uddin
foundation) including ancillary works for Establishment of Sheikh Hasina Khan
44 Cantonment, Barisal (Other Ranks Quarter No.01). Index No. EinC/A-33 (Navy) Tk. 36,62,34,847.00 Wks Dte 1 1 0

CA No. EINC/ 271 of 2017-2018 Ikhtear Uddin Khan Limited


Construction of 1 x 104 Other Ranks Quarter (14 storey with 14 storied Managing Director : Ikhtear Uddin
foundation) including ancillary works for Establishment of Sheikh Hasina Khan
45 Cantonment, Barisal (Other Ranks Quarter No.02). Index No. EinC/A-33 (Navy) Tk. 36,62,34,847.00 Wks Dte 1 1 0

CA No. EINC/ 272 of 2017-2018 Nest Properties


Construction of 1 x Singlemen Barrack Complex (5 Storey with 5 storied Prop: Shaila Sharmin
foundation) with garage & drivers accommodation (2 Storey with 2
46 storied foundation) including ancillary works at Army Regt for Tk. 42,82,39,690.91 Wks Dte 1 1 0
Establishment of Sheikh Hasina Cantonment, Barisal.

CA No. EINC/ 273 of 2017-2018 Greenland Builders Ltd


Construction of 1 x Singlemen Barrack (6 Storey with 6 storied Managing Director: Abdullah Al-
foundation) with CH/DH & Link corridor (2 Storey with 2 storied Mamun
47 foundation) including ancillary works for Sta HQ; Establishment of Tk. 8,93,90,966.15 Wks Dte 1 1 0
Sheikh Hasina Cantonment, Barisal

CA No. EINC/ 274 of 2017-2018 M/S. Cadmus Limited


Construction of 1 x Brigade HQ/Equivalent (3 storey with 3 storied Managing Director: Md. Tazidul
foundation) and 1 x Brigade Commander Office with Link Corridor Islam
48 (Single storey) including ancillary works for Establishment of Sheikh Index No. C-591 (Air) Tk. 3,20,65,888.56 Wks Dte 1 0 1
Hasina Cantonment, Barisal (Island-02).

CA No. EINC/ 283 of 2017-2018 M/S. Razzaque Construction &


Construction of 1 x Garrison Engineer Office (2 storey with 2 storied Co
foundation) including ancillary works for Establishment of Sheikh Hasina Prop: Md. Anwar
49 Cantonment, Barisal. Index No. EinC/B-131 (Navy) Tk. 2,62,30,520.74 Wks Dte 1 1 0

CA No. EINC/ 284 of 2017-2018 Amin Design & Consultancy


Soil Test for Proposed buildings for Establishment of Sheikh Hasina Prop: Md. Moinul Islam Majumder
Cantonment at Barisal (Island-01).
50 Tk. 19,24,000.00 Wks Dte 0 0 0

CA No. EINC/ 285 of 2017-2018 M/S. Sheikh Nazrul Islam & Co


Construction of 1 x Sta HQ (Brigade HQ/Equivalent) (3 storey with 3 Prop: Sheikh Nazrul Islam
storied foundation) and 1 x Station Commander Office (1 x Brigade Index No. EinC/B-99 (Army)
51 Commander Office) with Link Corridor (Single storey) including Tk. 3,17,07,079.84 Wks Dte 1 0 1
ancillary works for Establishment of Sheikh Hasina Cantonment, Barisal
(Island-01).

CA No. EINC/ 336 of 2017-2018 M/S. Tuzaeda


Construction of 1 x Sub-Division Office with Store (Single storey with 3 Prop : Md. Mahfuzur Rahman
storied foundation) including ancillary works for MES at Sheikh Hasina Index No. EinC/B-80 (Navy)
52 Cantonment, Barisal. Tk. 1,71,87,051.42 Wks Dte 1 1 0
CA No. EINC/ 339 of 2017-2018 M/S. Suad Construction
Construction of 1 x 500 M.Ton Godown for SSD of Establishment of Prop: Md. Abu Tayob
Sheikh Hasina Cantonment, Barisal (SSD Godown No. 02). Index No. EinC/B-95 (Air)
53 Tk. 1,05,12,466.75 Wks Dte 1 1 0

CA No. EINC/ 361 of 2017-2018 Dominage Developments &


Filled up Area protection works at North-East (from Mosque road to Holdings Ltd
Patuakhali Highway) including ancillary works for Establishment of Director: Maj Abu Arif Md.
54 Sheikh Hasina Cantonment, Barishal (Group-V) Monowarul Huq (Retd) Tk. 1,72,52,985.60 Wks Dte 0 0 0
Index No. C-825 (Army)

CA No. EINC/ 362 of 2017-2018 Dominage Developments &


Filled up Area protection works at North-West (from Mosque Road to Holdings Ltd
West side) including ancillary works for Establishment of Sheikh Director: Maj Abu Arif Md.
55 Hasina Cantonment, Barishal (Group-IV) Monowarul Huq (Retd) Tk. 1,34,60,772.10 Wks Dte 0 0 0
Index No. C-825 (Army)

CA No. EINC/ 363 of 2017-2018 Dominage Developments &


Filled up Area protection works at South-West (from OBM Approach Holdings Ltd
Road to West Canal) including ancillary works for Establishment of Director: Maj Abu Arif Md.
56 Sheikh Hasina Cantonment, Barishal (Group-I). Monowarul Huq (Retd) Tk. 1,66,20,273.70 Wks Dte 0 0 0
Index No. C-825 (Army)

CA No. EINC/ 364 of 2017-2018 Dominage Developments &


Filled up Area protection works at East side (from Ferry Ghat to Holdings Ltd
Cantonment Main Gate) including ancillary works for Establishment of Director: Maj Abu Arif Md.
57 Sheikh Hasina Cantonment, Barishal (Group-III) Monowarul Huq (Retd) Tk. 1,00,22,198.70 Wks Dte 0 0 0
Index No. C-825 (Army)

CA No. EINC/ 365 of 2017-2018 Dominage Developments &


Filled up area protection works at East side (from OBM Ghat to East Holdings Ltd
side with Approach Road) including ancillary works for Establishment Director: Maj Abu Arif Md.
58 of Sheikh Hasina Cantonment, Barishal (Group-II) Monowarul Huq (Retd) Tk. 1,26,55,071.60 Wks Dte 0 0 0
Index No. C-825 (Army)

CA No. EINC/ 366 of 2017-2018 M/S. Suad ConstructionProp:


Construction of 1 x 500 M.Ton Godown for SSD of Establishment of Md. Abu TayobIndex No. EinC/B-
Sheikh Hasina Cantonment, Barisal (SSD Godown No. 01). 95 (Air)
59 Tk. 1,05,12,466.75 Wks Dte 1 1 0

CA No. EINC/ 410 of 2017-2018 MAQ Engineering LtdManaging


Construction of 1 x Mosque (for 2000 Musulli) (2 storey with 2 storied Director: Md. Zahed MuradIndex
foundation) including ancillary works for Establishment of Sheikh No. C-601 (Navy)
60 Hasina Cantonment, Barisal (Mosque-02). Tk. 5,66,91,138.14 Wks Dte 1 1 0

Total= 47 33 14
wing Structural Drawing MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining Remarks

Advance
Engineering
E6 1 1 0 E6 Wks Dte 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
1 1 0 E6 Wks Dte 1 0 1
(Engr.
Monaim)

Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
18-09-18 (Engr. 18-09-18 18-09-18
Monaim)

Advance
Engineering
1 1 0 E6 1 0 1
(Engr.
Monaim)

Advance
Engineering
N/A 0 0 0 N/A 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
1 1 0 E6 1 0 1
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)

Advance
E6 Engineering E6 E6
1 1 0 1 1 0
04-11-2018 (Engr. 04-11-2018 04-11-2018
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 E6
(Engr.
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 As Built
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
As Built 0 0 0 As Built 0 0 0 N/A
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
1 0 1 SOIII [D] 1 0 1
(Engr.
Monaim)

Advance
E6 Engineering E6 E6
1 1 0 1 1 0
10-09-18 (Engr. 10-09-18 10-09-18
Monaim)

Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)

Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)
Advance
E6 Engineering E6 E6
1 1 0 1 1 0
24-09-18 (Engr. 24-09-18 24-09-18
Monaim)

Advance
Engineering
1 0 1 1 0 1
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering SO-I (P&A) on 08-11-
1 1 0 1 0 1
(Engr. 2018 at 0900 Hrs
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

SO-I (P&A)
15102018 AT 1200 HRS
Advance
ALL SIGNATURE
Engineering
1 1 0 COMPLETE BUT 1 0 1
(Engr.
PENDING IN SECTION
Monaim)
FOR REVISED PILE
LONG SECTION
Advance
SOII [D]
Engineering
1 0 1 07/11/18 1 0 1
(Engr.
01:25 PM
Monaim)

Advance
Engineering
1 0 1 SOIII [D] 1 0 1
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)

Advance
E6 Engineering E6 E6
1 1 0 1 1 0
16-0918 (Engr. 16-0918 16-0918
Monaim)

Advance
Engineering
N/A 0 0 0 N/A 0 0 0 N/A
(Engr.
Monaim)

Advance
Engineering E6
1 1 0 1 0 1
(Engr. 10-09-18
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)
Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
Engineering E6
As Built 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)

Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)

Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)

Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)

Advance
Engineering E6
N/A 1 1 0 0 0 0 N/A
(Engr. On 17-10-18
Monaim)

Advance
Engineering
E6 1 1 0 E6 1 1 0 E6
(Engr.
Monaim)

Advance
E6 Engineering E6 E6
1 1 0 1 1 0
23-10-18 (Engr. On 23-10-18 On 23-10-18
Monaim)

52 46 6 36 22 14
Ser CA No & Name of Works Name of Contractor’s Firm

CA No. EINC/ 10 of 2018-2019 M/S. S. N.Construction


Construction of Spinning Shed (Cotton & Jute) (2 storey
1 building with 2 storied foundation) including ancillary works Prop: Md. Sazzad Nur
for Establishment of Sylhet Textile Institute. Mob:01610195225

CA No. EINC/ 11 of 2018-2019 M/S. CTM International


Construction of Dyeing Shed (2 storey building with 2 storied Prop:Mostafizur Rahman
2 foundation) including ancillary works for Establishment of (Mostafiz)
Sylhet Textile Institute. Mob:01711043372

CA No. EINC/ 13 of 2018-2019 M/S. S. N.Construction


Construction of Academic Cum Administrative Building (4
3 storey building with 4 storied foundation) including ancillary Prop: Md. Sazzad Nur
works for Establishment of Sylhet Textile Institute. Mob:01610195225

CA No. EINC/ 15 of 2018-2019 M/S. CTM International


Construction of Workshop cum Library (2 storey building Prop:Mostafizur Rahman
4 with 2 storied foundation) including ancillary works for (Mostafiz)
Establishment of Sylhet Textile Institute. Mob:01711043372

CA No. EINC/ 17 of 2018-2019


Construction of Female Hostel building (100 bedded) (4 M/S. S. N.Construction
5 storey building with 4 storied foundation) (Kitchen & Prop: Md. Sazzad Nur
Laundry in each floor) including ancillary works for Mob:01610195225
Establishment of Sylhet Textile Institute.
CA No. EINC/ 21 of 2018-2019 M/S. CTM International
Construction of Officers’ Dormitory (4 storey building with 4 Prop:Mostafizur Rahman
6 storied foundation) including ancillary works for (Mostafiz)
Establishment of Sylhet Textile Institute. Mob:01711043372

CA No. EINC/ 22 of 2018-2019 M/S. S. N.Construction


Construction of Boys Hostel building (100 bedded) (4 storey
7 building with 4 storied foundation) including ancillary works Prop: Md. Sazzad Nur
for Establishment of Sylhet Textile Institute. Mob:01610195225

CA No. EINC/ 24 of 2018-2019 M/S. S. N.Construction


Construction of Weaving Shed (Weaving & Knitting) (2 storey
8 building with 2 storied foundation) including ancillary works Prop: Md. Sazzad Nur
for Establishment of Sylhet Textile Institute. Mob:01610195225

TOT
Architectural Drawing Structu
CA Amount
Consultants Total Completed Remaining Remarks Consultants Total

Tk. 10,25,51,894.28 Wks Dte 1 0 1 Wks Dte 1

MASTER COPY
Tk. 4,01,87,521.33 Wks Dte 1 0 1
SO II [A]
Wks Dte 1

Tk. 8,03,55,927.00 Wks Dte 1 0 1 E/M Wks Dte 1

Tk. 3,10,33,416.03 Wks Dte 1 0 1 Wks Dte 1

MASTER COPY
SO III [A]
Tk. 6,12,19,300.00 Wks Dte 1 0 1
20181107 1145
Wks Dte 1
HRS
Tk. 3,00,19,641.49 Wks Dte 1 0 1 Wks Dte 1

MASTER COPY
back to section for
correction by SO II
Tk. 5,25,65,458.00 Wks Dte 1 0 1 [D] Wks Dte 1
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
Tk. 7,92,11,002.00 Wks Dte 1 0 1 [D] Wks Dte 1
07-11-2018
09:15 AM

TOTAL= 8 0 8 8
Structural Drawing MEP Drawing

Completed Remaining Remarks Consultants Total Completed Remaining

0 1 Wks Dte 1 0 1

MASTER COPY
0 1 SO II [A] Wks Dte 1 0 1
20181105 1010 hrs

0 1 E/M Wks Dte 1 0 1

0 1 Wks Dte 1 0 0

0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1

MASTER COPY
back to section for
correction by SO II
0 1 [D] Wks Dte 1 0 1
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
0 1 [D] Wks Dte 1 0 1
07-11-2018
09:15 AM

0 8 8 0 7
Remarks
Remarks

MASTER COPY
SO II [A]
20181105 1010 hrs

E/M
MASTER COPY
back to section for
correction by SO II
[D]
07-11-2018
14:00 hrs
MASTER COPY
back to section for
correction by SO II
[D]
07-11-2018
09:15 AM
Ser CA No & Name of Works Name of Contractor’s Firm

CA No. EINC/ 12 of 2018-2019


H. B. Traders Ltd
Construction of Workshop cum Library (2 storey building
Managing Director:
1 with 2 storied foundation) including ancillary works for
Kazi Hafizur Rahman
Establishment of Sheikh Russel Textile Engineering
Mob: 01713358650
College, Sylhet.

CA No. EINC/ 14 of 2018-2019


H. B. Traders Ltd
Construction of Academic Cum Administrative Building (4
Managing Director:
2 storey building with 4 storied foundation) including ancillary
Kazi Hafizur Rahman
works for Establishment of Sheikh Russel Textile
Mob: 01713358651
Engineering College, Sylhet.

CA No. EINC/ 16 of 2018-2019


H. B. Traders Ltd
Construction of Staff Dormitory (6 storey building with 6
Managing Director:
3 storied foundation) including ancillary works for
Kazi Hafizur Rahman
Establishment of Sheikh Russel Textile Engineering
Mob: 01713358652
College, Sylhet.

CA No. EINC/ 18 of 2018-2019


H. B. Traders Ltd
Construction of Spinning Shed (Cotton & Jute) (2 storey
Managing Director:
4 building with 2 storied foundation) including ancillary works
Kazi Hafizur Rahman
for Establishment of Sheikh Russel Textile Engineering
Mob: 01713358653
College, Sylhet.

CA No. EINC/ 19 of 2018-2019


Construction of Officers’ Dormitory (6 storey building with 6 Alpha International
5 storied foundation) including ancillary works for Prop: Mirazul Islam
Establishment of Sheikh Russel Textile Engineering Mob:01766554423
College, Sylhet.
CA No. EINC/ 20 of 2018-2019
H. B. Traders Ltd
Construction of Female Hostel (100 bedded) (4 storey
Managing Director:
6 building with 4 storied foundation) including ancillary works
Kazi Hafizur Rahman
for Establishment of Sheikh Russel Textile Engineering
Mob: 01713358653
College, Sylhet.

CA No. EINC/ 23 of 2018-2019


H. B. Traders Ltd
Construction of Boys Hostel (200 bedded) (6 storey
Managing Director:
7 building with 6 storied foundation) including ancillary works
Kazi Hafizur Rahman
for Establishment of Sheikh Russel Textile Engineering
Mob: 01713358653
College, Sylhet.

CA No. EINC/ 25 of 2018-2019


Construction of Dyeing Shed (2 storey building with 2 Alpha International
8 storied foundation) including ancillary works for Prop: Mirazul Islam
Establishment of Sheikh Russel Textile Engineering Mob:01766554423
College, Sylhet.

CA No. EINC/ 26 of 2018-2019


H. B. Traders Ltd
Construction of Weaving Shed (Weaving & Knitting) (2
Managing Director:
9 storey building with 2 storied foundation) including ancillary
Kazi Hafizur Rahman
works for Establishment of Sheikh Russel Textile
Mob: 01713358653
Engineering College, Sylhet.

TOT
Architectural Drawing Structural Drawin
CA Amount
Consultants Total Completed Remaining Remarks Consultants Total

Tk. 3,05,19,070.95 Wks Dte 1 0 1 Wks Dte 1

Tk. 8,04,14,935.38 Wks Dte 1 0 1 Wks Dte 1

Tk. 3,89,80,700.80 Wks Dte 1 0 1 Wks Dte 1

Tk. 10,25,47,141.28 Wks Dte 1 0 1 Wks Dte 1

Tk. 4,15,71,151.14 Wks Dte 1 0 1 Wks Dte 1


Tk. 6,49,96,340.68 Wks Dte 1 0 1 Wks Dte 1

Tk. 10,14,69,704.80 Wks Dte 1 0 1 Wks Dte 1

Tk. 4,01,18,850.79 Wks Dte 1 0 1 Wks Dte 1

Tk. 7,92,32,472.63 Wks Dte 1 0 1 Wks Dte 1

TOTAL= 9 0 9 9
Structural Drawing MEP Drawing

Completed Remaining Remarks Consultants Total Completed Remaining Remarks

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1
0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 1 Wks Dte 1 0 1

0 9 9 0 9
Remarks
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount

1
CA No. EINC/ 345 of 2017-2018 Advance Engineering
Digital Survey, Soil Test, Material Test & Load Test for Establishment Prop: Md. Monayem Hossain, Tk. 9,00,000.00
of Faridpur Textile Institute. M.Sc. Engg (Civil)

2
Shepherd Consultant and
CA No. EINC/ 401 of 2017-2018 Management Ltd
Construction of Officer Dormitory (4 storey building with 4 storied
foundation) including ancillary works for Establishment of Faridpur Managing Director: Mafiz Ahmed Tk. 3,71,38,848.94
Textile Institute. Bhuiyan
Index No. C-895 (Army)

3
Shepherd Consultant and
CA No. EINC/ 402 of 2017-2018 Management Ltd
Construction of Spinning Shed (Cotton & Jute) (2 storey building with 2
storied foundation) including ancillary works for Establishment of Managing Director: Mafiz Ahmed Tk. 9,41,43,914.54
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)

4
Shepherd Consultant and
CA No. EINC/ 403 of 2017-2018 Management Ltd
Construction of Workshop cum Library (2 storey building with 2 storied
foundation) including ancillary works for Establishment of Faridpur Managing Director: Mafiz Ahmed Tk. 3,10,98,154.91
Textile Institute. Bhuiyan
Index No. C-895 (Army)

5
Shepherd Consultant and
CA No. EINC/ 404 of 2017-2018 Management Ltd
Construction of Female Hostel (100 bedded) (4 storey building with 4 Managing Director: Mafiz Ahmed Tk. 5,80,64,438.76
storied foundation) including ancillary works for Establishment of
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)
6
Shepherd Consultant and
CA No. EINC/ 405 of 2017-2018 Management Ltd
Construction of Weaving Shed (Weaving & Knitting) (2 storey building Managing Director: Mafiz Ahmed Tk. 7,36,43,575.73
with 2 storied foundation) including ancillary works for Establishment of
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)

7
Shepherd Consultant and
CA No. EINC/ 406 of 2017-2018 Management Ltd
Construction of Dyeing Shed (2 storey building with 2 storied Managing Director: Mafiz Ahmed Tk. 3,93,96,393.05
foundation) including ancillary works for Establishment of Faridpur
Textile Institute. Bhuiyan
Index No. C-895 (Army)

8
Shepherd Consultant and
CA No. EINC/ 407 of 2017-2018 Management Ltd
Construction of Academic Cum Administrative Building (4 storey
building with 4 storied foundation) including ancillary works for Managing Director: Mafiz Ahmed Tk. 10,04,72,849.91
Establishment of Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)

9
Shepherd Consultant and
CA No. EINC/ 408 of 2017-2018 Management Ltd
Construction of Boys Hostel (100 bedded) (4 storey building with 4
storied foundation) including ancillary works for Establishment of Managing Director: Mafiz Ahmed Tk. 5,19,80,047.84
Faridpur Textile Institute. Bhuiyan
Index No. C-895 (Army)

TOTA
Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed

Wks Dte 0 0 0 N/A Wks Dte 0 0

E6
Wks Dte 1 1 0 Wks Dte 1 1
25-09-18

E6
Wks Dte 1 1 0 Wks Dte 1 1
24-09-18

E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018

MASTER COPY
Approved by SO II
Wks Dte 1 0 1 [D] Wks Dte 1 1
07-11-2018
14:00 hrs
E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018

E6
Wks Dte 1 1 0 Wks Dte 1 1
24-09-18

E6
Wks Dte 1 1 0 Wks Dte 1 1
04-11-2018

SO III [D] 20181106


Wks Dte 1 0 1 Wks Dte 1 1
1030 hrs

TOTAL= 8 6 2 8 8
ructural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed Remaining Remarks

0 N/A Wks Dte 0 0 0 N/A

E6 E6
0 Wks Dte 1 1 0
25-09-18 25-09-18

E6 E6
0 Wks Dte 1 1 0
24-09-18 24-09-18

E6 E6
0 Wks Dte 1 1 0
24-09-18 04-11-2018

MASTER COPY
Approved by SO II
E6 [D]
0 Wks Dte 1 0 1
30-09-18 07-11-2018
14:00 hrs
E6 E6
0 Wks Dte 1 1 0
04-11-2018 04-11-2018

E6 E6
0 Wks Dte 1 1 0
24-09-18 24-09-18

E6 E6
0 Wks Dte 1 1 0
04-11-2018 04-11-2018

PILOT COPY
SO II [A] 20181011
E6
0 Wks Dte 1 0 1 1400 hrs Back to
16-09-18
Section for Corection
(stair issue)

0 8 6 2
Remarks
Ser CA No & Name of Works Name of Contractor’s Firm

CA No. EINC/ 250 of 2017-2018 Western Engineering (Pvt)


Construction of 1 x Mosque (2 storey with 2 storied Ltd.
1 foundation) including ancillary works for Establishment of
Sheikh Hasina Textile Engineering College, Melandah, Managing Director: Bashir
Jamalpur. Ahmed

CA No. EINC/ 253 of 2017-2018 Western Engineering (Pvt)


Vertical extension of 4th & 5th floor over existing 3rd floor of Ltd.
2 Staff Dormitory (4 storey with 6 storied foundation) including
ancillary works for Establishment of Sheikh Hasina Textile Managing Director: Bashir
Engineering College, Melandah, Jamalpur. Ahmed

CA No. EINC/ 256 of 2017-2018 Western Engineering (Pvt)


Vertical extension of 4th & 5th floor over existing 3rd floor of Ltd.
3 Staff Quarter(4 storey with 6 storied foundation) including
ancillary works for Establishment of Sheikh Hasina Textile Managing Director: Bashir
Engineering College, Melandah, Jamalpur. Ahmed

CA No. EINC/ 258 of 2017-2018 Western Engineering (Pvt)


Construction of Cafeteria (Single storey with single storied Ltd.
4 foundation) including ancillary works for Establishment of
Sheikh Hasina Textile Engineering College, Melandah, Managing Director: Bashir
Jamalpur. Ahmed
CA No. EINC/ 261 of 2017-2018 Western Engineering (Pvt)
Construction of External and Internal Drain for Ltd.
5 Establishment of Sheikh Hasina Textile Engineering College, Managing Director: Bashir
Melandah, Jamalpur. Ahmed

CA No. EINC/ 264 of 2017-2018 Western Engineering (Pvt)


Construction of Boundary wall with barbed wire fencing Ltd.
6 including ancillary works for Establishment of Sheikh Hasina Managing Director: Bashir
Textile Engineering College, Melandah, Jamalpur. Ahmed

CA No. EINC/ 268 of 2017-2018 Western Engineering (Pvt)


Vertical extension of 4th & 5th floor over existing 3rd floor of Ltd.
7 Officers Quarter (4 storey with 6 storied foundation)
including ancillary works for Establishment of Sheikh Hasina Managing Director: Bashir
Textile Engineering College, Melandah, Jamalpur. Ahmed

CA No. EINC/ 269 of 2017-2018 Western Engineering (Pvt)


Vertical extension of 4th & 5th floor over existing 3rd floor of Ltd.
8 Officer Dormitory (4 storey with 6 storied foundation)
including ancillary works for Establishment of Sheikh Hasina Managing Director: Bashir
Textile Engineering College, Melandah, Jamalpur. Ahmed

Western Engineering (Pvt)


CA No. EINC/ 275 of 2017-2018 Ltd.
9 Land development for Establishment of Sheikh Hasina Textile
Engineering College, Melandah, Jamalpur. Managing Director: Bashir
Ahmed
CA No. EINC/ 276 of 2017-2018 Western Engineering (Pvt)
Construction of 1 x 150 Bedded Boys hostel (6 Storied Ltd.
10 building with 6 storied foundation) including ancillary works
for Establishment of Sheikh Hasina Textile Engineering Managing Director: Bashir
College, Melandah, Jamalpur. Ahmed

CA No. EINC/ 277 of 2017-2018 Western Engineering (Pvt)


Construction of Multipurpose Hall (3 storey with 3 storied Ltd.
11 foundation) including ancillary works for Establishment of
Sheikh Hasina Textile Engineering College, Melandah, Managing Director: Bashir
Jamalpur. Ahmed

CA No. EINC/ 278 of 2017-2018


Vertical extension of 4th & 5th floor over existing 3rd floor of Western Engineering (Pvt)
Academic cum Administrative Building (4 storey with 6 Ltd.
12 storied foundation) including ancillary works for Managing Director: Bashir
Establishment of Sheikh Hasina Textile Engineering College, Ahmed
Melandah, Jamalpur.

CA No. EINC/ 279 of 2017-2018


Vertical extension of 4th & 5th floor over existing 3rd floor of Western Engineering (Pvt)
Female Hostel (300 Bedded) (4 storey with 6 storied Ltd.
13 foundation) including ancillary works for Establishment of Managing Director: Bashir
Sheikh Hasina Textile Engineering College, Melandah, Ahmed
Jamalpur.

CA No. EINC/ 280 of 2017-2018 Western Engineering (Pvt)


Construction of Road, Hardstanding and Footpath for Ltd.
14 Establishment of Sheikh Hasina Textile Engineering College, Managing Director: Bashir
Melandah, Jamalpur. Ahmed
T
Architectural Drawing Struc
CA Amount
Consultants Total Completed Remaining Remarks Consultants

MASTER COPY HDM


Bari 06112018
Tk. 2,28,95,529.29 Wks Dte 1 0 1 0845 HRS Wks Dte

E6
Tk. 2,04,32,574.95 Wks Dte 1 1 0
04-11-2018
Wks Dte

E6
Tk. 2,01,20,248.37 Wks Dte 1 1 0 Wks Dte
04-11-2018

Tk. 2,04,37,423.93 Wks Dte 1 0 1 Wks Dte


Tk. 2,65,97,388.92 Wks Dte 1 0 1 Wks Dte

Tk. 3,24,81,352.27 Wks Dte 1 0 1 Wks Dte

E6
Tk. 2,91,70,255.91 Wks Dte 1 1 0
06-11-2018
Wks Dte

E6
Tk. 2,38,11,023.68 Wks Dte 1 1 0
06-11-2018
Wks Dte

Tk. 9,67,80,845.98 Wks Dte 0 0 0 N/A Wks Dte


Sent to Section
Tk.11,75,24,573.29 Wks Dte 1 0 1
for Correction
Wks Dte

Tk.12,86,29,518.49 Wks Dte 1 0 1 Wks Dte

MASTER COPY Back


to Draftsman Sohel
Tk. 3,78,97,928.49 Wks Dte 1 0 1 Rana 07112018 Wks Dte
0815 HRS by SO-
II (D)

MASTER COPY
06112018 1400
Tk. 4,52,30,957.73 Wks Dte 1 0 1
HRS back to sec
Wks Dte
fromTEC

Tk. 4,37,22,432.42 Wks Dte 1 0 1 Wks Dte


TOTAL= 13 4 9
Structural Drawing MEP Drawing

Total Completed Remaining Remarks Consultants Total Completed Remaining

E6
1 1 0 Wks Dte 1 0 1
16-09-18

E6
1 1 0 Wks Dte 1 1 0
04-11-2018

E6
1 1 0 Wks Dte 1 1 0
04-11-2018

1 0 1 Wks Dte 1 0 1
1 0 1 Wks Dte 1 0 1

1 0 1 Wks Dte 1 0 1

E6
1 1 0 Wks Dte 1 1 0
06-11-2018

E6
1 1 0 Wks Dte 1 1 0
06-11-2018

0 0 0 N/A Wks Dte 0 0 0


Sent to Section
1 0 1 Wks Dte 1 0 1
for Correction

1 0 1 Wks Dte 1 0 1

MASTER COPY
Back to Draftsman
Sohel Rana
1 0 1 07112018 0815 Wks Dte 1 0 1
HRS by SO-II
(D)

1 0 1 Wks Dte 1 0 1

1 0 1 Wks Dte 1 0 1
13 5 8 13 4 9
Remarks
Remarks

E6
04-11-2018

E6
04-11-2018
E6
06-11-2018

E6
06-11-2018

N/A
Sent to Section
for Correction

MASTER COPY Back


to Draftsman Sohel
Rana 07112018
0815 HRS by SO-
II (D)
Ser CA No & Name of Works

CA No. EINC/ 114 of 2017-2018


1 Site development/Earth filling for Establishment of BNS
Sher-e-Bangla (Group-01).

CA No. EINC/ 115 of 2017-2018


2 Site development/Earth filling for Establishment of BNS
Sher-e-Bangla (Group-02).

CA No. EINC/ 288 of 2017-2018


Construction of 1 x Bellman Hanger (Single storey with
3 Single storied steel structure, keeping the plinth level above
flood level for ground floor) including ancillary works of BNS
SHER-E-BANGLA Patuakhali.

CA No. EINC/ 289 of 2017-2018


Construction of 1 x 500 Sailors’ Accommodation (4 Wing
4 building) (6 storey building with 6 storied foundation,
Ground floor open) including ancillary works of BNS SHER-
E-BANGLA Patuakhali.

CA No. EINC/ 290 of 2017-2018


Construction of 1 x Dining Hall, Ships Galley, Scullery,
Indoor Games, Cold Store, Cool Store, Vegetable Store,
5 Victualling Store, Gas Store, Recreation Room, Library, IT
Centre (3 storey building with 3 storied foundation)
including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 292 of 2017-2018


Construction of 1 x MES Office building (3 storey building
6
with 3 storied foundation, Ground floor open) including
ancillary works at BNS SHER-E-BANGLA Patuakhali.
CA No. EINC/ 293 of 2017-2018
Construction of 1 x Junior Commissioned Officers’ Mess (6
7 storey building with 6 storied foundation, keeping the plinth
level above flood level for ground floor) including ancillary
works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 294 of 2017-2018


Construction of 1 x Petty Officers’ Mess (6 storey building
8 with 6 storied foundation, keeping the plinth level above
flood level for ground floor) including ancillary works at BNS
SHER-E-BANGLA Patuakhali.

CA No. EINC/ 295 of 2017-2018


Construction of 1 x Naval Provost Marshal Staff Barrack (3
9 storey building with 3 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 296 of 2017-2018


Construction of 1 x Mosque (3 storey building with 3 storied
10 foundation, keeping the plinth level above flood level for
ground floor) including ancillary works at BNS SHER-E-
BANGLA Patuakhali.

CA No. EINC/ 297 of 2017-2018


Construction of 1 x Utility building-1 (Canteen, Bakery
shop, Recreation room, CSD, Waiting room, Tailor shop,
11 Laundry shop, Barber shop and Cobbler shop) (3 storey
building with 3 storied foundation, keeping the plinth level
above flood level for ground floor) including ancillary works
at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 298 of 2017-2018


Construction of 1 x Utility building-2 (Cafeteria, Fleet club,
Conference room, MI room, Health club, Fitness center,
12
Welfare Office and Language Lab) (3 storey building with 5
storied foundation, Ground floor open) including ancillary
works at BNS SHER-E-BANGLA Patuakhali.
CA No. EINC/ 299 of 2017-2018
Construction of 1 x Area Security Office and Naval Provost
13 Marshal Office (6 storey building with 6 storied foundation,
Ground floor open) including ancillary works at BNS SHER-
E-BANGLA Patuakhali.

CA No. EINC/ 300 of 2017-2018


Construction of 1 x Motor Transport Office building (3 storey
14 building with 3 storied foundation, Ground floor open)
including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 301 of 2017-2018


Construction of 1 x Aviation Support Office building (3
15 storey building with 3 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 302 of 2017-2018


Construction of 1 x Junior Commissioned Officers’ Training
16 Block (6 storey building with 6 storied foundation, Ground
floor open) including ancillary works at BNS SHER-E-
BANGLA Patuakhali.

CA No. EINC/ 303 of 2017-2018


Construction of 1 x Admin building (3 storey building with 6
17
storied foundation, Ground floor open) including ancillary
works of BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 304 of 2017-2018


Construction of 1 x Bachelor Officers’ Quarter (BOQ) (5
18 storey building with 6 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.
CA No. EINC/ 305 of 2017-2018
Construction of 1 x Officers’ Mess (Galley, Dining, Indoor
Games, Recreation Room, Library, VIP Wing, Blue Room,
19
Cafeteria and Pool/Snooker Room) (3 storey building with 3
storied foundation, Ground floor open) including ancillary
works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 306 of 2017-2018


Construction of 1 x Visiting Officers’ Quarter (3 storey
20 building with 3 storied foundation, Ground floor open)
including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 307 of 2017-2018


Construction of 1 x Officers’ Residence (‘D’ Type) (keeping
21 ground floor open 10 storey building, 36 nos Flat with 10
storied foundation, 4 nos unit in each floor) including
ancillary works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 308 of 2017-2018Construction of 1 x


Officers’ Residence (‘C’ Type) (keeping ground floor open 6
22 storey building, 20 nos Flat with 10 storied foundation, 4
nos unit in each floor) including ancillary works at BNS
SHER-E-BANGLA Patuakhali.

CA No. EINC/ 309 of 2017-2018Construction of 1 x


Officers’ Residence (‘B’ Type) (keeping ground floor open 6
23 storey building, 10 nos Flat with 6 storied foundation, 2 nos
unit in each floor) including ancillary works at BNS SHER-
E-BANGLA Patuakhali.

CA No. EINC/ 310 of 2017-2018


Construction of 1 x SWADS building (3 storey building with
24
5 storied foundation, Ground floor open) including ancillary
works at BNS SHER-E-BANGLA Patuakhali.
CA No. EINC/ 311 of 2017-2018
Construction of 1 x Officers’ Residence (‘E’ Type) (keeping
25 ground floor open 6 storey building, 10 nos Flat with 6
storied foundation, 2 nos unit in each floor) including
ancillary works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 312 of 2017-2018


Construction of 1 x Electrical Shop (2 storey building with 2
26
storied foundation, Ground floor open) including ancillary
works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 313 of 2017-2018


27 Construction of Road for Establishment of BNS SHER-E-
BANGLA Patuakhali.

CA No. EINC/ 338 of 2017-2018


28 Soil Test for Proposed buildings for Establishment of BNS
SHER-E-BANGLA Patuakhali

CA No. EINC/ 340 of 2017-2018


Construction of 1 x Gunnery Office, Armament Office,
Armament Store, Maintenance Office and Store, Band
29
Office and Store (6 storey building with 6 storied
foundation, Ground floor open) including ancillary works at
BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 341 of 2017-2018


Construction of 1 x Main Guard Room and Sickbay
(Magazine, Armory, CPOOD, POOD, Quarter Master, OOD,
30
Regulating Officer and Master at Arms Room) (2 storey
building with 3 storied foundation, Ground floor open)
including ancillary works of BNS SHER-E-BANG.
CA No. EINC/ 342 of 2017-2018
Construction of 1 x 50 Bedded Hospital (Admin Office,
OPD, OT, Medical Ward, Pathology, Dental Wing, Skin,
31 Eye, E&T Outdoor, X-ray, Galley and Medical Store) (4
storey building with 6 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 367 of 2017-2018


Construction of 1 x Petty Officers’ Family Quarter (keeping
ground floor open 10 storey building, 36 nos Flat) with 10
32
storied foundation, 4 nos unit in each floor) including
ancillary works at BNS SHER-E-BANGLA Patuakhali (Petty
Officers’ Family Quarter No. 01).

CA No. EINC/ 368 of 2017-2018


Construction of 1 x Petty Officers’ Family Quarter (keeping
ground floor open 10 storey building, 36 nos Flat) with 10
33
storied foundation, 4 nos unit in each floor) including
ancillary works at BNS SHER-E-BANGLA Patuakhali (Petty
Officers’ Family Quarter No. 02).

CA No. EINC/ 369 of 2017-2018


Construction of 1 x Junior Commissioned Officers’ Family
Quarter (keeping ground floor open 10 storey building, 36
34 nos Flat with 10 storied foundation, 4 nos unit in each floor)
including ancillary works at BNS SHER-E-BANGLA
Patuakhali (Junior Commissioned Officers’ Family Quarter
No. 01).

CA No. EINC/ 370 of 2017-2018


Construction of 1 x Junior Commissioned Officers’ Family
Quarter (keeping ground floor open 10 storey building, 36
35 nos Flat with 10 storied foundation, 4 nos unit in each floor)
including ancillary works at BNS SHER-E-BANGLA
Patuakhali (Junior Commissioned Officers’ Family Quarter
No. 02).

CA No. EINC/ 372 of 2017-2018


Construction of 1 x Base Supply Office (2 storey building
36
with 5 storied foundation, Ground floor open) including
ancillary works at BNS SHER-E-BANGLA Patuakhali.
CA No. EINC/ 373 of 2017-2018
Construction of 1 x Naval Store Depot Admin Block (4
37 storey building with 5 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

CA No. EINC/ 374 of 2017-2018


Construction of 1 x Sailors’ Family Quarter (keeping ground
floor open 10 storey building, 36 nos Flat with 10 storied
38
foundation, 4 nos unit in each floor) including ancillary
works at BNS SHER-E-BANGLA Patuakhali (Sailors’
Family Quarter No. 01).

CA No. EINC/ 375 of 2017-2018


Construction of 1 x Sailors’ Family Quarter (keeping ground
floor open 10 storey building, 36 nos Flat with 10 storied
39
foundation, 4 nos unit in each floor) including ancillary
works at BNS SHER-E-BANGLA Patuakhali (Sailors’
Family Quarter No. 02).

CA No. EINC/ 376 of 2017-2018


Construction of 1 x BN School & College (5 storey building
40
with 5 storied foundation, Ground floor open) including
ancillary works at BNS SHER-E-BANGLA Patuakhali.

CA No. EINC/ 399 of 2017-2018


Construction of 1 x Hydrographic & Oceanographic and
41 Meteorological (3 storey building with 6 storied foundation,
Ground floor open) including ancillary works at BNS SHER-
E-BANGLA Patuakhali.

CA No. EINC/ 400 of 2017-2018


Construction of 1 x Base Electrical and Engineering Office
42 (2 storey building with 3 storied foundation, Ground floor
open) including ancillary works at BNS SHER-E-BANGLA
Patuakhali.

MOTOR TRANSPORT SHOP (01 STORIED INDUSTRIAL SHED)

06XWATCH TOWER
1 X NSD WARE HOUSE (01 STORIED)

1 X BSD WARE HOUSE (01 STORIED)


Architectural Drawin
Name of Contractor’s Firm CA Amount
Consultants Total

Ikhtear Uddin Khan Limited MRA


Managing Director : Ikhtear ARCHITECTS
Tk. 30,81,07,367.25 0
Uddin Khan (ARCH
Index No. EinC/A-33 (Navy) MAMUN)

Hossain Construction
MRA
(Pvt.) Ltd
ARCHITECTS
Managing Director: Md. Tk. 30,81,07,367.25 0
(ARCH
Anwar Hossain
MAMUN)
Index No. EinC/A-56 (Air)

MRA
NDE Steel Structures Ltd
ARCHITECTS
Managing Director: Imran Tk. 25,62,03,496.82 1
(ARCH
Mustafiz
MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 23,06,71,957.01 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 15,28,46,375.48 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 2,91,33,187.58 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)
AWR Developments (BD) MRA
Ltd ARCHITECTS
Tk. 10,19,09,325.85 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 5,75,60,713.85 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 2,22,87,472.17 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 6,17,73,282.73 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 2,88,88,384.04 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 4,97,02,321.07 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)
AWR Developments (BD) MRA
Ltd ARCHITECTS
Tk. 5,53,34,468.35 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 2,69,45,969.68 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 2,89,06,227.95 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

AWR Developments (BD) MRA


Ltd ARCHITECTS
Tk. 14,74,36,367.28 1
Chairman: Chowdhury Fazle (ARCH
Imam MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 10,00,53,653.39 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 13,73,69,389.43 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 35,63,84,636.52 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 7,37,70,028.32 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 17,95,22,824.27 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 13,04,35,706.50 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 10,06,72,488.83 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 4,00,23,238.16 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 5,00,49,012.32 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 2,91,20,645.75 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 9,43,03,762.22 1
(ARCH
Mazharul Islam
MAMUN)

Alpah Soil & Foundation MRA


Engineers ARCHITECTS
Tk. 33,00,000.00 0
Prop: Engr. Md. Jakir (ARCH
Hossain, B.Sc. Engg MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 6,14,54,260.14 1
(ARCH
Mazharul Islam
MAMUN)

MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 4,08,91,334.99 1
(ARCH
Mazharul Islam
MAMUN)
MRA
Property Development Ltd
ARCHITECTS
Chief Operating Officer: S.M. Tk. 16,77,38,427.82 1
(ARCH
Mazharul Islam
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,86,17,947.38 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,86,17,947.38 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 10,14,39,525.15 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 10,14,39,525.15 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 2,28,70,773.32 1
(ARCH
Index No. C-909 (Army)
MAMUN)
MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 3,80,20,498.60 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,94,84,159.61 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 8,94,84,159.61 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MRA
M/S. S. M Construction
ARCHITECTS
Prop: Md.Hasibur Rahman Tk. 18,52,93,348.66 1
(ARCH
Index No. C-909 (Army)
MAMUN)

MHR Enterprise MRA


Prop: Brig Gen Md. Habibur ARCHITECTS
Tk. 4,37,26,647.84 1
Rahman, afwc, psc (Retd) (ARCH
Index No. C-1021 (Army) MAMUN)

MHR Enterprise MRA


Prop: Brig Gen Md. Habibur ARCHITECTS
Tk. 2,37,97,785.51 1
Rahman, afwc, psc (Retd) (ARCH
Index No. C-1021 (Army) MAMUN)
TOTAL= 39
Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total Completed

MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 0 N/A 0 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 1 1 0
(ARCH
MAMUN)
0 39 39 0
Structural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed

MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-08-18 AND REVISED (ARCH
SENT TO E6 ON 11-09-18 MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-08-18 AND REVISED (ARCH
SENT TO E6 ON 11-09-18 MAMUN)
PILE LAYOUT PLAN (02 MRA
COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-08-18 AND REVISED (ARCH
SENT TO E6 ON 11-09-18 MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
11-09-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
04-11-18 (ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
0 N/A 0 0
(ARCH
MAMUN)

MRA
PILE LAYOUT PLAN (02 ARCHITECTS
1 COPIES) SENT TO E6 ON 1 0
29-10-18 (ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-10-18 and revised on (ARCH
04-11-18 MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-10-18 and revised on (ARCH
04-11-18 MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)
MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-10-18 and revised on (ARCH
04-11-18 MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

MRA
ARCHITECTS
1 1 0
(ARCH
MAMUN)

PILE LAYOUT PLAN (02 MRA


COPIES) SENT TO E6 ON ARCHITECTS
1 1 0
29-10-18 and revised on (ARCH
04-11-18 MAMUN)

PILE LAYOUT PLAN (02


COPIES) SENT TO E6 ON
11-09-18
PILE LAYOUT PLAN (02
COPIES) SENT TO E6 ON
11-09-18
PILE LAYOUT PLAN (02
COPIES) SENT TO E6 ON
29-10-18
PILE LAYOUT PLAN (02
COPIES) SENT TO E6 ON
29-10-18

39 39 0
P Drawing
Remarks
Remaining Remarks

0 N/A

0 N/A

1
1

1
1

1
1

1
1

0 N/A

1
1

1
1

1
39
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount

CA No. EINC/ 188 of 2017-2018


Mahabub Brothers Private
Construction of Commandant Office (2 storey with 2 storied
Limited
1 foundation) including ancillary works for Establishment of Tk. 4,07,79,587.29
Managing Director: Sheikh
Airmen Training Institute at BAF Base Zahurul Haque in
Mahabub Rahman
Chittagong.

CA No. EINC/ 189 of 2017-2018


Mahabub Brothers Private
Construction of Lady Airmen Barrack (2 storey with 2
Limited
2 storied foundation) including ancillary works for Tk. 3,77,07,085.54
Managing Director: Sheikh
Establishment of Airmen Training Institute at BAF Base
Mahabub Rahman
Zahurul Haque in Chittagong.

CA No. EINC/ 190 of 2017-2018


Construction of Dormitory building (9 storey with 9 storied Mahabub Brothers Private
foundation, Ground floor open), Trainers’ Dormitory Limited
3 Tk. 7,91,36,713.30
including ancillary works for Establishment of Airmen Managing Director: Sheikh
Training Institute at BAF Base Zahurul Haque in Mahabub Rahman
Chittagong.

CA No. EINC/ 191 of 2017-2018


Mahabub Brothers Private
Construction of Library building (2 storey with 2 storied
Limited
4 foundation) including ancillary works for Establishment of Tk. 2,49,53,667.53
Managing Director: Sheikh
Airmen Training Institute at BAF Base Zahurul Haque in
Mahabub Rahman
Chittagong.
CA No. EINC/ 192 of 2017-2018 Mahabub Brothers Private
Construction of Parade Ground including ancillary works for Limited
5 Tk. 3,19,28,417.00
Establishment of Airmen Training Institute at BAF Base Managing Director: Sheikh
Zahurul Haque in Chittagong. Mahabub Rahman

CA No. EINC/ 193 of 2017-2018


Mahabub Brothers Private
Construction of Dormitory building (7 storey with 7 storied
Limited
6 foundation, Ground floor open), Dormitory-2 including Tk. 17,15,84,961.68
Managing Director: Sheikh
ancillary works for Establishment of Airmen Training
Mahabub Rahman
Institute at BAF Base Zahurul Haque in Chittagong.

CA No. EINC/ 194 of 2017-2018


Mahabub Brothers Private
Construction of Cafeteria (2 storey with 2 storied
Limited
7 foundation) including ancillary works for Establishment of Tk. 2,11,15,863.07
Managing Director: Sheikh
Airmen Training Institute at BAF Base Zahurul Haque in
Mahabub Rahman
Chittagong.

CA No. EINC/ 195 of 2017-2018


Mahabub Brothers Private
Construction of Gallery building (6 storey with 6 storied
Limited
8 foundation) including ancillary works for Establishment of Tk. 11,59,38,509.57
Managing Director: Sheikh
Airmen Training Institute at BAF Base Zahurul Haque in
Mahabub Rahman
Chittagong.

CA No. EINC/ 196 of 2017-2018


Mahabub Brothers Private
Construction of Common Facility building (2 storey with 2
Limited
9 storied foundation) including ancillary works for Tk. 10,27,57,378.69
Managing Director: Sheikh
Establishment of Airmen Training Institute at BAF Base
Mahabub Rahman
Zahurul Haque in Chittagong.
CA No. EINC/ 197 of 2017-2018
Mahabub Brothers Private
Construction of Dormitory building (7 storey with 7 storied
Limited
10 foundation, Ground floor open), Dormitory-1 including Tk. 17,14,40,421.68
Managing Director: Sheikh
ancillary works for Establishment of Airmen Training
Mahabub Rahman
Institute at BAF Base Zahurul Haque in Chittagong.

CA No. EINC/ 225 of 2017-2018


Mahabub Brothers Private
Construction of Academic building (6 storey with 6 storied
Limited
11 foundation) including ancillary works for Establishment of Tk. 78,00,65,734.66
Managing Director: Sheikh
Airmen Training Institute at BAF Base Zahurul Haque in
Mahabub Rahman
Chittagong.

TOTA
Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)
Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

Professional Professional
Associates Associates
1 0 1 1 0 1
Ltd (Arch Ltd (Arch
Monjur) Monjur)

TOTAL= 11 0 11 11 0 11
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)
Professional
Associates
1 0 1
Ltd (Arch
Monjur)

Professional
Associates
1 0 1
Ltd (Arch
Monjur)

11 0 11
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount

M/S. Razzaque
CA No. EINC/ 198 of 2017-2018
Construction & Co
Construction of 1 x 10 Married ORs’ Qtr (5 storey with 5
1 Prop: Md. Anwar Hossain Tk. 2,79,65,516.70
storied foundation) including ancillary works for Jhenaidah
(Razzaque)
Cadet College.
Index No. EinC/B-131 (Navy)

CA No. EINC/ 337 of 2017-2018 M/S. Nazmul Alam (Hatem)


Construction of 1 x 2 Class-III Staff Qtr (3rd Floor) over Prop: Md. Nazmul Alam
2 Tk. 40,04,483.43
existing 1 x 6 Qtr including ancillary works for Mymensingh (Hatem)Index No.DD-
Girls Cadet College. 427(Army)

CA No. EINC/ 378 of 2017-2018


M/S. Hasan Brothers
Construction of 1 x 2 1st Class employees Staff Qtr over
3 Prop: Sardar Mahmud Hasan Tk. 60,94,027.85
existing 1st Floor with 5 storied foundation including
Index No. DD-405 (Army)
ancillary works for Comilla Cadet College.

TOTA

Ser CA No & Name of Works Name of Contractor’s Firm CA Amount


CA No. EINC/ 147 of 2017-2018
M/S. Zoom Tec
Remaining works for Construction of Server Room and
Proprietor & CEO: Engr. Md.
1 Service Center (02 storey with 02 storied foundation) Tk. 24,81,564.00
Jahangir Kabir Tarafder
including ancillary works under Bangladesh Armed
Index No. SD-202 (Army)
Services Board (BASB) at Jamalpur.

CA No. EINC/ 371 of 2017-2018


M/S. S. M Construction
Construction of 1 x 2 Storied Office Building (2 storey with 2
2 Prop: Md.Hasibur Rahman Tk. 73,81,081.15
storied foundation) for DASB Chittagong including ancillary
Index No. C-909 (Army)
works under BASB at Ctg Cantt.

TOTA

Ser CA No & Name of Works Name of Contractor’s Firm CA Amount

CA No. EINC/ 260 of 2017-2018


M/S. Chengi Store
Construction of 1 x Tender building (4 storey with 4 storied
1 Prop: Abu Bakkar Siddique Tk. 1,22,33,386.00
foundation) including ancillary works for DGDP at Dhaka
Index No. GHA-1000 (Army)
Cantt.
Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining

Wks Dte 1 1 0 E6 Wks Dte 1 1 0

E6
Wks Dte 1 1 0 Wks Dte 1 1 0
10-09-18

Wks Dte 1 1 0 E6 Wks Dte 1 1 0

TOTAL= 3 3 0 3 3 0

Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining


Wks Dte 0 0 0 As built Wks Dte 0 0 0

Wks Dte 1 1 0 E6 Wks Dte 1 1 0

TOTAL= 1 1 0 1 1 0

Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining

Prolekh (Arch
1 1 0 E6 Wks Dte 1 1 0
Aman)
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks

E6 Wks Dte 1 1 0 E6

E6 E6
Wks Dte 1 1 0
10-09-18 10-09-18

E6 Wks Dte 1 1 0 E6

3 3 0

MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks
As built Wks Dte 0 0 0 As built

E6 Wks Dte 1 1 0 E6

1 1 0

MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks

Prolekh (Arch
E6 1 1 0 E6
Aman)
Ser CA No & Name of Works

CA No. EINC/ 137 of 2017-2018


1 Construction of Boundary wall including ancillary works
infront of Office building at DET DGFI Barisal.

CA No. EINC/ 150 of 2017-2018


2 Sand filling / Site development for low land area in front of
Office building at DET DGFI Barisal (Last Phase).

CA No. EINC/ 152 of 2017-2018


Construction of 4th floor as in Sainik line over existing
3
Office Bldg No. 494 (5 storied foundation) of DET DGFI
including ancillary works at Shaheed Salahuddin Cantt.

CA No. EINC/ 182 of 2017-2018


4 Construction of Boundary wall & Site development for DGFI
Office at Noakhali.

CA No. EINC/ 199 of 2017-2018


Construction of 1 x 6 ORs’ Qtr (3 storey with 5 storied
5 foundation) with internal/external services including
ancillary works at Robertsongonj area for DGFI Rangpur
Branch.

CA No. EINC/ 200 of 2017-2018


6 Construction of Earth filling & Boundary wall for Kushtia
DGFI Branch Office.

CA No. EINC/ 228 of 2017-2018


7 Site development and Construction of Boundary wall for DGFI
Branch Office at Pabna.
CA No. EINC/ 291 of 2017-2018
Construction of 1 x 10 ORs’ Qtr (5 storey with 5 storied
8
foundation) including ancillary works for Det DGFI at
Comilla Cantt.
Architectural Drawi
Name of Contractor’s Firm CA Amount
Consultants Total

M/S. Mohiuddin Enterprise


Prop: Mst. Moslema Wahab Tk. 23,99,124.27 Wks Dte 1
Index No. BD-284 (Army)

M/S. Mohiuddin Enterprise


Prop: Mst. Moslema Wahab Tk. 56,07,440.00 Wks Dte 0
Index No. BD-284 (Army)

M/S. Plumb Bangladesh


Prop: A. Rashid Miah Tk. 85,42,510.36 Wks Dte 1
Index No. C-355 (Army)

M/S. Shanta Enterprise


Prop: Md. Khokon Bhuiyan Tk. 4,30,24,796.83 Wks Dte 1
Index No. B-145 (Army)

M/S. Foresight
Developments
Prop: Maksud-Ul-Alam Tk. 1,74,75,374.55 Wks Dte 1
Chowdhury
Index No. C-618 (Air)

M/S. Tarafdar Enterprise


Prop: Md. Nurul Amin Tk. 1,04,16,554.32 Wks Dte 1
Index No. SD-140 (Army)

M/S. Sawa Enterprise


Proprietor: Major Md. Abdul
Tk. 88,83,076.75 Wks Dte 1
Wahab (Retd)
Index No: C-841 (Army)
M/S. General Construction
Prop: Abdus Sattar Tk. 2,82,33,443.76 Wks Dte 1
Index No. C-625 (Army)

TOTAL= 7
Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total

1 0 E6 Wks Dte 1

0 0 N/A Wks Dte 0

1 0 E6 Wks Dte 1

E6
1 0 Wks Dte 1
16-09-18

1 0 E6 Wks Dte 1

ASKED FOR PBQ


ON 10102018 BY
0 1 Wks Dte 1
E6, DRAWING IS
COMPLETE

E6
1 0 Wks Dte 1
24-09-18
1 0 E6 Wks Dte 1

6 1 7
Structural Drawing MEP Drawing

Completed Remaining Remarks Consultants Total Completed

1 0 E6 Wks Dte 0 0

0 0 N/A Wks Dte 0 0

1 0 E6 Wks Dte 1 1

E6
1 0 Wks Dte 0 0
16-09-18

1 0 E6 Wks Dte 1 1

ASKED FOR
PBQ ON
0 1 10102018 BY Wks Dte 1 0
E6, DRAWING
IS COMPLETE

E6
1 0 Wks Dte 0 0
24-09-18
1 0 E6 Wks Dte 1 1

6 1 4 3
MEP Drawing
Remarks
Remaining Remarks

0 N/A

0 N/A

0 E6

0 N/A

0 E6

1 /L

0 N/A
0 E6

1
Ser CA No & Name of Works

CA No. EINC/ 78 of 2017-2018


Repair/Maint of Wooden doors, Sheet glass mosquito proof
net, Plastic door with internal electric & sanitary
1
fitting/fixtures and internal decoration work etc under
Abnormal repair to Bldg No. 505 Officers Mess & 50 BOQ
for MIST at Mirpur Cantt.

CA No. EINC/ 82 of 2017-2018


Repair/Maint of Wooden doors, Thai Aluminium window,
Plaster, Aluminium curtain pipe with internal water, electric
2
& Sanitary fitting/fixtures and internal decoration work etc
under Abnormal repair to Bldg No. 14 (Ground, 1st, 2nd &
3rd floor) for MIST at Mirpur Cantt.

CA No. EINC/ 86 of 2017-2018


Repair/Maint of Wooden doors, Thai Aluminium window,
Plaster, Aluminium curtain pipe with internal water, electric
3
& Sanitary fitting/fixtures and internal decoration work etc
under Abnormal repair to Bldg No. 16 (Ground, 1st & 2nd
floor) for MIST at Mirpur Cantt.

CA No. EINC/ 116 of 2017-2018


Construction of 1 x MT Garage including ancillary work for
4
Expansion of Physical Facilities for Military Institute of
Science and Technology (MIST) at Mirpur Cantt.

CA No. EINC/ 158 of 2017-2018


Construction of 1 x Store room to back side of Bldg No. 14
5
and Road/Hardstanding, 2 x Garrage near of Bldg No. 14
& 16 for MIST at Mirpur Cantt.

CA No. EINC/ 286 of 2017-2018


Construction of 8th to 10th floor finishing work including
6 ancillary works over under Construction Building (14 storied
foundation) for Class-III Employees of MIST at Mirpur Cantt
(6th Phase)(Group-01).
CA No. EINC/ 287 of 2017-2018
Construction of 11th to 13th floor finishing work including
7 ancillary works over under Construction Building (14 storied
foundation) for Class-III Employees of MIST at Mirpur Cantt
(6th Phase) (Group-02).

Ser CA No & Name of Works

CA No. EINC/ 63 of 2017-2018


Construction of Dormitory Building with Basement floor
1
including ancillary works for 250 Candidate & Trainee
Officers of ISSB at Dhaka Cantt

CA No. EINC/ 149 of 2017-2018


Extension of existing Office Bldg No.41 (3 storey with 3
2
storied foundation) of ISSB including ancillary works at
Dhaka Cantt.
Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total

M/S. Shampa Construction


Prop: Md. Ayub Ali Tk. 58,03,751.23 Wks Dte 0
Index No. D-325 (Navy)

M/S. S. A Traders
Prop: KH. Sarowar Ali Tk. 37,67,432.73 Wks Dte 0
Index No.D-25 (Navy)

M/S. Tazmahal Traders


Prop: Md. Salim Tk. 29,82,356.33 Wks Dte 0
Index No. D-364 (Air)

M/S. Pivotal Way


Owner: Mohammad Fazlul
Tk. 1,38,96,817.85 Wks Dte 1
Karim
Index No. C-611 (Air)

M/S. Masud Traders


Prop: Md. Mahbub Alam
Tk. 39,48,361.73 Wks Dte 0
(Masud)
Index No. BD-298 (Army)

M/S. Taher Construction &


Co
Tk. 3,44,89,759.66 Wks Dte 1
Prop: Abu Taher Bhuiyan
Index No. EinC/B-133 (Army)
M/S. Tazmahal Traders
Prop: Md. Salim Tk. 4,28,45,298.27 Wks Dte 1
Index No. D-364 (Air)

TOTAL= 3

Architectural Drawing
Name of Contractor’s Firm CA Amount
Consultants Total

Professional
M/S. S. M Construction Associates
Tk. 26,32,00,149.31 1
Prop: Md.Hasibur Rahman Ltd ( Arch
Monjur)

M/S. Rania Traders


Prop: Md. Haron-Ur-Rashid
Tk. 1,07,81,865.29 Wks Dte 1
Sharker
Index No. DD-425 (Army)

TOTAL= 2
Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total Completed

0 0 As Built Wks Dte 0 0

0 0 As Built Wks Dte 0 0

0 0 As Built Wks Dte 0 0

0 1 Wks Dte 1 0

0 0 As Built Wks Dte 0 0

1 0 E6 Wks Dte 1 1
1 0 E6 Wks Dte 1 1

2 1 3 2

Architectural Drawing Structural Drawing

Completed Remaining Remarks Consultants Total Completed

Professional
Associates
1 0 E6 1 1
Ltd ( Arch
Monjur)

1 0 E6 Wks Dte 1 1

2 0 2 2
ural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed Remaining

0 As Built Wks Dte 0 0 0

0 As Built Wks Dte 0 0 0

0 As Built Wks Dte 0 0 0

1 Wks Dte 1 0 1

0 As Built Wks Dte 0 0 0

0 E6 Wks Dte 1 1 0
0 E6 Wks Dte 1 1 0

1 3 2 1

ural Drawing MEP Drawing

Remaining Remarks Consultants Total Completed Remaining

Professional
Associates
0 E6 1 0 1
Ltd ( Arch
Monjur)

0 E6 Wks Dte 1 1 0

0 2 1 1
Remarks
Remarks

As Built

As Built

As Built

As Built

E6
E6

Remarks
Remarks

E6
Ser CA No & Name of Works Name of Contractor’s Firm CA Amount

CA No. EINC/ 151 of 2017-2018


Taher Brothers Limited
Construction of 1 x Academic building (06 storey with 10
Managing Director:
1 storied foundation) including ancillary works for Mujib Tk.76,65,17,428.09
M. A. Bashar
Battery Complex at Artillery Centre & School Halishahar,
Index No: EinC/A-44 (Air)
Chittagong.

CA No. EINC/ 153 of 2017-2018


Taher Brothers Limited
Construction of 1 x Auditorium (02 storey with 02 storied
Managing Director:
2 foundation) including ancillary works for Mujib Battery Tk. 6,60,17,121.68
M. A. Bashar
Complex at Artillery Centre & School Halishahar,
Index No: EinC/A-44 (Air)
Chittagong.

CA No. EINC/ 155 of 2017-2018


Taher Brothers Limited
Construction of 1 x Dining hall (02 storey with 02 storied
Managing Director:
3 foundation) including ancillary works for Mujib Battery Tk. 9,89,89,067.59
M. A. Bashar
Complex at Artillery Centre & School Halishahar,
Index No: EinC/A-44 (Air)
Chittagong.

CA No. EINC/ 157 of 2017-2018


Taher Brothers Limited
Construction of 1 x Academic Sadar (04 storey with 06
Managing Director:
4 storied foundation) including ancillary works for Mujib Tk.20,64,69,037.72
M. A. Bashar
Battery Complex at Artillery Centre & School Halishahar,
Index No: EinC/A-44 (Air)
Chittagong.
CA No. EINC/ 159 of 2017-2018
Taher Brothers Limited
Construction of 1 x Student Officers' Accommodation (03
Managing Director:
5 storey with 10 storied foundation) including ancillary works Tk.17,44,00,732.49
M. A. Bashar
for Mujib Battery Complex at Artillery Centre & School
Index No: EinC/A-44 (Air)
Halishahar, Chittagong.

TOTA
Architectural Drawing Structural Drawing

Consultants Total Completed Remaining Remarks Consultants Total Completed Remaining

A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)

A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)

A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)

A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)
A+Aa A+Aa
Consultants Consultants
1 0 1 1 0 1
(Arch Bikash (Arch Bikash
Ansary) Ansary)

TOTAL= 5 0 5 5 0 5
MEP Drawing
Remarks
Remarks Consultants Total Completed Remaining Remarks

A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)

A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)

A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)

A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)
A+Aa
Consultants
1 0 1
(Arch Bikash
Ansary)

5 0 5