Professional Documents
Culture Documents
Rabigh Ii Project Interconecting Package (Uo1) : Hydrostatic Test Pressure Record Sheet
Rabigh Ii Project Interconecting Package (Uo1) : Hydrostatic Test Pressure Record Sheet
DATE:
TEST PRESSURE
HOLDING TIME : 4 HOURS
100% of TP
De
pr
es
(Inspection-
urs
70% of TP 15 mints)
iza
tio
n
(Inspection-
50% of TP 15 mints)
STARTING TIME :
ENDING TIME :
Test Summary
Test Pkg No. TP-UOI-C230-FW-0019 REMARKS
Line No. 18"-FW-C230-0117-12FEOW16-NI
Designed Pressure: 16.7 kgf / cm²g
Test Pressure: 25.05 kgf / cm²g (357 Psi )
Test Holding Time 4 Hours