1. First staff is sited on the Benchmark (BM) having RL 123.67 m (Chainage 0.00
m). The level points are then sited at intervals of 20 m each.
3. The instrument is then shifted to the next point and temporarily adjusted but
staff noted as foresight from the previous reading is not shifted and the reading
is recorded as back sight. Step (2) is the repeated.
4. Steps (2) and (3) are repeated until the chainage point is at 140.00 m from the
BM.