GENERAL ASSUMPTIONS

MATERIAL PROPERTIES

OVERBURDEN
INSITU DENSITY
FUEL OIL ( SOLAR )
DENSITY

BENCH PROPERTIES

SINGLE SLOPE
HEIGHT
ANGLE
OVERALL SLOPE
HEIGHT
ANGLE

WORKING HOUR

MUSIM HUJAN
OKTOBER-APRIL
MUSIM KEMARAU
MEI-SEPTEMBER
Jumlah Hari/Bulan
Hari Libur Resmi
Hari Efektif/Bulan
Shift/Hari
Durasi/shift
Durasi efektif/bulan
Hari Peledakan/tahun

BLASTING PROPERTIES (ANFO)

NAME SYMBOL
SPACING S
DEPTH OF DRILLHOLE H
STEMMING T
SUBDRILL J
BURDEN B
KS S/B
KH H/B
KT T/B
KJ J/B
POWDER FACTOR KG/BCM
S = SPACING
H = DEPTH OF DRILLHOLE
T = STEMMING
J = SUBDRILL
B = BURDEN

95% AN + 5 % FO ( ZERO OXYGEN BALANCE )

SG = 0.82

VOD = 3500 M/S


PTIONS

(tonnes/bcm) 2.5

(kg/l) 0.85

(m) 10
(degree) 65

(m) 80
(degree) 45

(month) 7

(month) 5
30
4
26
1
10
260
130

$ 1 = Rp. 10000
METER
7
11.5
5
1.5
5
1.4
2.3
1
0.3
0.42

)
COAL PRODUCTION

TAHUN SR Batubara ( juta ton )


1 0.20 0.5
2 0.17 1
3 0.17 2
4 0.14 3
5 0.14 3.5
6 0.13 2
7 0.11 2
8 0.11 1
TOTAL 15

BLASTING MATERIAL

25 % OB YANG PERLU DILEDAKAN

TAHUN Overburden ( juta bcm ) Blasting Material ( juta bcm )


1 2.5 0.625
2 6 1.5
3 12 3
4 21 5.25
5 24.5 6.125
6 16 4
7 18 4.5
8 9 2.25
TOTAL 109 27.25
UCTION

Overburden ( juta bcm )


2.5
6
12
21
24.5
16
18
9
109

ATERIAL
POLA PELEDAKAN

BILA POLA PELEDAKAN 10 BARIS-10 KOLOM

Kolom 1 2 3 4 5 6
Baris
1 25 50 75 100 125 150
2 201 226 251 276 301 326
3 377 402 427 452 477 502
4 553 578 603 628 653 678
5 729 754 779 804 829 854
6 905 930 955 980 1005 1030
7 1081 1106 1131 1156 1181 1206
8 1257 1282 1307 1332 1357 1382
9 1433 1458 1483 1508 1533 1558
10 1609 1634 1659 1684 1709 1734
HANYA 2 LUBANG TEMBAK YANG MELEDAK BERSAMAAN
7 8 9 10

175 200 225 250


351 376 401 426
527 552 577 602
703 728 753 778
879 904 929 954
1055 1080 1105 1130
1231 1256 1281 1306
1407 1432 1457 1482
1583 1608 1633 1658
1759 1784 1809 1834
BERSAMAAN
BLASTING OPERATIONAL

POWDER FACTOR = 0.53

NUMBER OF HOLE
Unit YEAR 1 YEAR 2 YEAR 3
Blasting Material bcm 625000 1500000 3000000
Burden m 5 5 5
Spacing m 7.5 7 7
Bench heigth m 10 10 10
Subdrill m 1.5 1.5 1.5
Hole Depth m 10 10 10
Number of hole m 16667 42857 85714
Year 1667 4286 8571
Month 139 357 714
Month (kemarau) 333 857 1714
Day 5 14 27
Day (kemarau) 13 33 66
108 per 9 hari 116 per 4 hari 114 per 2 hari
SCHEDULE (kemarau) (kemarau) (kemarau)

Blasting Equipment
Item Requirement Unit YEAR 1 YEAR 2 YEAR 3
Booster piece 1667 4286 8571
ANFO kg 331250 795000 1590000
Inhole line piece 1667 4286 8571
Nonel line m 29167 75000 150000
7.5

Item Requirement Unit YEAR 1 YEAR 2 YEAR 3


Booster piece 1667 4286 8571
ANFO kg 331250 795000 1590000
Inhole line piece 1667 4286 8571
Nonel line m 29167 75000 150000

Item Requirement Unit YEAR 1 YEAR 2 YEAR 3


Booster piece 333 857 1714
ANFO kg 66250 159000 318000
Inhole line piece 333 857 1714
Nonel line m 5833 15000 30000

Item Requirement Unit YEAR 1 YEAR 2 YEAR 3


Booster piece 13 33 66
ANFO kg 2208 5300 10600
Inhole line piece 13 33 66
Nonel line m 224 577 1154

Blasting Cost
Cost USD YEAR 1 YEAR 2 YEAR 3
Booster 5/pc 8,333.33 21,428.57 42,857.14
ANFO
AN 600/kg 188,812.50 453,150.00 906,300.00
FO 0.5/l 9,742.65 23,382.35 46,764.71
Inhole line 5.5/pc 9,166.67 23,571.43 47,142.86
Nonel line 0.5/m 14,583.33 37,500.00 75,000.00
TOTAL 230638.480392157 559032.352941177 1118064.70588235

Cost USD YEAR 1( per 6 month


YEAR) 2 ( per 6 month
YEAR
) 3 ( per 6 month )
Booster 5/pc 8,333.33 21,428.57 42,857.14
ANFO
AN 600/kg 188,812.50 453,150.00 906,300.00
FO 0.5/l 9,742.65 23,382.35 46,764.71
Inhole line 5.5/pc 9,166.67 23,571.43 47,142.86
Nonel line 0.5/m 14,583.33 37,500.00 75,000.00
TOTAL 230638.480392157 559032.352941177 1118064.70588235

Cost USD YEAR 1 YEAR 2 YEAR 3


Booster 5/pc 1,666.67 4,285.71 8,571.43
ANFO
AN 600/kg 37,762.50 90,630.00 181,260.00
FO 0.5/l 1,948.53 4,676.47 9,352.94
Inhole line 5.5/pc 1,833.33 4,714.29 9,428.57
Nonel line 0.5/m 2,916.67 7,500.00 15,000.00
TOTAL 46127.6960784314 111806.470588235 223612.941176471

Cost USD YEAR 1 YEAR 2 YEAR 3


Booster 5/pc 64.10 164.84 329.67
ANFO
AN 600/kg 1,258.75 3,021.00 6,042.00
FO 0.5/l 64.95 155.88 311.76
Inhole line 5.5/pc 70.51 181.32 362.64
Nonel line 0.5/m 112.18 288.46 576.92
TOTAL 1570.495852187 3811.4977375566 7622.9954751131
L

YEAR 4 YEAR 5 YEAR 6 YEAR 7


5250000 6125000 4000000 4500000
5 5 5 5
7 7 7 7
10 10 10 10
1.5 1.5 1.5 1.5
10 10 10 10
150000 175000 114286 128571
15000 17500 11429 12857
1250 1458 952 1071
3000 3500 2286 2571
48 56 37 41
115 135 88 99
100 per hari 117 per hari 76 per hari 86 per hari
(kemarau) (kemarau) (kemarau) (kemarau)

YEAR 4 YEAR 5 YEAR 6 YEAR 7


15000 17500 11429 12857
2782500 3246250 2120000 2385000
15000 17500 11429 12857
262500 306250 200000 225000

YEAR 4 YEAR 5 YEAR 6 YEAR 7


15000 17500 11429 12857
2782500 3246250 2120000 2385000
15000 17500 11429 12857
262500 306250 200000 225000

YEAR 4 YEAR 5 YEAR 6 YEAR 7


3000 3500 2286 2571
556500 649250 424000 477000
3000 3500 2286 2571
52500 61250 40000 45000

YEAR 4 YEAR 5 YEAR 6 YEAR 7


115 135 88 99
18550 21642 14133 15900
115 135 88 99
2019 2356 1538 1731

YEAR 4 YEAR 5 YEAR 6 YEAR 7


75,000.00 87,500.00 57,142.86 64,285.71

1,586,025.00 1,850,362.50 1,208,400.00 1,359,450.00


81,838.24 95,477.94 62,352.94 70,147.06
82,500.00 96,250.00 62,857.14 70,714.29
131,250.00 153,125.00 100,000.00 112,500.00
1956613.23529412 2282715.44117647 1490752.94117647 1677097.05882353

Jumlah Total

YEAR 4 (per 6 month )YEAR 5 ( per 6 monthYEAR


) 6 ( per 6 monthYEAR
) 7 ( per 6 month
75,000.00 87,500.00 57,142.86 64,285.71

1,586,025.00 1,850,362.50 1,208,400.00 1,359,450.00


81,838.24 95,477.94 62,352.94 70,147.06
82,500.00 96,250.00 62,857.14 70,714.29
131,250.00 153,125.00 100,000.00 112,500.00
1956613.23529412 2282715.44117647 1490752.94117647 1677097.05882353

YEAR 4 YEAR 5 YEAR 6 YEAR 7


15,000.00 17,500.00 11,428.57 12,857.14

317,205.00 370,072.50 241,680.00 271,890.00


16,367.65 19,095.59 12,470.59 14,029.41
16,500.00 19,250.00 12,571.43 14,142.86
26,250.00 30,625.00 20,000.00 22,500.00
391322.647058824 456543.088235294 298150.588235294 335419.411764706

Jumlah Total

YEAR 4 YEAR 5 YEAR 6 YEAR 7


576.92 673.08 439.56 494.51

10,573.50 12,335.75 8,056.00 9,063.00


545.59 636.52 415.69 467.65
634.62 740.38 483.52 543.96
1,009.62 1,177.88 769.23 865.38
13340.242081448 15563.6157616893 10163.9939668175 11434.4932126697

Jumlah Total

BLASTING COST PER BCM BLASTING MATERIAL = $ 7.612.671.757,86


YEAR 8
2250000
5
7
10
1.5
10
64286
6429
536
1286
21
49
86 per 2 hari
(kemarau)

YEAR 8
6429
1192500
6429
112500

YEAR 8
6429
1192500
6429
112500

YEAR 8
1286
238500
1286
22500

YEAR 8
49
7950
49
865

YEAR 8
32,142.86

679,725.00
35,073.53
35,357.14
56,250.00
838548.529411765

Jumlah Total $10,153,462.75 0.3726 3278.9164

10153462.745098

YEAR 8 ( per 6 month )


32,142.86

679,725.00
35,073.53
35,357.14
56,250.00
838548.529411765

$10,153,462.75
Rp101,534,627,450.98

YEAR 8
6,428.57

135,945.00
7,014.71
7,071.43
11,250.00
167709.705882353

Jumlah Total $2,030,692.55


Rp20,306,925,490.20

YEAR 8
247.25

4,531.50
233.82
271.98
432.69
5717.2466063349

Jumlah Total $69,224.58


Rp692,245,806.94

TERIAL = $ 7.612.671.757,86 / 27250000 BCM$0.37


=
Rp3,726.04
Tahun 1 Tahun 2
Blasting Material 625000 1500000
Volume peledakan per lubang tembak 375 375
Jumlah lubang tembak/tahun 1667 4000
Jumlah lubang tembak/bulan kemarau 333 800
Jumlah lubang tembak/hari kemarau 13 31
Jumlah hari peledakan jika dalam 1 hari diledakkan krg lebih 100 lubang tembak 8 3
Jumlah lubang tembak jika dalam 1 hari diledakkan krg lebih 100 lubang tembak 103 92
Jumlah lubang tembak 103/8 hari 92/3 hari

Tahun 1 Tahun 2
Jumlah hari peledakan jika dalam 1 hari diledakkan krg lebih 100 lubang tembak 8 3
Jumlah lubang tembak jika dalam 1 hari diledakkan krg lebih 100 lubang tembak 103 92
Jumlah lubang tembak 103/8 hari 92/3 hari

per tahun & 6 bulan


Item Tahun 1 Tahun 2
Booster (piece) 1667 4000
ANFO(kg) 331250 795000
Inhole line(piece) 1667 4000
Nonel line(m) 20826 49993
per bulan
Item Tahun 1 Tahun 2
Booster (piece) 333 800
ANFO(kg) 66250 159000
Inhole line(piece) 333 800
Nonel line(m) 4165 9999
per hari
Item Tahun 1 Tahun 2
Booster (piece) 14 33
ANFO(kg) 2760 6625
Inhole line(piece) 14 33
Nonel line(m) 174 417
per tahun & 6 bulan
Cost Harga(USD) Tahun 1
Booster 5/pc $8,333
ANFO
AN 600/Ton $187,819
FO 0.5/l $9,109
Inhole line 5.5/pc $9,167
Nonel line 0.5/m $10,413
TOTAL $224,841

per bulan
Cost Harga(USD) Tahun 1
Booster 5/pc $1,667
ANFO
AN 600/Ton $37,564
FO 0.5/l $1,822
Inhole line 5.5/pc $1,833
Nonel line 0.5/m $2,083
TOTAL $44,968

per hari
Cost Harga(USD) Tahun 1
Booster 5/pc $69
ANFO
AN 600/Ton $1,565
FO 0.5/l $76
Inhole line 5.5/pc $76
Nonel line 0.5/m $87
TOTAL $1,874
Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8
3000000 5250000 6125000 4000000 4500000 2250000 27250000
375 375 375 375 375 375
8000 14000 16333 10667 12000 6000
1600 2800 3267 2133 2400 1200
62 108 126 82 92 46
2 1 1 1 1 2
123 108 126 82 92 92
123/2 hari 108/hari 126 / hari 82 / hari 92 / hari 92/ 2 hari

Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


2 1 1 1 1 2
123 108 126 82 92 92
123/2 hari 108/hari 126 / hari 82 / hari 92 / hari 92/ 2 hari

Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


8000 14000 16333 10667 12000 6000
1590000 2782500 3246250 2120000 2385000 1192500 AN (kg)
8000 14000 16333 10667 12000 6000 FO (l)
99993 174993 204159 133326 149993 74993

Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


1600 2800 3267 2133 2400 1200
318000 556500 649250 424000 477000 238500 AN (kg)
1600 2800 3267 2133 2400 1200 FO (l)
19999 34999 40832 26665 29999 14999

Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


67 117 136 89 100 50
13250 23188 27052 17667 19875 9938 AN (kg)
67 117 136 89 100 50 FO (l)
833 1458 1701 1111 1250 625

Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


$20,000 $40,000 $70,000 $81,667 $53,333 $60,000 $30,000

$450,765 $901,530 $1,577,678 $1,840,624 $1,202,040 $1,352,295 $676,148


$21,863 $43,725 $76,519 $89,272 $58,300 $65,588 $32,794
$22,000 $44,000 $77,000 $89,833 $58,667 $66,000 $33,000
$24,996 $49,996 $87,496 $102,080 $66,663 $74,996 $37,496
$539,624 $1,079,251 $1,888,693 $2,203,475 $1,439,003 $1,618,879 $809,438

Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


$4,000 $8,000 $14,000 $16,333 $10,667 $12,000 $6,000

$90,153 $180,306 $315,536 $368,125 $240,408 $270,459 $135,230


$4,373 $8,745 $15,304 $17,854 $11,660 $13,118 $6,559
$4,400 $8,800 $15,400 $17,967 $11,733 $13,200 $6,600
$4,999 $9,999 $17,499 $20,416 $13,333 $14,999 $7,499
$107,925 $215,850 $377,739 $440,695 $287,801 $323,776 $161,888

Tahun 2 Tahun 3 Tahun 4 Tahun 5 Tahun 6 Tahun 7 Tahun 8


$167 $333 $583 $681 $444 $500 $250

$3,756 $7,513 $13,147 $15,339 $10,017 $11,269 $5,635


$182 $364 $638 $744 $486 $547 $273
$183 $367 $642 $749 $489 $550 $275
$208 $417 $729 $851 $556 $625 $312
$4,497 $8,994 $15,739 $18,362 $11,992 $13,491 $6,745
S 7.5
T 5
313031 751275 1502550 2629463 3067706 2003400 2253825 1126913
18219 43725 87450 153038 178544 116600 131175 65588

62606 150255 300510 525893 613541 400680 450765 225383


3644 8745 17490 30608 35709 23320 26235 13118
66250

2609 6261 12521 21912 25564 16695 18782 9391


152 364 729 1275 1488 972 1093 547

$9,803,203 $0.36
$1,960,641