1.

Junction box support of ESDV actuator NPO-310-ESDV-0102 damaged


2. Painting of Insulating joint highly damaged
3. Wrong Orientation of sliding plate Pig receiver
4. Pipe support not yet installed
5. Several nozzles not protected
6. Gasket not installed

Gap between pipe and support SL 01

Gap between pipe and support SL 04

Position of 2 Sliding Plate under pig launcher to be adjusted

Dear all,

Be informed that the Line N 2-OD-310-065-01CA3S-V still (condensate pig receiver) without

continuity, it is separated from the other line.

The continuity adequate of this line not designed in the isometric sheet 21/22

BR