CTCI CHIYODA SYNERLITZ MIE (CCSM)

Construction Check Sheet


INSTRUMENT JUNCTION BOX INSTALLATION
Instrument I07-A
ITEM/TAG NO. 1312-JEI-7103 RECORD NO. A134348
SYSTEM: DCS, IS, TERMINAL QTY: 6, TERMINAL MARK: T6, NON-CERAMIC TERMINAL,
EQUIPMENT DESCRIPTION
INLET QTY: 2, INLET SIZE: M20, OUTLET QTY: 1, OUTLET SIZE: M20
SUB-SYSTEM NO. 1312-U-12-02
SUB-SYSTEM
DESCRIPTION
LP NITROGEN DISTRIBUTION FOR UTILITY STATION
LOCATION SYSTEM 1312-U-12
PROJECT TITLE PETRONAS RAPID PROJECT, PENGERANG PROJECT NO. 14A1758A
DRAWING REFERENCE DATE PRINTED 2018-06-06
INFORMATION
CERTIFYING AUTHORITY MANUFACTURER
EX PROTECTION MODEL NO.
IP RATING

INSTALLATION CHECK OK N/A PL NO


1 Verify to ensure that all construction / installation activities have been completed
Check accessibility of junction box in order to ensure that ergonomically comfortable
2
for any maintenance work
3 Verify JB is installed securely and correctly as per equipment layout drawing
4 Inspect junction box for mechanical damage tagging, and attachment to supports
5 Verify tag plate identification correct, and 'Ex' rating clearly identified
6 Verify JB is suitable for the area classification, confirm IP rating as per datasheet
Verify all fitted equipment compliance to Ex certificate,
7
(Note: For Ex-rated junction boxes only)
Check whether JB is provided with terminals as per the approved JB or terminal
8
drawing
9 Check that all wires are terminated as per termination drawing
10 Verify that all screen wires are insulated and terminatedas per termination drawing
Inspect flange surfaces and apply copper grease compound to flange surfaces (if
11
applicable)
12 Inspect glands and ensure that all glands are properly installed
13 Inspect spare gland entries are plugged with certified plug
14 Inspect seals on the JB door are fitted correctly.
15 Verify JB internals are free of dust and debris
16 Check earthing of junction box as per termination drawing
17 Verify no dust inside Enclosure /Cabinet / Panel and insulation surfaces are clean.
18 Verify Instruments & its Accessories /Electrical equipment/Panel externally clean.

REFERENCE DRAWINGS
1 JB Installation Drawing
2 Typical Installation Drawing
3 Termination Drawing
COMMENT(S) OR ADDITIONAL INFORMATION:

Rev2 November 30, 2017 *P1/2*


*$1312-JEI-7103/I07-A*

CTCI CHIYODA SYNERLITZ MIE (CCSM)

Construction Check Sheet


INSTRUMENT JUNCTION BOX INSTALLATION
Instrument I07-A
ITEM/TAG NO. 1312-JEI-7103 RECORD NO. A134348
SYSTEM: DCS, IS, TERMINAL QTY: 6, TERMINAL MARK: T6, NON-CERAMIC TERMINAL,
EQUIPMENT DESCRIPTION
INLET QTY: 2, INLET SIZE: M20, OUTLET QTY: 1, OUTLET SIZE: M20
SUB-SYSTEM NO. 1312-U-12-02
SUB-SYSTEM
DESCRIPTION
LP NITROGEN DISTRIBUTION FOR UTILITY STATION
LOCATION SYSTEM 1312-U-12
PROJECT TITLE PETRONAS RAPID PROJECT, PENGERANG PROJECT NO. 14A1758A
DRAWING REFERENCE DATE PRINTED 2018-06-06
INFORMATION
CERTIFYING AUTHORITY MANUFACTURER
EX PROTECTION MODEL NO.
IP RATING

Inspected By Inspected By Approved By


Designation QAQC QAQC Inspector QAQC Engineer
Company CCSM PMT PMT
Name

Signature

Date

Rev2 November 30, 2017 *P2/2*