Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Rating Scale/Scheme

Components Success Indicators (SI)


Quantity Quality Timeliness
1. Reading Profile  Record of Learners’ Categorized 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
Reading Level (Pupils/Students) 2 – 2 SI Complete, 2 – Satisfactorily before schedule
 Consolidated Class Graphical lacking 1 Done 2- Done on
Data 1 – only 1 SI met 1 – Haphazardly Done Schedule
 Copy of the Reading Assessment 0 - Non 0 – None 1 – a week after
Tool/s the schedule
0 – None

2. Intervention > Action Plan /Intervention Plan (by 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
Plan/Enhancement the Teacher) with Matrix to be 2 – 2 SI Complete, 2 – Satisfactorily before schedule
approved by the SH lacking 1 Done 2- Done on
*For consolidation of the SH as basis 1 – only 1 SI met 1 – Haphazardly Done Schedule
for the Activity Design 0 - Non 0 – None 1 – a week after
> Minutes, Attendance Sheet, Pictorial the schedule
*Meetings conducted with the parents, 0 – None
stakeholders & the like about the
Reading Program/Results of the
Reading Profile
3. Availability & Suitability of  Reading Corner with 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
Materials Developmentally-Appropriate 2 – 2 SI Complete, 2 – Satisfactorily before schedule
Reading Materials categorized lacking 1 Done 2- Done on
according to Reading Level 1 – only 1 SI met 1 – Haphazardly Done Schedule
 Borrower’s Card 0 - Non 0 – None 1 – a week after
the schedule
0 – None
4. Full Implementation of  Individualized Tracking 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
the Reading Intervention System/Progress 2 – 2 SI Complete, 2 – Satisfactorily before schedule
Plan  Activity Log lacking 1 Done 2- Done on
 Pictorials with Captions/other Schedule
MOVs 1 – only 1 SI met 1 – Haphazardly Done 1 – a week after
* Reading Month Activity 0 - Non 0 – None the schedule
*Accomplishment Report – Classroom- 0 – None
Based
*Participation to School Level, District
Level, Division Level, etc.
5. Learners’ Portfolio  Portfolio 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
Attachments: 2 – 2 SI Complete, 2 – Satisfactorily before schedule
- Individual Assessment Result (Pre lacking 1 Done 2- Done on
& Post) with Recommendation 1 – only 1 SI met 1 – Haphazardly Done Schedule
- Individual Learner’s Activity 0 - Non 0 – None 1 – a week after
Output the schedule
0 – None

6. Progress/Status  Comparative Data (Pre vs. Post) 3 – All SI complete 3 – Exemplarily Done 3- Promptly Done
(Final Assessment)  Graphical Result 2 – 2 SI Complete, 2 – Satisfactorily before schedule
lacking 1 Done 2- Done on
1 – only 1 SI met 1 – Haphazardly Done Schedule
0 - Non 0 – None 1 – a week after
the schedule
0 – None

You might also like