PROJECT: LANDMARK MACAPAGAL PROJECT

DATE: OCTOBER 21, 2018


SUBJECT: HAULOUT OF CUT PILES

QTY QTY FABRICATION STATUS DELIVERY STATUS


ITEM DESCRIPTION
THIS THIS
pcs. pos. PREV. PERIOD TO DATE PREV. PERIOD TO DATE
PHASE 1
15M 25 0 25
TEST BOTTOM 25
A. 25
PILES
25M TOP 5 0 5
25

B. REGULAR PILE 1780 1361

1 11M SINGLE 411 411


2 10M SINGLE 165 165
3 8M SINGLE 21 21
4 6M SINGLE 48 48
10M bot. 254
5&8 DOUBLE 254
12M top 254
9M bot. 123
6 DOUBLE 123
10M top 123
7 9M SINGLE 97 97
9 14M SINGLE 12 12
10M bot. 42
10 DOUBLE 42
10M top 42
11 FOR CMGI S.I. 188 188
DRIVING STATUS CUTTING STATUS FOLLOWER STATUS (pos) FOLLOWER STATUS (pos)

THIS THIS THIS THIS


PREV. PERIOD TO DATE PREV. PERIOD TO DATE PREV. PERIOD TO DATE PREV. PERIOD

296
135
LOWER STATUS (pos) HAULOUT OF CUT PILES HAULOUT OF CUT PILES

THIS THIS
TO DATE PREV. PERIOD TO DATE PREV. PERIOD TO DATE
PROJECT: LANDMARK MACAPAGAL PROJECT
DATE: OCTOBER 21, 2018
SUBJECT: HAULOUT OF CUT PILES

QTY QTY FABRICATION STATUS DELIVERY STATUS


ITEM DESCRIPTION
THIS THIS
pcs. pos. PREV. PERIOD TO DATE PREV. PERIOD TO DATE
PHASE 1
15M 25 0 25
TEST BOTTOM 25
A. 25
PILES
25M TOP 5 0 5
25

B. REGULAR PILE 1780 1361

1 11M SINGLE 411 411


2 10M SINGLE 165 165
3 8M SINGLE 21 21
4 6M SINGLE 48 48
10M bot. 254
5&8 DOUBLE 254
12M top 254
9M bot. 123
6 DOUBLE 123
10M top 123
7 9M SINGLE 97 97
9 14M SINGLE 12 12
10M bot. 42
10 DOUBLE 42
10M top 42
11 FOR CMGI S.I. 188 188
DRIVING STATUS CUTTING STATUS FOLLOWER STATUS (pos) FOLLOWER STATUS (pos)

THIS THIS THIS THIS


PREV. PERIOD TO DATE PREV. PERIOD TO DATE PREV. PERIOD TO DATE PREV. PERIOD
LOWER STATUS (pos) HAULOUT OF CUT PILES HAULOUT OF CUT PILES

THIS THIS
TO DATE PREV. PERIOD TO DATE PREV. PERIOD TO DATE