Dear Friends

I want to know the Relation between Tender Program and Base Line program.

Regards

Arun.V

2.

Thank you sir

Right now I am working in a Microtunneling project.In the Tender stage with limited information we
submited one Tender program with a sequence and duration,we got the work also.

Once the work awarded Client changed the sequence and duartion with current situation with the joint
meeting of We Maincontactor and the tunneling contractor.

Nw My Q.S is saying that we have to submit a Base program with Tender sequence and Duration which is not
going to happend.
What I have to do ???/Please help

3.

Arun,

There is no specific rules for such.

4.

Thank you Raymond

Is there any Mandatory rule that we have to follow the same duration and sequence

of Tender program in the Base line program????

Regards

Arun Vasanth

5.

Arun,

Tender Program = Preliminary Master Schedule attached with the Tender Docs. This part of the Tender Doc
will present how you will plan to execute the Tender Project.
Baseline Program = Initial Schedule accepted or approved by client in the beginning of the implementation of
Project. This detailed schedule will present how to execute the project on hand.
Tempoh Dokumen yang
Bil Aktiviti PIC Cth
Masa diperlukan

Pegawai
Langkah
1 Kelulusan Kertas BOM Kertas cadangan Program
pertama
(PP)

Memberikan spesifikasi Spesifikasi


2 Serta-merta PP
kepada pembekal lengkap

Memastikan perolehan Serta-merta


yang diperlukan adalah sebelum Sijil MOF
3 PP Klik
berdaftar dengan kod proses berdaftar
bidang MOF perolehan

Memberikan senarai
sekurang-kurangnya 5
pembekal berdaftar kod
4 1-2 hari Senarai pembekal PP
MOF yang sah dan boleh
dihubungi secara
emel/telefon

Pengiklanan

i. Suratkhabar i) PCT
5 1-2 hari Iklan Klik
ii) MIT
(sebutharga & isi RO)
ii. Laman Web MPC

Penyediaan dokumen Dokumen tender


6 1-2 hari PCT
tender lengkap
Briefing kepada
pembekal

i. Tempah Bilik
i-iii: PCT
7 ii. Tempah F&B 1 hari Dokumen tender iv: FIN
iii. Maklum kpd v: PP

reception
iv. Penerimaan bayaran
v. Penyediaan slaid

8 Tempoh pelawaan tender >21 hari – PCT

J/K
Pengesahan dokumen Pengesahan
9 2-3 hari Pembuka
tender dokumen tender
peti tender

J/K
Dokumen tender
10 2-4 hari Dokumen tender Pembuka
diserahkan kepada PP
peti tender

11 Pelantikan JPT (jika perlu) 1-2 hari Surat lantik JPT PCT

i. Untuk LPH
Penyediaan laporan: (integrity pact,
i. Laporan Penilaian i. JPH
senarai Klik
Harga (LPH)
12 ii. Laporan Penilaian 7-14 hari kehadiran, minit
ii. JPT
Teknikal (LPT) mesyuarat JPH) Klik
iii. Laporan Penilaian iii. PCT
Sebutharga (LPS) ii. LPT
iii. LPS
Persediaan Sebelum
Mesyuarat Lembaga
Perolehan B (LPB)
i. Menempah masa i. Surat
13 ahli-ahli mesyuarat 2-3 hari PCT
(KP,TKPs, BOD, MITI) jemputan
ii. Surat jemputan
iii. Tempahan Bilik
iv. Tempahan F&B

Persediaan Semasa
Mesyuarat Lembaga
Perolehan B (LPB)
i. Senarai
Kehadiran
14 ii. Integrity Pact 1 hari -sama- PCT
(Sebelum & Selepas)
iii. Minit Mesyuarat
iv. Draf Kertas
Keputusan
v. LPH/LPT/LPS

Selepas Mesyuarat LPB


i. Minit mesyuarat
<3hari
15 1-2 hari -sama- PCT
ii. Pembayaran
elaun kepada ahli BOD
iii. SST

i) Draf dihantar
ke SU melalui PCT
ii) Semakan SU i) PCT
iii) Pengesahan SU ii) SU
Sebelum dan KP iii) SU
16 Kontrak (jika perlu)
program iv) Tandatangan iv) PE
pembekal v) PE
v) Mati setem vi) PCT
vi) Pendaftaran
kontrak
Dalam masa
Bon Pelaksanaan (jika 4 bulan
17 PE
perlu) selepas
tarikh SST

Sekurang-
kurangnya 14
18 Penghantaran RO hari sebelum PP
tarikh
program

Item in Tender
Example Corp: SME Corparation
1. Senarai Semak ( Bekalan /Perkidmatan
/Kerja)
2. Tawaran Harga
3. Iklan Notis Sebutharga
4. Lampiran
5. Spesifikasi Teknikal
6. SME CORP. MALAYSIA -Map
7. Tentative Programme TCTP 2018
8. Tajuk Tender
9. Nama Syarikat Yang Berjaya
10. Nilai Kontrak (Termasuk 6% GST)
11. Tempoh Kontrak/ Siap