This document outlines a time schedule for assessing the Lotte Mart building from October to November 2018. It details the assessment work to be completed on the ground floor, mezzanine, and first floor. This includes visual tests, ultrasonic pulse velocity testing, rebar scanning, core drilling, concrete breakout testing, and loading tests. The progress of each assessment point is tracked on a daily basis. The assessment results and analysis report will be completed between November 1-30, 2018.
This document outlines a time schedule for assessing the Lotte Mart building from October to November 2018. It details the assessment work to be completed on the ground floor, mezzanine, and first floor. This includes visual tests, ultrasonic pulse velocity testing, rebar scanning, core drilling, concrete breakout testing, and loading tests. The progress of each assessment point is tracked on a daily basis. The assessment results and analysis report will be completed between November 1-30, 2018.
This document outlines a time schedule for assessing the Lotte Mart building from October to November 2018. It details the assessment work to be completed on the ground floor, mezzanine, and first floor. This includes visual tests, ultrasonic pulse velocity testing, rebar scanning, core drilling, concrete breakout testing, and loading tests. The progress of each assessment point is tracked on a daily basis. The assessment results and analysis report will be completed between November 1-30, 2018.