CV - Contoh

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

CURRICULUM VITAE

1. Name :
2. Date of Birth :
3. Country of : Indonesian
Citizenship/Residence
4. Education : Bachelor of Civil Engineering,
5. Non Formal Education : - Civil 3D Training Course for Deliverable Drawing and Filing System by
Egis France, 5-9 December 2016
- Surabaya Mass Rapid Transport Workshop, Surabaya, 26-27 October
2015
- Infrastructure & Road Design with Genius Mensura – Geomensura
French, September 2014
- Building Facility Development Solution, PT. Sarana Solusindo
Informatika, Jakarta, 28 April 2014
- Jakarta Sukarno-Hatta International Airport Capacity Optimization
Workshop, Egis Avia & Ministry of Transportation of Indonesia, Jakarta,
2 April 2014
- Safety Introduction and Awareness Training, TRANSAFE – Jakarta, 27
March 2014
- Building Information Modelling – CAD to BIM “Productive & Cost
Effective”, Autodesk-EDP Media, Jakarta, 25 February 2014
- Autodesk University Extension Indonesia, Autodesk, Jakarta, 18
February 2014
- AutoCAD Civil3D 2013, Autodesk UK, Jakarta April 2013
6. Language Skill (English) : Good
7. Working Experience : 5 years

1. a. Name of Assignment Project : Detailed Engineering Design of Terbanggi Besar – Pematang Panggang
Toll Road
b. Location : Lampung, Sumatra
c. Client : Waskita Karya
d. Name of Firm : Egis Indonesia
e. Detail of Tasks : - Assisted Senior Highway Engineer to design plan and profile for main road
by Civil 3D
- Prepared interchange design
- Prepared plan and profile for crossing road
- Prepared cut and fill volume needed
- Prepared cross section
- Prepared and checked deliverable drawings related to highway
- Prepared traffic sign and marking design along the toll road
- Prepared ROW Plan of main road and interchange
f. Period : September 2016 - present
g. Positions held : Assistant Highway Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

2. a. Name of Assignment Project : Business Plan and Basic Design of Terbanggi Besar – Pematang
Panggang Toll Road
b. Location : Lampung, Sumatra
c. Client : Hutama Karya
d. Name of Firm : Egis Indonesia
e. Detail of Tasks : - Assisted Senior Highway Engineer to design plan and profile for main road

Aarieska Hermastiadi P. 1
by Civil 3D
- Prepared interchange design
- Prepared plan and profile for crossing road
- Prepared cut and fill volume needed
- Prepared cross sections
- Prepared and checked deliverable drawings related to highway
f. Period : April 2016 - present
g. Positions held : Assistant Highway Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

3. a. Name of Assignment Project : Technical Assistance for Surabaya Mass Rapid Transport Feasibility
Study
b. Location : Surabaya, East Java
c. Client : Bappenas
d. Name of Firm : Egis Rail
e. Detail of Tasks : - Prepared basemap for several utilities and inundation map
- Coordinated with local authorities about rellocation of utilities
- Prepared cost estimate for different variations of route alternative options
- Prepared monthly progress report
- Prepared and updated deliverable reports
- Prepared Minutes of Meeting after having coordination meeting
- Conducted site survey related to obstacle at the proposed alignment
- Prepared summary daily activities of the team and report them to Project
Coordinator
- Assisted calculate rolling stock capacity based on future demand and
headway
f. Period : June 2015 – March 2016
g. Positions held : Assistant Running way and road design
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

4. a. Name of Assignment Project : Detail Master Plan Kawasan Pariwisata Mandalika Lombok

b. Location : Lombok, Indonesia


c. Client : ITDC (Indonesia Tourism Development Coorporation)
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared baseline analysis of infrastructure
- Prepared Inception Report
- Conducted traffic survey in the peak season
- Prepared and checked conceptual drawing
- Prepared intersection and roundabout analysis based on Highway
Capacity Manual
- Prepared trip generation and trip distribution calculation based on land use
- Assisted Drainage Engineer to calculate dimension of the ditch used in the
resort
- Prepared parking lot needs analysis
- Prepared utilities network drawing
- Prepared plan and profile layout
- Prepared and checked all of deliverable drawings
f. Period : May 2014 – May 2015
g. Positions held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

Aarieska Hermastiadi P. 2
5. a. Name of Assignment Project : Detailed Engineering Design of WTP Serang

b. Location : Banten, Indonesia


c. Client : SCTK (Surya Citra Tata Kelola)
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared tender drawings
- Prepared and checked code and numbering of tender drawings
f. Period : August 2014 – November 2014
g. Positions held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

6. a. Name of Assignment Project : Engineering Estimate Cost of Labuan Bajo Marina

b. Location : Lombok, Indonesia


c. Client : MAHANAIM
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared layout drawing
- Prepared Term of Reference for Bathymetri work
- Prepared and checked code and numbering for all of drawings
- Compiled deliverable drawings
f. Period : May 2014 – August 2014
g. Position held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

7. a. Name of Assignment Project : SCM School

b. Location : Sulawesi, Indonesia


c. Client : PT Sulawesi Cahaya Mineral
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared detailed drawings
- Prepared and checked code and numbering for all of drawings
f. Period : April 2014
g. Position held : Assistant Engineer
h. Status of Employment : Permanent staff
i. Reference Letter from Client : -

8. a. Name of Assignment Project : Electricity Network of Soekarno Hatta International Airport

b. Location : Maluku Utara, Indonesia


c. Client : CEGELEC
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Identified drainage network
- Prepared cable distribution drawing
- Prepared Power Station and Substation drawing
- Identified Sewage Treatment Plant and Water Treatment Plant of Power
Station building
- Prepared and checked code and numbering for all of drawings
f. Period : March 2014 – June 2014
g. Position Held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

9. a. Name of Assignment Project : Revitalization of T1-T2 Soekarno Hatta International Airport

Aarieska Hermastiadi P. 3
b. Location : Jakarta, Indonesia
c. Client : Gubah Laras
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared Interm Report of Basic Design
- Prepared parking lot analysis
- Collected rainfall data and prepared calculation and drawing of drainage
network
- Prepared analysis and drawing of traffic sign and road mark design
- Prepared curb design, grating cover design, and guard rail design
- Prepared pavement thickness calculation based on component analysis
method
- Prepared calculation of vehicles number for specific period
- Prepared drainage report
- Prepared and checked all of deliverable drawings
f. Period : October 2013 – February 2014
g. Position Held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

10. a. Name of Assignment Project : Sulawesi Cahaya Mineral Performance of Owner’s

b. Location : Sulawesi, Indonesia


c. Client : PT Sulawesi Cahaya Mineral
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared plan and profile layout
- Draw and revise typical section for Wet Spot Area, River Crossing and
Drainage
f. Period : October 2013 – November 2013
g. Position Held : Assistant Engineer
h. Status of Employment : Permanent Staff
i. Reference Letter from Client : -

11. a. Name of Assignment Project : Weda Bay Nickel Road Design

b. Location : Maluku Utara, Indonesia


c. Client : PT. Weda Bay Nickel
d. Name of Firm : PT Egis Indonesia
e. Detail of Tasks : - Prepared cross section drawings
- Prepared plan view and profile layout drawings
- Controlled completeness of drawings
- Prepared drawnig consistency between all of drawings
- Calculated MTO Earthworks
- Prepared tracking list of the documents
- Prepared report about how to produce Cross Section and MTO
Calculation
f. Period : April 2013 – September 2013
g. Position Held : Drafter
h. Status of Employment : Non-Permanent Staff
i. Reference Letter from Client : -

12. a. Name of Assignment Project : Supervision of Semarang – Bojonegoro Double Track

b. Location : Central Java, Indonesia


c. Client : PT KAI
d. Name of Firm : PT Dardela Yasa Guna

Aarieska Hermastiadi P. 4
e. Detail of Tasks : - Conducted Steaking out wessels
- Checked the weight of bridge truss
- Calculated number of rail sleepers
- Prepared level crossing drawings
f. Period : January 2013 – March 2013
g. Position Held : Inspector
h. Status of Employment : Non-Permanent Staff
i. Reference Letter from Client : -

Jakarta, 28 February 2018

namajelas

Aarieska Hermastiadi P. 5

You might also like