WORK BREAKDOWN STRUCTURE

Everzone Motor Shop Sales and Inventory


PROJECT TITLE COMPANY NAME Everzone Motorshop
System with Barcode Reader

PROJECT MANAGER Yap, Arvin Dave DATE September 19, 2018

Garcia, Krizhelle S.
PROJECT ASSOCIATE
Rojo, Steve Jr.

Everzone Motor Shop Sales and Inventory System with Barcode Reader
LEVEL 1
LEVEL 2

Conception & Requirement System Design & Testing &


Planning Closing Project
Initiation Specification Development Training
LEVEL 3

2.1 Assembly 3.1 System 5.1 Mock 5.2 End-User


1.1 Analysis Study 4.1 Implementation 6.1 Project Go Live
Guidelines Requirements Testing Training

1.1.1 Research and 2.1.1 Team Meeting 3.1.1 Company Data 4.1.1 Designing 5.1.1 Test Units 5.1.0 User’s 6.1.1 Deliver System
Business Process Flow Design Software/User Interface Manual
Assessment 2.1.2 Scope, Limitation 5.1.2 Test 6.1.2 Install System
and Goal Setting 3.1.2 Software 4.1.2 Entity Relationship Modules 5.1.1 Conduct
1.1.2 Measure State of Specification Diagram Training at the 6.1.3 Monitor System
Current System 2.1.3 Develop and 5.1.3 Shop Performance
Submit Project 3.1.3 Hardware 4.1.3 Write code for Modifications (if
1.1.3 Project Plan/Overview Specification system modules needed) 6.1.4 Modifications and
LEVEL 4

Objectives Enhancement (if


2.1.4 Project Approval 3.1.4 Requirement 5.1.4 Conduct needed)
1.1.4 Prepare Design Analysis Production Test
& Prototype 6.1.5 System
Maintenance
1.1.5 Project Initiation