Bill Of Quantity

No Material Spesification Volume Quantity Total


A. Concrete Pipe
1 Reiforced Bar U-39, Fy 390 Mpa 70.79 kg 300.00 21,236.10
2 Concrete K-250 1.50 m3 300.00 450.00
3 Fabrication Cost Form work, Labour 300
4 Delivery Cost See site Location Below 300

Total
PPN 10%
Grand Total

Note:
1 Harga Sudah termasuk PPh Jasa 4%
2 Pembayaran secara reguler
3 Termasuk biaya untuk QA (Tes tekan beton)
4 Lokasi proyek terletak di Jl. Sultan Abdullah Raya (Samping PT. IKI)
Koordinat Proyek:
E: 769873
N: 9434930
Total Unit Price Total Price

kg Rp 18,500.00 Rp 392,867,850.00
m3 Rp 870,000.00 Rp 391,500,000.00
unit 250000 Rp 75,000,000.00
unit Rp 90,000,000.00
3,000,000 300
Rp 949,367,850.00
Rp 94,936,785.00
Rp 1,044,304,635.00

90,000,000
900,000,000

300,000