Bill of Quantity: No Material Spesification Quantity Total A. Concrete Pipe
Bill of Quantity: No Material Spesification Quantity Total A. Concrete Pipe
Total
PPN 10%
Grand Total
Note:
1 Harga Sudah termasuk PPh Jasa 4%
2 Pembayaran secara reguler
3 Termasuk biaya untuk QA (Tes tekan beton)
4 Lokasi proyek terletak di Jl. Sultan Abdullah Raya (Samping PT. IKI)
Koordinat Proyek:
E: 769873
N: 9434930
Total Unit Price Total Price
kg Rp 18,500.00 Rp 392,867,850.00
m3 Rp 870,000.00 Rp 391,500,000.00
unit 250000 Rp 75,000,000.00
unit Rp 90,000,000.00
3,000,000 300
Rp 949,367,850.00
Rp 94,936,785.00
Rp 1,044,304,635.00
90,000,000
900,000,000
300,000