Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
Table of Contents
1 PREDICTED PERFORMANCE 2
1.1 Steady state performance 2
1.2 Functional performance 5
1.2.1 Fuel flexibility 5
1.2.2 Start-up time 5
1.2.3 Load change rate 5
1.2.4 Controllability 6
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.
05 Predicted performance 2/6
Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
1 PREDICTED PERFORMANCE
The predicted performance data provided, on the following pages, is for information only
and shall not be considered as part of performance guarantees.
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.
05 Predicted performance 3/6
Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
Dust before ESP, wet g/Nm3 24.9 24.9 22.3 3.25 19.34
Dust after ESP, dry gas, 6 % O2 mg/Nm3 150 150 150 150 150
Total fly ash (incl. limestone) kg/s 3.45 2.14 1.43 0.471 2.7
Combustion air
Excess air ratio % 20 20 36 20 20
Primary Air Flow Nm3/s 79.94 53.65 43.46 83.41 80.82
Secondary Air Flow Nm3/s 34.26 13.41 4.83 35.75 34.64
Bed ash cooler air Nm3/s 2.8 2.8 2.8 2.8 2.8
Loop seal and limestone air Nm3/s 2.84 2.84 2.84 2.84 2.84
Air temperatures
Suction air temperature ˚C 34 34 34 34 34
Primary air after steam coil air preheater ˚C 54 75 85 54 54
Primary air after Flue gas air preheater ˚C 211 185 170 205 209
Overfire air after steam coil air preheater ˚C 58 55 42 60 55
Overfire air after Flue gas air preheater ˚C 131 130 124 129 129
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.
05 Predicted performance 4/6
Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.
05 Predicted performance 5/6
Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
Note: For startups not mentioned above, the rate of change of metal temperature
increase in drum determines the time taken to reach the desired load.
The load change speed guarantee calculated from prevailing load with guarantee fuel
coal 1:
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.
05 Predicted performance 6/6
Revision 2 CONFIDENTIAL
Project name PT Cikarang 2 x 135 MWe CFB Ari Kokko, V Karthik
Doc. ID POW12-02002 20 September 2012
Project ID
1.2.4 Controllability
In load change situations, boiler process parameters are guaranteed to fulfill following
requirements:
Steam Steam
Case
pressure temperature
±5% stepwise change in boiler load, within load range 60-100% ± 3 bar ±5C
±30% ramp change in boiler load, with max. speed 5 %/min,
+8/-10 bar ±15C
within load range 60-100%
In above mentioned stepwise change & ramp change flue gas conditions (O2 and CO)
are kept within interlocking limits.
© Valmet 2016
This document is the exclusive intellectual property of Valmet Corporation and/or its subsidiaries and is furnished solely for
operating and maintaining the specific project. Re-use of the document for any other project or purpose is prohibited. The document
or the information shall not be reproduced, copied or disclosed to a third party without prior written consent of the company.