DETAILED BREAKDOWN COST FEASIBILITY STUDY

EQUIPMENT UTILIZATION
ITEM OF WORKS QTY UNIT WAGES TEV MATERIALS OFFICE SUPPLIES SUNDRIES TOTAL COST
RENTAL FUEL OIL S.PARTS
A. CIVIL WORKS
I. FEASIBILITY WORKS
1. Project ID & Investigation Report l.s. 7,577.26 800.00 898.51 7,350.00 1,590.75 750.00 702.23 19,668.75
2. Data Gathering 30,439.52 1,678.01 546.00 1,193.06 787.50 594.17 35,238.26
3. Feasibility Study has. 11,216.32 612.83 182.00 397.69 262.50 198.06 12,869.39
4. Topographic Survey l.s. 25,137.65 1,600.00 1,940.98 1,940.98 7,350.00 1,590.75 750.00 702.23 41,012.59
II. DETAILED ENGINEERING WORKS

TOTAL DIRECT COST 74,370.75 2,400.00 1,940.98 5,130.33 15,428.00 4,772.25 2,550.00 2,196.68 ₱ 108,788.99