Revision history

Rev Description Date Aproved


00 15/11/2011
01 General update 13/03/2012
02 General update 10/07/2015
03 General update 19/08/2015

A30 A30 A60 A30 A30


Frame insulation

NON HAZARD SIDE HAZARD SIDE


HAZARD SIDE HAZARD SIDE
Frame insulation
Frame insulation

20

20
Cables Cables

Frame Frame
(*)

200 (*)
200

Bulkhead

Bulkhead Bulkhead insulation


Bulkhead insulation

(*) 300 mm for equivalent size greater than HMX 8x2


Project data Name Date Paseo del Niño 4, Nave B-2
Type Drawn C. Puente 19/08/2015 39300 Torrelavega, Cantabria, Spain
In case of exists any non harzard side, above insulation requirements are also needed
Name Insulation Aproved 19/08/2015 A30 bulkhead insulation for HM series
Please note that for marine applications, in general it is not cosidered the Reference Restricted due to: Information in accordance with IMO resolution 754(18)
possibilility of any non harzard side. The only non harzard side could be open Tolerances unless This drawing belongs to Hawke Rev
decks as defined in SOLAS Ch. II-2, Reg. 9.2.2.3.2.2 (4) and (5), 9.2.2.4.2.2 (10) and otherwise stated Transit System, copying or A3 INF-CRMHTS0461-0031 03
9.2.3.3.2.2 (10) but always below local surveyor approval Lineal: ±0.5 distributing to a third party
Units: mm Angular: ±0.5ª prohibited unless authorized. Scale:
HTS-EN-INF-CRMHTS0461-0031-03