JYC contractor is planning to excavate of 150 m 3 of soil at the site location consisting of mainly soft soil.
Based on the material and labor constants for construction work. Suggest a suitable method of
excavation that is most economical. The cost details are as follows: (Please include 15% for profit)
Diesel = RM 1.90/liter
Driver = RM 80.00/day
(15 marks)