PUNCH LIST

BLOCK
LOT NO:

PANEL ALIGNMENT REMARKS WINDOWS REMARKS


C.R PANEL C.R WINDOWS
ALIGNMENT PROPER SIZE
NO HONEY COMB LAPRES INSTALLED
ALIGN
FRONT PANEL
ALIGNMENT
NO HONEY COMB
FRONT WINDOWS
BACK PANELS PROPER SIZE
ALIGNMENT LAPRES INSTALLED
NO HONEY COMB ALIGN

WIDE PANELS BACK WINDOWS


ALIGNMENT PROPER SIZE
NO HONEY COMB LAPRES INSTALLED
ALIGN

DOOR ELECTRIAL
FRONT DOOR GI. WIRE ON PIPES
HEADER ALIGN UTILITY BOXES
JAMB ALIGNMENT ALIGN PANEL BOX

FLUSH DOOR KITCHEN SINK


HEADER NO DAMAGE
JAMB ALIGNMENT PROPER PLASTERING
PIPING
C.R DOOR
ALIGN C.R,TOILET BOWL AND TILES
BOWL PROPER PLACEMENT
PROPER TILING WORKS
SLAB PIPING
NO DAMAGED
NO SPILLED CONCRETE GENERAL
PROPER FLOOR LEVEL CLEANLINES
PROPER DIMISION OTHER

OTHER REMARKS
BILLING HISTORY
CONTRACTOR'S NAME : _____________________________ CONTRACT NO. : ___________________________
START DATE :______________________________ BLOCK NO:___________
END DATE : ______________________________ ODD[ ] OR EVEN [ ]

LOT 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 INSPECTION DATES


FLOOR TOPPING DATE: SIGNATURE
PROPER LEVEL
CLEAN OUT PROPERLY COVERED
NO SKIDMARK OR ANY MARKING
NO HARDENED CONCRETE
PROPER FLOOR FINISH

APPROVED FOR BILLING


BILLING NO.

TILING WORKS
PROPER LEVEL(DROP)
GROUT
COMPLETE SIDINGS
NO MISSING TILES
CLEAN OUT PROPERLY PLACED

APPROVED FOR BILLING


BILLING NO.

TOILET BOWL
PROPERLY SUPPORTED
PROPER PLACEMENT
PROPER FINISHING

APPROVED FOR BILLING


BILLING NO.

CR LAVATORY
PROPERLY INSTALLED
WATER LINE INSTALLED
DRAIN PIPE INSTALLED
FAUCET INSTALLED

APPROVED FOR BILLING


BILLING NO.

APPROVED AND PREPARED BY: CONTRACTORS' SIGNATURE


BILLING HISTORY
TOTAL CONTRACT PRICE : CONTRACT NO.
RETENTION
SUB TOTAL

BILLING NO. DATE PAYED: PAYMENT PRICE REMAINING BALANCE: CONTRACTOR SIGNATURE

10

IF SIGNED: THE CONTRACTOR ,ACCEPT ED THAT THE CONTRACT IS ALREADY IS EITHER COMPLETED OR CANCELED,ALL PAYMENT
EXCEPT FOR THE RETENTION IS ALREADY PAYED:
DATE: NAME OVER SIGNATURE

APPROVED AND PREPARED BY: CONTRACTORS' SIGNATURE


BILLING PUNCH LIST(FLOOR TOPPING,TILES AND TOILET BOWL)
CONTRACTOR'S NAME : _____________________________ CONTRACT NO. : ___________________________
DATE :______________________________
BLOCK NO;___________

LOT 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45
PAINT WORKS
FRONT PANEL
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

BACK PANEL
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

END WALL PANEL(IF ANY)


PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

WINDOWS
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

APPROVED FOR BILLING

ANTHONY M. ALVAREZ
APPROVED AND PREPARED BY: CONTRACTORS' SIGNATURE
BILLING HISTORY
CONTRACTOR'S NAME : _____________________________ CONTRACT NO. : ___________________________
START DATE :______________________________ BLOCK NO:___________
END DATE : ______________________________ ODD[ ] OR EVEN [ ]

LOT 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 INSPECTION DATES


PAINT WORKS DATE: SIGNATURE
FRONT PANEL
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

BACK PANEL
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

END WALL PANEL(IF ANY)


PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

WINDOWS
PROPERLY PATCHED
PROPERLY PAINTED
NO PAINT RESIDUAL

APPROVED FOR BILLING

TOTAL CONTRACT PRICE : CONTRACT NO.

APPROVED AND PREPARED BY: CONTRACTORS' SIGNATURE


BILLING HISTORY
RETENTION
SUB TOTAL

BILLING NO. DATE PAYED: PAYMENT PRICE REMAINING BALANCE: CONTRACTOR SIGNATURE

10

IF SIGNED: THE CONTRACTOR ,ACCEPT ED THAT THE CONTRACT IS ALREADY IS EITHER COMPLETED OR CANCELED,ALL PAYMENT
EXCEPT FOR THE RETENTION IS ALREADY PAYED:
DATE: NAME OVER SIGNATURE

APPROVED AND PREPARED BY: CONTRACTORS' SIGNATURE