Professional Documents
Culture Documents
PLan Parter
PLan Parter
Perete Perete
EI 180 - C0(CA1) EI 180 - C0(CA1)
teava de gaz
teava de gaz
55
40
55
40
15
35
35
I I
Hp = 2.05 Hp = 2.05
35 4.25 125 1.475 125 1.425 25 2.60 25 10.40 35
P11
Perete
CASA SCARII
EI 180 - C0(CA1)
3.00
2.85 Hp = 1.00
75
2.10
75
2.10
2.00 S.U.= 5.85 m2
3.00
H=3.15 m
2.00 P14 usa lemn cu ±0.00 P10
Perete
Hp = 50
DEPOZITARE geam simplu EI 180 - C0(CA1) U CONSILIERE CLIENTI 3.50
4.25
4.50
S.U.= 12.10 m2 S.U.= 44.25 m2
90
2.10
2.65
3.35
55
usa lemn cu
geam simplu
H=3.15 m usa lemn cu H=3.15 m
90
2.10
75
2.10
75
2.10
35
35
G geam simplu EI 90' C
125
Hp = 1.00 P15 Perete
90 90 usa lemn EI 180 - C0(CA1) 90
90 ±0.00 usa lemn cu SAS
geam simplu 2.95 2.10 S.U.= 10.80 m2 2.10
2.10
60
1.00
P18
3.55
2.95
Hp = 1.60
2.00 P20 +0.40 P19 SERVER
3.00
2.90
F
3.025
2.10
Hp = 1.10 P16
2.10
OFICIU VESTIAR S.U.= 8.60 m2
90
3.05
95
90
S.U.= 13.30 m2 S.U.= 11.30 m2 H=3.15 m P17 90 DEPOZITARE parapet zidarie
H=2.70 m H=3.15 m SAS 2.10 S.U.= 3.95 m2 Hp = 1,20
S.U.= 3.40 m2 H=3.15 m
5 5 5
35 4.40 35 3.90 35 2.82 12 2.05 12 2.40 125 10.10 45 4.20 35
90
2.10
E
125
25
5
12
75 70 P31 gol peste parter
Hp = 2.15
1.80
1.50
Hp = 50
1.475 125 H=3.15 m 125 5.025 125 H=3.15 m 5.20
9.60
3.125
P30 P08 P09 2.65
Hp = 1.20
2.10
P24
125
125
CAMERA NUMARAT BANI
90
ZONA BIROURI CONSILIERE CLIENTI
Hp = 2.15
usa lemn cu
7.50
P22 55 SAS
2.40
1.95
10
S.U.= 24.70 m2 S.U.= 79.40 m2 S.U.= 29.10 m2
GRUP SANITAR 40 S.U.= 4.75 m2 geam simplu H=3.15 m P32 H=3.15 m H=3.15 m
1.50
Hp = 1.20
S.U.= 4.30 m2
75 70 H=2.70 m 90 CASIERIE
A1 5.60 A1
18.60
18.60
6.00
5.60
2.10 P25
5
H=2.70 m 2.10 2.10 S.U.= 4.45 m2
1.85
1.95
4.50
SPATIU IN CONSERVARE
parapet zidarie
H=3.15 m
2.10
luminator tavan
pamant vegetal
S.U.= 15.65 m2
125
90
usa lemn cu
Hp = 1,20
H=3.15 m
P23 geam simplu 1.00 LIFT 2.10
Hp = 1.60
2.40
1.95
10
2.00 SPATIU IN CONSERVARE 1.20 S.U.= 1.40 m2
95 S.U.= 11.30 m2 ±0.00 H=3.15 m P29 90 P33
5.625
50
2.50
=
1.90
2.1
Hp
35 4.525 125 1.825 125 S.U.= 3.65 m2 S.U.= 4.55 m2
2.6 5
125
H=3.15 m H=3.15 m 5
3.30
2.05
90
2.00
80 ATM
Hp = 1.00 Hp = 1.00 Hp = 1.00 Hp = 1.00
D 2.10 P26 D
2.10
CASA SCARII
35
35
Hp = 1.10 Hp = 1.10
25
80
2.30
S.U.= 5.15 m2
2.00
2.50
2.00
1.50
2.00
2.00
2.00
70
P02 P01
1.50
H=3.15 m
±0.00 ACCES ACOPERIT -1.05
WINDFANG
1.50
2.30 P07
Hp = 1.00
Hp = 1.00 Hp = 1.00 1.80
2
2.55 S.U.= 3.80 m2.60 S.U.= 10.25 m2
BIROU
C H=3.15 m 3.15 H=3.15 m
2.85
2.00 S.U.= 12.55 m2 3.15
H=3.15 m
1.50
2.00
1.50
2.00
1.45
Perete U
90
2.00
PRINCIPAL
EI 180 - C0(CA1)
ACCES
90
2.15
B
6.00
3.15
Hp = 1.10
90
25
EI 90' C P05
Hp = 1.10
EI 30' C
Perete 90 PAZA 90
EI 180 - C0(CA1)
±0.00
U
1.05 S.U.= 3.95 m2 2.10
4.50
P06
Hp = 1.50
2.00 H=3.15 m
CASA SCARII P03
3.05
2.10
1.50 S.U.= 16.60 m2 P04 DISPECERAT +CSI
90
H=3.15 m GRUP SANITAR S.U.= 6.40 m2
2.80
1.12
Perete S.U.= 4.15 m2 H=3.15 m
1.20
EI 180 - C0(CA1) H=3.15 m
35 5.86 25 2.865 125 2.80 35
A A
35
CONSTRUCTIE EXISTENTA Perete
alarma
Perete
4.50 4.50 4.50 3.00 3.00 EI 180 - C0(CA1) 4.50 3.00 4.50 EI 180 - C0(CA1)
4.50 5.10 9.90 12.60
32.10
1 2 3 4 5 6 7 8 9 10 12
Proiectat
RELEVAT arh. Laura PREDA Data: TITLU PLANSA PLANSA NR.
TOATE INSEMNARILE CU ROSU SE PROPUN SPRE CONFORMARE PLAN PARTER A.05-DS01
Desenat arh. Alexandra IVASCU 11/2016
GSPublisherVersion 0.65.100.100