Job Text Modification jobs on OBM & NBM as per FLSMITH audit points
Scope of Job
1. 4" pipeline to be installed in NBM from NBM bagfilter discharge to bottom Air Slide.( approx- 6 mtr) 2
.OBM vent line modification to be done 10" pipe has ot be fabricate d & installed from OBM bafilter to GRS silo. Old line to be removed and new
line with slope angle to be fixed.( approx- 25 mtrs).
3 .6" line has to be modified from OBM Elevator discharge to bagfilter.Line to be modified as per NBM discharge line.( approx-12 mtrs).
4.4" line from NBM bag filter to top air slide
Period of PO to be
Service Dec-18 placed by 11/20/2018
PO
Validity 1 month
3 4" line from NBM bag filter to top air slide MTR 12 L.S
6" line has to be modified from OBM Elevator discharge to
4 bagfilter.Line to be modified as per NBM discharge line MTR 12 L.S
Scope
1 Lines modifcation to be done as per FLSmith proposal.
2
*** scaffolding to be planned & arranged before starting the job as per field requirment.
Total : 19939.62
22930.56
533672
OT Hours Total
planned/
day
0 0
0 0.00
0
0