Progress Percentage Approval Document 70,18% 10,53% 80,70% 13,16% 0,00% 2,63%
Total Progress Percentage Submitted
70,18% 10,53% 80,70%
Document
Note : This deliverable list may varies based on actual engineering process and will be further adjusted
Project : Engineering, Procurement, Construction for Inland Harbour A = Approved without comment
Donggi Senoro LNG Project B = Approved with minor comment, proceed to issue as approved after clearing
Company : PT. EPTCO DIAN PERSADA N = Not approved
Location : Sulawesi UR = Under review by DS
F = For Information
Technical Document
1 C16001-EDP-CIV-CAL-0001 Pontoon Structural Calculation 1 1 LOT A4 13-Feb-16 27-Apr-16 13-Jul-16 15-May-16 18-Jul-16 B 7-May-16 22-May-16 7-Nov-16 11-Nov-16
2 C16001-EDP-CIV-CAL-0002 Dredging and Breakwater Slope Stability 1 1 LOT A4 13-Feb-16 13-Feb-16 11-Jul-16 24-Apr-16 13-Jul-16 A 4-Aug-16 13-Feb-16 26-Feb-16 14-Apr-16 18-Apr-16 17-Jun-16 16-Jul-16 20-Jul-16 4-Aug-16
3 C16001-EDP-CIV-CAL-0003 Access Bridge Structural Calculation 1 1 LOT A4 20-Feb-16 27-Apr-16 13-Jul-16 15-May-16 18-Jul-16 A 11-Nov-16 7-May-16 22-May-16 7-Nov-16
4 C16001-EDP-CIV-CAL-0004 Hydro-Oceanography Analysis 1 1 LOT A4 13-Feb-16 13-Feb-16 11-Jul-16 24-Apr-16 13-Jul-16 A 1-Aug-16 11-Feb-16 26-Feb-16 28-Mar-16 18-Apr-16 13-Jun-16 11-Jul-16 6-Jul-16 11-Jul-16 20-Jul-16 1-Aug-16
5 C16001-EDP-CIV-CAL-0005 Structural calculation for breakwater 1 1 LOT A4 13-Feb-16 13-Feb-16 11-Jul-16 24-Apr-16 13-Jul-16 A 1-Aug-16 11-Feb-16 26-Feb-16 28-Mar-16 19-Apr-16 13-Jun-16 29-Jun-16 20-Jul-16 1-Aug-16
6 C16001-EDP-CIV-CAL-0006 Traffic and manuvering simulation for boat 1 1 LOT A4 22-Feb-16 27-Apr-16 11-Jul-16 15-May-16 13-Jul-16 B 25-Mar-16 4-May-16 6-Jul-16 11-Jul-16
7 C16001-EDP-CIV-CAL-0007 Support Pier Structural Calculation 1 1 LOT A4 13-Feb-16 27-Apr-16 13-Jul-16 15-May-16 18-Jul-16 B 7-May-16 22-May-16 31-Oct-16 2-Nov-16
8 C16001-EDP-CIV-CAL-0008 Liquifaction Potential Analysis 1 1 LOT A4 14-Apr-16 13-Jul-16 24-Apr-16 18-Jul-16 A 1-Aug-16 14-Apr-16 29-Apr-16 17-Jun-16 16-Jul-16 20-Jul-16 1-Aug-16
9 C16001-EDP-CIV-CAL-0009 Open Dicth Calculation 3 1 LOT A4 F 13-Jun-16
10 C16001-EDP-CIV-CAL-0010 Final Set Criteria for Piling 3 1 LOT A4 F 6-Aug-16
11 C16001-EDP-CIV-CAL-0011 Navigation Light Foundation Calculation 1 1 LOT A4 A 10-Nov-16 18-Oct-16 19-Oct-16 2-Nov-16
12 C16001-EDP-CIV-RPT-0001 Test Report for Rock 1 1 LOT A4 11-Feb-16
13 C16001-EDP-CIV-RPT-0002 Test Report of Concrete Site Mix 1 1 LOT A4 11-Feb-16
14 C16001-EDP-CIV-RPT-0003 FINAL REPORT TOPOGRAPHY & BATHYMETRY SURVEY 2016 3 1 LOT A4 11-Feb-16 F 11-Feb-16