Professional Documents
Culture Documents
History of Batangas Regional Hospital (Batangas Medical Center)
History of Batangas Regional Hospital (Batangas Medical Center)
The hospital was constructed sometime in 1927, during the administration of Governor Modesto
Castillo. It was thru his first effort-sided by the members of the Provincial Board Atty. Maynardo Farol
and Maximo Sarmiento, by District Engineer Isaias Fernando and Provincial Treasurer Jose Ocampo, that
the establishment of the provincial hospital was realized. It was inaugurated and opened to the public
on the 1st of January 1928 with Dr. Sixto Roxas, a prominent and well-known physician as Chief of the
Hospital.
The hospital has a bed capacity of 30. There were three wards for the charity patients and three private
rooms to pay patients. Besides this, the Resident Physician and the Administrative Office, the operating
room, on the rear portion of the main building. During the incumbency of governor Vicente Noble, upon
the recommendation of the Chief of Hospital, Dr. Roxas a new Nurses' Home was constructed
sometimes in 1935. Then, during the administration of Gov. Vicente Caedo who realized the urgent need
of increasing the bed capacity, two additional wings (pavilion type) porte corchore and a separate
delivery room were constructed in 1941. The expenditures of these projects were covered by funds from
the sweepstakes allotments of the province which were set aside for the above purpose through the
efforts of Gov. Caedo.
The operation of the hospital was suspended upon the arrival of the Japanese, who confiscated all the
equipment and medicines and it resumes its operation temporarily in 1943, and continued throughout
1944. The Nurses Home was burned by the Japanese, but the main building and other structures in the
hospital compound were not subjected to the same fate as the Nurses Home.
In April 1945, upon the arrival of the American Forces of Liberation, the operation of the hospital was
revived by the PCAU no. 11, which furnished and equipped it with all necessary medical supplies,
equipment, surgical instruments, cots and even light and water services. On the 1st of August, 1945, the
hospital with all its contents was turned over to the Commonwealth Government, and all are pre-war
employees were called to service. Dr. Sixto Roxas once more, headed the hospital staff. Improvement of
surplus sepots here in Manila, steel beds and mattresses, which replaced the cots, bedside tables,
folding chairs, electrical sterilizers, etc. The water tanks were installed to insure continuous supply of
water.
Upon the unexpected death of Dr. Roxas on the 28th of March 1948, Dr. Vicente G. Berba was
designated to take charge of the hospital, who finally was appointed permanent Chief of Hospital.
Sometimes during the later part of 1949, rehabilitation work commenced. The Nurses Home was
rehabilitated and was partly financed by the war damage funds amounting to P10, 000.00 and hospital
funds amounting to P482.60. It was completed and occupied on the 1st of May 1949.
The fiscal years 1949-1950 may be described as memorable in the history of Batangas Provincial Hospital
in the sense that it was during this period when all the improvements such as repairs, repainting of
buildings, reconstruction of kitchen and its painting, and acquisition of surgical supplies were realized.
Then the second period may also be called lamentable because it was during this period when all the
necessary improvements made thereon, were all blasted into nothingness by a more stroke of faith. In
the afternoon of February 25, 1950, a bomb explosion occurred in the Philippine Constabulary
Compound situated about two hundred yards of this few seconds, almost completely destroyed the
hospital premises and totally wreaked the Nurse's Home.
Sometimes in May 1950, a delegation of Batangas Residents, which includes Mayors of some towns in
Batangas, Representatives of the Rotary Club of Batangas, Batangas Women's Club, prominent political
leader and civic spirited citizens of Batangas was received by the president in possible through the
efforts of Dr. Olegario Cantos. As a result of the petition of the delegation, a check of P50, 000.00 from
the funds of Philippine Charity Sweepstakes was presented to Dr. Vicente Berba, chief of the Batangas
Provincial Hospital by Dr. Cantos in September 1950. The reconstruction work, including painting and
other improvements was ended in May 1951. It has a bed capacity of 70.
For the past 85 years, the Batangas Provincial Hospital has never been
static. It is always in the process of change in all aspects. Looking back,
this hospital was constructed sometime in the year 1927 during the
administration of Governor MODESTO CASTILLO. It was through his efforts
that the establishment of a Provincial Hospital was realized. This hospital
was inaugurated and opened to the general public on January 1, 1928 as a
“Provincial Hospital” with a bed capacity of 30, with Dr. Sixto L. Roxas, a
prominent and well known physician of Batangas, as Chief of
Hospital. There were three(3) wards for charity patients and three (3)
private rooms and separate rooms for the Chief of Hospital, the Resident
Physicians and the Administrative Officer. There was an Operating
Room and an Out-Patient room. The Kitchen and Dining were situated at the
rear portion of the main building.
The operation of the hospital was temporarily suspended upon the arrival
of the Japanese Imperial Forces who confiscated all its equipment and
medicines. In 1943 the operation resumed temporarily until 1944. The
Nurses Home during that time was burned by the Japanese soldiers, but the
main building and other hospital structures in the compound were spared
from the fire.
In April 1945, upon the arrival of the Liberating American Forces, the
operation of the hospital operation resumed furnished and equipped with all
the necessary medical supplies, equipments, surgical instrument and even
light and water services.
In March 28, 1948, Dr. SIXTO L. ROXAS died, after which Dr.
VICENTE C. BERBA was designated to take charge of the Hospital, and later
on was finally appointed as permanent Chief of Hospital.
Sometime in 1950, after the tragic incident damaging almost all the
hospital proper, a delegation of residents of Batangas including Mayors of
some towns of Batangas; representatives of the Rotary Club of Batangas;
Batangas Women’s Club; prominent political leaders and civic spirited
citizens of Batangas went to the Office of the then President Elpidio Quirino.
The reception of the delegation was made possible thru the efforts of Dr.
OLIGARIO CANTOS. As a result of the position requested by the
delegation, funds from the Philippine Charity Sweepstakes was given to Dr.
VICENTE G. BERBA, the then Chief of Hospital thru Dr. OLIGARIO CANTOS,
in September, 1950, after which the reconstruction work of the hospital was
started in the middle of November, same year in accordance with
specifications prepared by the District Engineer’s Office. The whole
reconstruction work including painting and other improvements were
completed in 1951. Bed capacity was 70.
From the Php. 50,000.00 Pork Barrel Allotment of the then Speaker
Jose P. Laurel, Jr., an Out Patient Department (OPD) was constructed at
the west side of the hospital wherein the Dental Clinic, the EENT Clinic, X-
ray, Laboratory, pharmacy, Dispensary are located. The construction of the
Out-Patient Department made available the space formerly occupied by the
Dispensary, laboratory, Laboratory, Pharmacy, and X-ray, as the male and
female wards.
Expansion of the hospital Mess Hall was made possible by the additional
space now occupied by the kitchen. Three (3) Nurses stations were were
also constructed in line with departmentalization of the hospital.
In 1955, the first hospital water tank was installed, the contents of
which is more or less 5,000 gallons.
In 1977, still there was sign of prosperity when the hospital had
undertaken construction like the Laundry Building, Morgue building, Car
Shed, Nurses Home and Mini-Park, all taken from the hospital savings.
In 1978, still from the Capital Outlay (CO), there were several
renovations and construction: Old Kitchen to Supply Room Office; Stock
Room; Central Supply Room; Delivery Room; Charity Ward Toilet and
Demonstration Room. Also included in the list was renovation of the Nursery
Room - one (1) for pathological Nursery and one (1) for the Non-
pathological or well-baby Nursery;
After nine (9) long years, in December 1987, the DOH released the
amount of Php. 300,00 taken from its Capital Outlay (C0) for the repair and
renovation of the LABORATORY Department.
In early 1988, the repair and renovation of the Medical and Psychiatric
(Mental Clinic) of the hospital out of the Capital Outlay (C0) in the amount of
Php. 250,000.00 was undertaken.
In NOVEMBER 19, 2009, at last the long wait was over. By virtue of
REPUBLIC ACT NO. 9791, “An Act Amending Republic Act No. 7532 ,
CONVERTING THE BATANGAS REGIONAL HOSPITAL TO THE
BATANGAS MEDICAL CENTER, FURTHER INCREASING ITS BED
CAPACITY TO FIVE HUNDRED (500) BEDS,” was approved and
signed into law by former President GLORIA MACAPAGAL-ARROYO.
In January, 2013, under the administration of Dr. RAMONCITO C.
MAGNAYE, Chief of Hospital III, the Batangas Regional Hospital was
renamed as BATANGAS MEDICAL CENTER (BatMC)
1928
7/31/1935
9/25/36
1936
1939
December 23, 1943
December 25, 1947