Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

8

D of
HA555 EA-383186 P 3-1313003.03 4400004656 3 4 5 6 7
03 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.

OW NER.
1 2
13.8kV U/V LOAD SHEDDING PANEL-2 +UVLS.2

RELAY

94LS/B321 RELAY

TS
OF I
ON

ON
94LS/B320
SI

SI
SUPERVI

SUPERVI

CONSENT
A
+UVLS.3 A

2X3 3X3
+R1

TTEN
SHT.02/7A 3 1

THE W RI
LEGEND

THOUT
DEVICE DESCRIPTION TYPE MAKE

94LS.... TRIP RELAYS 7868FD ELECTRO SWITCH

WI
SUPERVISION RELAY FOR SPER1C1 ABB

DOCUMENT
74/94LS...
TRIP RELAY
+UVLS.1 +UVLS.1
TEST SWITCH FT19R ABB
11 18 11 18 TS....

B B
1X5 1X5
9 74/94LS/B320 10 74/94LS/B321
/2D /4D

S
THI
SPER1C1 SPER1C1
EA-383183 21 28 EA-383183 21 28
2X5 9 2X5 10
SHT.03 SHT.03

FROM NED
94LS/B320 94LS/B321

SHALL BE OBTAI
11 13 11 13
/1D /3D
08/3D

08/4D
2 2
A A
SHT.

SHT.
TS12

TS13
1 1

PART
TB1 TB2 TB1 TB2

N
I
C C
B B

FULL OR
LOR LOR
A A

F F
LOR

LOR
K2

K2
K1

K1
K1

K1
G G

N
I ON
RESET

RESET
P

P
LOR

LOR
LOR

LOR
TRI

TRI

REPRODUCTI
K2

K2
LOR LOR
R2

R2
R1

R1
94LS/B320

94LS/B321

TO F TO F REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
94LS/B320

94LS/B321
/3D
/1D

TB3 TB3 DRAWING CONTROL SHEET EE-383111


12 12

/3D
/1D

RELAYING & METERING ONE LINE DIAGRAM EA-382856


18 18

NO d SA
08/3D

08/4D

3 3

onalGri
D D
B B
TS12

TS13
SHT.

SHT.

4 4

OF Nati
2X3 3X3
-R1
SHT.02/7D 4 2

ARE THE SOLE PROPERTY


74/94LS/B320 74/94LS/B321
94LS/B320 94LS/B321 DWG:EA-383189
11 21 /2B 11 21 /4B SHT:01
TB1/2C TB1/3C
TB3 18 28 TB3 18 28
TB2 TB2
/2D SPARE /4D SPARE
12 18 15 16 12 18 15 16
SHT.04/6C SHT.04/6C
14 16 17 14 16 17
/2B /4B
11 13 SPARE 11 13 SPARE
SHT.06/3B 25 26 SHT.06/3C 25 26
15 17 15 17
SHT.05/5C 27 SHT.05/6C 27
22 28 22 28
SPER1C1 SPER1C1
SHT.06/3C SHT.06/3C
24 26 24 26
SPARE SPARE AS-BUILT BY DATE
21 23 21 23
SPARE SPARE
25 27 25 27 D 2017-01-03 AES REVISED AS PER CONSULTANT COMMENTS KAM AS AS

N
HEREI
SHT.07/5D SHT.07/5D
32 38 32 38
E SPARE SPARE E C 2016-11-24 AES AS MANUFACTURED KAM AS AS
34 36 34 36
SPARE SPARE
31 33 31 33 B 2016-01-07 AES AS PER CUSTOMER REQUIREMENTS KAM AS AS

NED
SPARE SPARE
35 37 35 37
A 2015-10-12 AES ISSUED FOR DETAILED DESIGN KAM AS AS

CONTAI
SPARE SPARE
42 48 42 48
SPARE SPARE REV.
44 46 44 46 DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
SPARE SPARE
41 43 41 43
DRAWING COMPLETION CERTIFICATE (DCC):
SPARE SPARE
45 47 45 47

ON
SPARE SPARE

NFORMATI
52 58 52 58
SPARE SPARE
54 56 54 56
SPARE SPARE
51 53 51 53
SPARE SPARE
55 57 55 57

THE I
SPARE SPARE
62 68 62 68 DRAWN BY DINAKAR CHECKED BY KAMAL SCALE: NONE

SPARE SPARE
64 66 64 66 2015-10-12
DATE STARTED DATE COMPLETED
SPARE SPARE
61 63 61 63

AND
SPARE SPARE OPR'G. DEPT. ENG. DEPT.
65 67 65 67
F
SPARE SPARE
72 78 72 78 F THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

NG
SPARE SPARE CONSTRUCTION OR FOR ORDERING
74 76 74 76

DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE
SPARE SPARE
71 73 71 73

75 77
SPARE 7868FD
75 77
SPARE 7868FD DC ELEMENTARY DIAGRAM +UVLS.2
SPARE SPARE SPARE SPARE
82 88 85 87 82 88 85 87 13.8kV U/V LOAD SHEDDING PANEL-2

S
THI
SPARE SPARE SPARE SPARE
84 86 81 83 84 86 81 83 AL-UQAIR 115/13.8kV SUBSTATION-A
MANUFACTURER/VENDOR NAME
AL-UQAIR SAUDI ARABIA
ALFANAR ELECTRICAL SYSTEMS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
DRAWING NO. SHEET NO. REV. NO.
03
EA-383186 03 of 8 D 1 2 3 4 5 6 7
4400004656 3-1313003.03 P HA555 EA-383186 of
8 D
NG-A (2012/01)

DMS VECTOR NGA00

You might also like