Professional Documents
Culture Documents
13.8Kv U/V Load Shedding Panel-2 +uvls.2: D HA555 P 3-1313003.03 EA-383186 4400004656
13.8Kv U/V Load Shedding Panel-2 +uvls.2: D HA555 P 3-1313003.03 EA-383186 4400004656
D of
HA555 EA-383186 P 3-1313003.03 4400004656 3 4 5 6 7
03 NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO. CONTRACT NO.
OW NER.
1 2
13.8kV U/V LOAD SHEDDING PANEL-2 +UVLS.2
RELAY
94LS/B321 RELAY
TS
OF I
ON
ON
94LS/B320
SI
SI
SUPERVI
SUPERVI
CONSENT
A
+UVLS.3 A
2X3 3X3
+R1
TTEN
SHT.02/7A 3 1
THE W RI
LEGEND
THOUT
DEVICE DESCRIPTION TYPE MAKE
WI
SUPERVISION RELAY FOR SPER1C1 ABB
DOCUMENT
74/94LS...
TRIP RELAY
+UVLS.1 +UVLS.1
TEST SWITCH FT19R ABB
11 18 11 18 TS....
B B
1X5 1X5
9 74/94LS/B320 10 74/94LS/B321
/2D /4D
S
THI
SPER1C1 SPER1C1
EA-383183 21 28 EA-383183 21 28
2X5 9 2X5 10
SHT.03 SHT.03
FROM NED
94LS/B320 94LS/B321
SHALL BE OBTAI
11 13 11 13
/1D /3D
08/3D
08/4D
2 2
A A
SHT.
SHT.
TS12
TS13
1 1
PART
TB1 TB2 TB1 TB2
N
I
C C
B B
FULL OR
LOR LOR
A A
F F
LOR
LOR
K2
K2
K1
K1
K1
K1
G G
N
I ON
RESET
RESET
P
P
LOR
LOR
LOR
LOR
TRI
TRI
REPRODUCTI
K2
K2
LOR LOR
R2
R2
R1
R1
94LS/B320
94LS/B321
TO F TO F REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
94LS/B320
94LS/B321
/3D
/1D
/3D
/1D
NO d SA
08/3D
08/4D
3 3
onalGri
D D
B B
TS12
TS13
SHT.
SHT.
4 4
OF Nati
2X3 3X3
-R1
SHT.02/7D 4 2
N
HEREI
SHT.07/5D SHT.07/5D
32 38 32 38
E SPARE SPARE E C 2016-11-24 AES AS MANUFACTURED KAM AS AS
34 36 34 36
SPARE SPARE
31 33 31 33 B 2016-01-07 AES AS PER CUSTOMER REQUIREMENTS KAM AS AS
NED
SPARE SPARE
35 37 35 37
A 2015-10-12 AES ISSUED FOR DETAILED DESIGN KAM AS AS
CONTAI
SPARE SPARE
42 48 42 48
SPARE SPARE REV.
44 46 44 46 DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.
SPARE SPARE
41 43 41 43
DRAWING COMPLETION CERTIFICATE (DCC):
SPARE SPARE
45 47 45 47
ON
SPARE SPARE
NFORMATI
52 58 52 58
SPARE SPARE
54 56 54 56
SPARE SPARE
51 53 51 53
SPARE SPARE
55 57 55 57
THE I
SPARE SPARE
62 68 62 68 DRAWN BY DINAKAR CHECKED BY KAMAL SCALE: NONE
SPARE SPARE
64 66 64 66 2015-10-12
DATE STARTED DATE COMPLETED
SPARE SPARE
61 63 61 63
AND
SPARE SPARE OPR'G. DEPT. ENG. DEPT.
65 67 65 67
F
SPARE SPARE
72 78 72 78 F THIS DRAWING IS NOT TO BE USED FOR CERTIFIED
NG
SPARE SPARE CONSTRUCTION OR FOR ORDERING
74 76 74 76
DRAW I
MATERIAL UNTIL CERTIFIED AND DATED BY DATE
SPARE SPARE
71 73 71 73
75 77
SPARE 7868FD
75 77
SPARE 7868FD DC ELEMENTARY DIAGRAM +UVLS.2
SPARE SPARE SPARE SPARE
82 88 85 87 82 88 85 87 13.8kV U/V LOAD SHEDDING PANEL-2
S
THI
SPARE SPARE SPARE SPARE
84 86 81 83 84 86 81 83 AL-UQAIR 115/13.8kV SUBSTATION-A
MANUFACTURER/VENDOR NAME
AL-UQAIR SAUDI ARABIA
ALFANAR ELECTRICAL SYSTEMS CONTRACT NO. JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.
DRAWING NO. SHEET NO. REV. NO.
03
EA-383186 03 of 8 D 1 2 3 4 5 6 7
4400004656 3-1313003.03 P HA555 EA-383186 of
8 D
NG-A (2012/01)