Progress as o

Road Works : Linear progress


Section-I
Kms 36.300-44.000,45.200-64.300 = 26.800 Km

S.No. Activity
Total Completed
LHS RHS
Length Length

C&G
1 26800 26800 26800 26800
Excavation
2 26800 26800 26800 26800
Embankment
3 26800 26800 26800 26800
SG
3 26800 26800 26800 26800
GSB
4 26800 26800 26800 26800
WMM I
5 26800 26800 26800 26800
WMM Top
6 26800 26800 26800 26800
BM
7 26800 26800 26800 26800
DBM
8 26800 26800 26800 26800

9 BC 26800 26800 26800 26800

Structures
I. Culverts
Section-I Section-II
S.No. 11
S.No.
Pipe Slab Box
Pipe Culvert
Culvert Culvert Culvert

1 Total 26 4 7 23

2 Completed 26 4 7 14

3 In progress - - - 5

4 Balance - - - 9

Total culverts Completed In Progress


84 55 11

II. Minor Bridges/Major Bridge

Section-I Section-II
S.No.
Minor Major Minor Major

2 1
1 Total 3 -
- -
2 Completed 3 -
- 1
3 In Progress - -
2 -
4 Balance - -

11
Progress as on - 15.07.2017

Section-II
Kms = 12.540 - 16.200,17.090 - 35.050, 44.000-45.200, 64.300 -
68.486= 27.006 Km

Total Completed
% Completed LHS RHS % Completed
Length Length

100.00% 27006 16800 17370 17085 63.00%

100.00% 27006 15440 15850 15645 58.00%

100.00% 27006 15440 15850 15645 58.00%

100.00% 27006 12520 13120 12820 47.00%

100.00% 27006 10680 12100 11390 42.00%

100.00% 27006 10530 11740 11135 41.00%

100.00% 27006 10340 11470 10905 40.00%

100.00% 5386 2610 3120 2865 53.00%

100.00% 27006 8360 7390 7875 29.00%

100.00% 27006 2260 2240 2250 8.00%

Section-II Overall progress


11
Box Pipe Slab
Slab Culvert Box Culvert
Culvert Culvert Culvert

2 22 49 6 29

1 3 40 5 10

1 5 5 1 5

1 19 9 1 19

Balance
18

Overall
Remarks
progress

11
Overall completion

Length

43885

42445

42445

39620

38190

37935

37705

29665

34675

29050

11
Linear Progress As on 15.07.2017
LEFT HAND SIDE
Section-I : Kms 36.300-44.000,45.200-64.300 = 26.800 Km
Item of work completed Excavat- Embank-
From To C&G SG Top GSB
as on date ion ment
36300 44000 BC 7700 7700 7700 7700 7700
45200 64300 BC 19100 19100 19100 19100 19100
Total 26800 26800 26800 26800 26800

Section-II : Kms = 22.000 - 35.050= 13.050 Km


12540 12660 C&G 120
12660 12800 EMB 3rd 140 140 140
13000 13350 C&G 350
13350 13700 EMB TOP 350 350 350
13700 14200 Emb 2nd 500 500 500
14200 14700 Emb 1st 500 500 500
14700 15100 Emb 3 rd 400 400 400
15100 15300 C&G 200
21200 21540 C&G 340
22050 22400 C&G 350
22400 22450 GSB top 50 50 50 50 50
22450 22960 WMM Top 510 510 510 510 510
22960 22980 SG top 20 20 20 20
23010 23300 WMM Top 290 290 290 290 290
23360 23800 WMM Top 440 440 440 440 440
23900 24000 DBM 100 100 100 100 100
24000 24100 GSB top 100 100 100 100 100
24100 24150 WMM Top 50 50 50 50 50
24150 24700 DBM 550 550 550 550 550
24700 24800 WMM 1st 100 100 100 100 100
24800 25140 DBM 340 340 340 340 340
25140 25150 WMM 1st 10 10 10 10 10
25150 25400 EMB TOP 250 250 250
25400 25850 SG top 450 450 450
25850 26060 SG 2 nd 210 210 210 210
26070 26100 SG top 30 30 30 30
26100 26150 WMM Top 50 50 50 50 50
26150 26300 DBM 150 150 150 150 150
26300 26350 WMM Top 50 50 50 50 50
26350 26910 DBM 560 560 560 560 560
26910 26960 WMM 1st 50 50 50 50 50
26960 27000 SG top 40 40 40 40
27000 27100 SG 2 nd 100 100 100 100
27100 27120 WMM Top 20 20 20 20 20
27120 27530 DBM 410 410 410 410 410
27530 27550 WMM Top 20 20 20 20 20
27550 28100 SG 2 nd 550 550 550 550
28830 29360 SG top 530 530 530 530
29360 29400 SG top 40 40 40 40
29400 30070 DBM 670 670 670 670 670
30070 30100 SG top 30 30 30 30

6
30100 30150 EMB TOP 50 50 50
30150 30200 WMM Top 50 50 50 50 50
30200 30600 DBM 400 400 400 400 400
30600 30650 WMM Top 50 50 50 50 50
31000 31050 WMM Top 50 50 50 50 50
31050 31270 DBM 220 220 220 220 220
31270 31340 S.G TOP 70 70 70 70
31400 34100 DBM 2700 2700 2700 2700 2700
34100 34150 WMM Top 50 50 50 50 50
44000 44040 BC 40 40 40 40 40
44040 44110 BM 70 70 70 70 70
44110 44140 WMM 1st 30 30 30 30 30
44140 44190 Emb 50 50 50
44380 44480 Emb 100 100 100
44550 44680 Emb 130 130 130
44680 44800 SG 2nd 120 120 120 120
44800 44850 BM 50 50 50 50 50
44850 45200 BC 350 350 350 350 350
64300 64430 BM 130 130 130 130 130
64430 66300 BC 1870 1870 1870 1870 1870
66300 66400 BM 100 100 100 100 100
66400 66500 SG TOP 100 100 100 100
Total 16800 15440 15440 12520 10680
Overall Total 43600 42240 42240 39320 37480

7
Progress As on 15.07.2017
LEFT HAND SIDE
s 36.300-44.000,45.200-64.300 = 26.800 Km

WMM I WMM Top BM DBM BC

7700 7700 7700 7700 7700


19100 19100 19100 19100 19100
26800 26800 26800 26800 26800

Kms = 22.000 - 35.050= 13.050 Km

510 510

290 290
440 440
100 100 100

50 50
550 550 550
100
340 340 340
10

50 50
150 150 150
50 50
560 560 560
50

20 20
410 410 410
20 20

670 670 670

8
50 50
400 400 400
50 50
50 50
220 220 220

2700 2700 2700


50 50
40 40 40 40 40
70 70 70
30

50 50 50
350 350 350 350 350
130 130 130
1870 1870 1870 1870 1870
100 100 100

10530 10340 2610 8360 2260


37330 37140 29410 35160 29060

9
Linear Progress As on 15.07.2017
RIGHT HAND SIDE
Section-I : Kms 36.300-44.000,45.200-64.300 = 26.800 Km

Item of work completed as Excavat- Embank-


From To C&G SG Top GSB
on date ion ment

36300 44000 BC 7700 7700 7700 7700 7700


45200 64300 BC 19100 19100 19100 19100 19100
Total 26800 26800 26800 26800 26800
Section-II : Kms = 22.000 - 35.050, = 13.050 Km
12660 12800 EMB 3rd 140 140 140
13000 13070 C&G 70
13070 13170 Emb 5 th layer 100 100 100
13350 13500 SG 1st 150 150 150 150
13500 13700 Emb top 200 200 200
13700 13950 Emb 5 th layer 250 250 250
13950 14400 Emb 2 nd 450 450 450
14400 14700 C&G 300
14700 15300 Emb 2 nd 600 600 600
19400 20300 C&G 900
20800 21200 Emb TOP 400 400 400
21200 21560 S.G 1 st 360 360 360 360
22080 22400 Emb 4 th layer 320 320 320
22400 22450 WMM TOP 50 50 50 50 50
22450 22950 DBM 500 500 500 500 500
22950 22970 WMM 1st 20 20 20 20 20
23060 23070 WMM 1st 10 10 10 10 10
23070 23270 DBM 200 200 200 200 200
23270 23380 WMM 1st 110 110 110 110 110
23380 23780 DBM 400 400 400 400 400
23780 23800 WMM 1st 20 20 20 20 20
23800 24100 WMM TOP 300 300 300 300 300
24350 24700 DBM 350 350 350 350 350
24700 24730 SG Top 30 30 30 30
24780 24810 GSB top 30 30 30 30 30
24810 25080 WMM TOP 270 270 270 270 270
25080 25150 GSB top 70 70 70 70 70
25150 25400 C&G 250
25400 25850 S.G 1 st 450 450 450 450
26100 26300 WMM TOP 200 200 200 200 200
26360 26900 WMM TOP 540 540 540 540 540
26920 26950 SG Top 30 30 30 30
26950 27000 Emb top 50 50 50
27000 27100 GSB top 100 100 100 100 100
27100 27570 DBM 470 470 470 470 470
27570 27600 WMM TOP 30 30 30 30 30
27600 27650 GSB top 50 50 50 50 50
27650 27700 Emb Top 50 50 50
27700 27800 Emb 6th 100 100 100
28800 28870 S.G 2 nd 70 70 70
10
28870 29270 DBM 400 400 400 400 400
29270 29330 WMM 1st 60 60 60 60 60
29380 29700 DBM 320 320 320 320 320
29700 29810 WMM 1st 110 110 110 110 110
29810 30080 DBM 270 270 270 270 270
30080 30100 WMM TOP 20 20 20 20 20
30150 31300 WMM TOP 1150 1150 1150 1150 1150
31340 31400 GSB top 60 60 60 60 60
31400 31840 DBM 440 440 440 440 440
31840 31850 WMM TOP 10 10 10 10 10
31850 32330 WMM TOP 480 480 480 480 480
32330 34130 DBM 1800 1800 1800 1800 1800
34130 34150 WMM TOP 20 20 20 20 20
44000 44040 BC 40 40 40 40 40
44040 44310 BM 270 270 270 270 270
44400 44530 BM 130 130 130 130 130
44600 44900 BM 300 300 300 300 300
44900 45200 BC 300 300 300 300 300
64300 64430 BM 130 130 130 130 130
64430 66330 BC 1900 1900 1900 1900 1900
66330 66380 BM 50 50 50 50 50
66380 66400 WMM TOP 20 20 20 20 20
66400 66450 WMM 1st 50 50 50 50 50
66450 66500 GSB top 50 50 50 50 50
Total 17370 15850 15850 13120 12100
Overall Total 44170 42650 42650 39920 38900

11
ar Progress As on 15.07.2017
RIGHT HAND SIDE
Kms 36.300-44.000,45.200-64.300 = 26.800 Km

WMM I WMM Top BM DBM BC

7700 7700 7700 7700 7700


19100 19100 19100 19100 19100
26800 26800 26800 26800 26800
Kms = 22.000 - 35.050, = 13.050 Km

50 50
500 500 500
20
10
200 200 200
110
400 400 400
20
300 300
350 350 350

270 270

200 200
540 540

470 470 470


30 30

12
400 400 400
60
320 320 320
110 110
270 270 270
20 20
1150 1150

440 440 440


10 10
480 480
1800 1800 1800
20 20
40 40 40 40 40
270 270 270
130 130 130
300 300 300
300 300 300 300 300
130 130 130
1900 1900 1900 1900 1900
50 50 50
20 20
50

11740 11470 3120 7390 2240


38540 38270 29920 34190 29040

13
C&G Excavat-io Embank-mSG Top GSB WMM I WMM Top BM
section 1 lhs 27470 26020 26020 25270 24850 24430 24240 23710
rhs 28300 28110 28110 26770 26010 25850 25710 25020
total 55770 54130 54130 52040 50860 50280 49950 48730

section 2 lhs 5060 5060 4310 3910 3210 3210 3180 3180
rhs 5190 5160 5160 3530 3480 3480 3480 3240
total 10250 10220 9470 7440 6690 6690 6660 6420

B/S COMPLETED

half width sec 1 sec 2


dbm 5070 450 as on 31-3-2016
bm 3690 2160
wmm 4390 2400
gsb 5100 2430
BC 3800 800

590 580 580 280

CHECK
SEC 1 SEC 2 TOTAL
23705 2355 26060
24365 3210 27575
24975 3330 28305
25430 3345 28775
20860 2200 23060
690 680 580 570
18740 18640 17510 14550

DBM BC
23190 21140
24220 20580 21440 21340 21080 18400 15060
47410 41720 1000 1000 1000 1000 1000

19840 19740 18620 16570


2380 2140
2330 2260
4710 4400
1800 2130 2130 2130 2130 section 2
BC gsb wmm top bm dbm
18960 22880 22780 22520 21170 ..4lane

16530 16130 15280 8695

18140 17770 17120 12160


SHANKARPALLY TO SHADNAGAR

SECTION 1
36.300 44.000 7.700
45.200 62.200 17.000
62.350 64.300 1.950
62.200 62.350 0.150
26.800
SECTION 2
12.540 16.200 3.660
17.090 30.780 13.690
30.940 35.050 4.110
44.000 45.200 1.200
64.300 68.486 4.186
30.780 30.940 0.160
TOTAL 27.006
B/S COMPL
C&G Excavat-io Embank-mSG Top GSB WMM I WMM Top BM
section 1 lhs 26800 26800 26800 26800 26800 26800 26800 26800
rhs 26800 26800 26800 26800 26800 26800 26800 26800
total 53600 53600 53600 53600 53600 53600 53600 53600

section 2 lhs 15540 13680 13680 11240 9510 8620 7930 2610
rhs 15820 14400 14400 11580 9380 9060 8640 3120
total 31360 28080 28080 22820 18890 17680 16570 5730

B/S COMPLETED

half width sec 1 sec 2


dbm 0 3010 as on 30.04.17
bm 0 1530
wmm 0 1050
gsb 0 1530
BC 0 760

9.5
690 680 580 570
18740 18640 17510 14550

DBM BC
26800 26800
26800 26800
53600 53600

7150 2260
6640 2240
13790 4500
1870 8680 7760 2100 5390 sec 2
BC gsb wmm top bm dbm
26800 26800 26800 26800 26800 sec 1
C&G Excavat-io Embank-mSG Top GSB WMM I WMM Top BM
section 1 lhs 26800 26800 26800 26800 26800 26800 26800 26800
rhs 26800 26800 26800 26800 26800 26800 26800 26800
total 53600 53600 53600 53600 53600 53600 53600 53600

section 2 lhs 16800 15440 15440 12520 10680 10530 10340 2610
rhs 17370 15850 15850 13120 12100 11740 11470 3120
total 34170 31290 31290 25640 22780 22270 21810 5730

B/S COMPLETED

half width sec 1 sec 2


dbm 0 4270 as on 30.06.17
bm 0 1530
wmm 0 4870
gsb 0 5420
BC 0 760

9.5
690 680 580 570
18740 18640 17510 14550

DBM BC
26800 26800
26800 26800
53600 53600

8360 2260
7390 2240
15750 4500
1870 8680 8470 2100 5740 sec 2
BC gsb wmm top bm dbm
26800 26800 26800 26800 26800 sec 1
24130 24350 WMM 1st

44000 44040 BC
44040 44310 BM
44400 44530 BM
44600 44900 BM
44900 45200 BC
64300 64430 BM
64430 66330 BC
44800 44850 BM 66330 66380 BM
44850 45200 BC 66380 66400 WMM TOP
64300 64430 BM 66400 66450 WMM 1st
64430 66300 BC 66450 66500 GSB top
66300 66400 BM
66400 66500 SG TOP
from to gsb wmm bm dbm bc
22400 22450 GSB top 50
22450 22950 wmm 500 500
23070 23270 WMM TOP 200 200
23380 23780 WMM TOP 400 400
23900 24350 WMM TOP 450 450
24350 24700 dbm 350 350 350
24780 24810 GSB top 30
24810 25080 WMM TOP 270 270
27100 27550 DBM 450 450 450
29400 29700 DBM 300 300 300
29800 30070 DBM 270 270 270
30150 30300 wmm 150 150
31000 31300 wmm 300 300
31400 31800 DBM 400 400 400
32300 32330 GSB top 30
32340 34100 DBM 1760 1760 1760
34100 34150 WMM Top 50 50
44000 44040 BC 40 40 40 40 40
44040 44110 BM 70 70 70
44110 44140 WMM 1st 30 30
44800 44850 BM 50 50 50
44850 44900 BM 50 50 50
44900 45200 BC 300 300 300 300 300
64300 64430 BM 130 130 130
64430 66300 BC 1870 1870 1870 1870 1870
66300 66380 BM 80 80 80
8580 8470 2590 5740 2210
-100

6600 6100 2590 4820 2210


Linear Progress Section-II Complte

BC

DBM

BM

WMM

GSB

Earth Work

0 5000 10000 15000 20000


Complted length Vs Revised Project Length

10000 15000 20000 25000 30000


Description of Item
Earth Work
GSB
WMM
BM
DBM
BC
Total Length Completed length % of Completed 28080 14040
27006 15645 58% 18890 9445
27006 11390 42% 16570 8285
27006 10905 40% 5730 2865
5386 2865 53% 13790 6895
27006 7875 29% 4500 2250
27006 2250 8%

16360
14770
EW 14770
GSB 11325
WMM 9645
BM 2865
DBM 7700
BC 2250