Professional Documents
Culture Documents
Flow Chart PTW
Flow Chart PTW
Main contractor MEP Dept receives the power The safety dept verifies all the control measures
on notification, verify the supporting documents mentioned the permit is fulfilled. Watch man is posted to
and approve the permit to power on ensure only authorized person enters the live area by
maintaining a log book.