Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

This changes was due to embrace the requirement from DOSH Malaysia.

Whereas, based on DOSH


Regulation 1970, Clause Para. 72 Hydrostatic Test:

Thus fulfilling this requirement, we introduce RT-2 so that we can carry out radiographic test as per
code.

Also, if we did’nt carry out the Radiographed test there will be potential failure during HT. This failure
we want to avoid as it will leads to more repairing activity work.

You might also like