Assignment 2018
Date of issue: - 23rd July 2018 Date of Submission: - 31st August 2018
Scope of Work: -
1) Do total project planning including construction equipments and decide time
for each activity?
2) Prepare detailed equipment planning for Concreting (Shotcrete)
3) Assume purchasing of Concrete Pumps of suitable size and prepare detailed
purchasing recommendations? You are required to do –
a. Identify technical parameters for above equipment (Minimum 5 Nos)
and suggest how these can be quantified.
b. Find out Output per hour, per day, per month. You have to include at
least 2 methods. One Analytical from a Text/ Handbook and One
Empirical/Practical.
c. Obtain Quotations with term and conditions and literature from 2 to 3
dealers/ manufactures. (One is minimum). At least 1 should be Indian
Manufacturer/dealer. Using model parameters developed by you at (a)
above, recommend for purchase from one supplier with reasons.
d. Estimate cost of above given activity.
Note: -
1) The source used for estimating output shall be clearly mentioned.
2) As most of the major equipments manufacturers have branches/dealers in
Mumbai/Pune, and have web sites, the Literature/Quotations from 1 Indian
Manufacturer is essential. If any group is not able to collect the
literature/quotations, they can contact Prof. B. L. Rajput. For use of
readymade literature suitable reduction of marks will be done.
3) You have to submit a typed copy.
Group