Professional Documents
Culture Documents
Social Roi
Social Roi
Social Roi
The social for ROI can contribute for economy growth and income to Klang district.
• Total area bridge 70 x 24 = 1728 m2
• @ RM 50/sq meter = RM
• Duration = 20 years
SOLAR PANEL
• 12kW – RM 144,000
• RM 144,000 x 52 = RM 7,488,000
• RM 2,000 x 52 = RM 104,000
RETURN ON INVESTMENT (ROI)