Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 21

Nabakumar Khan

Survey Specialist

Curriculum Vitae (CV) For Proposed Key Staff

1. Proposed Position : Sr. Survey Engineer


2. Name of Staff : NABAKUMAR KHAN
3. Date of Birth : 22 Oct 1972 (Proof attached)
4 Nationality : Indian
5. Educational Qualification: (Proof attached)
 Bachelor of Technology in Civil (Construction Management): 2008, Indira Gandhi
National Open University.
 Diploma in Survey Engineering: 1993, West Bengal Survey Institute Bandel,
State Council for Engineering and Technical Education, West Bengal.

Contact Address with Phone and mobile numbers:


 29/C, M.C. Lahiri Street, Serampore, Hooghly, West Bengal,
Pin-712201; Mob: +91-9230589125

Countries of Work Experience:


 India, Myanmar

6. Membership of Professional Societies: Nil

7. Publication: Nil

8. Employment Record:

Companies Details
S. Company Name From Year To Year Nos. of Rel. Projects
Nos. completed
1 RITES Ltd. NEW DELHI (A 25/12/1998 30/08/2005 8
Govt. of India enterprise)
2 New Horizon Consultancy 22/09/2005 Till date 30
Services

List of few projects on which the Person has worked:

Curriculum Vitae of Nabakumar Khan Page 1


Nabakumar Khan
Survey Specialist

Sl.# Name of work Clien Designa Start Completi Count Task Details
t tion Date on Date ry
1 Survey of designated RITES Survey 04/01/1994 30/08/2005 India Task includes use of modern
service road on both Engineer survey methods using Total
side of Westerly Station and presentation of
Diversion of Pune survey information based on
Bypass, 34 km NH-4 digital terrain modelling
in the state of preparation and validation of
Maharashtra the survey data of the as built
drawing and transfer of all
the ground features on the
drawings etc. Was
responsible for fixing of
alignment at site, final setting
out, estimation of quantities
for various items of works,
etc. for DPR.
2 Survey & Final RITES Survey 04/01/1994 30/08/2005 India Task includes conducting
marking of Centerline Ltd Engineer and organizing topographic
layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.

3 Feasibility study & RITES Survey 04/01/1994 30/08/2005 India Task includes conducting
supervision of details Ltd Engineer and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
to Raxaul & Survey Control Center for
Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing
drawings and transfer of all the ground
features on the drawings etc.
for Feasibility and
Preliminary Study.
4 Feasibility study & RITES Survey 04/01/199 30/08/2005 Myanma Task includes conducting
supervision of details Ltd Engineer 4 r and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in

Curriculum Vitae of Nabakumar Khan Page 2


Nabakumar Khan
Survey Specialist

to Raxaul & Survey Control Center for


Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing
drawings and transfer of all the ground
features on the drawings etc.
for DPR
5 Survey & Final RITES Survey 04/01/199 30/08/2005 India Task includes conducting
marking of Centerline Ltd Engineer 4 and organizing topographic
layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings
etc.; As Senior Technical
Assistant Task assign
includes conducting and
organizing topographic
surveys using GPS, Total
Station and other latest
survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.
6 Feasibility study & RITES Survey 04/01/199 30/08/2005 India Task includes conducting
supervision of details Ltd Engineer 4 and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
to Raxaul & Survey Control Center for
Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing
drawings and transfer of all the ground
features on the drawings etc.
for DPR.

7 Survey & Final RITES Survey 04/01/199 30/08/2005 India Task includes conducting

Curriculum Vitae of Nabakumar Khan Page 3


Nabakumar Khan
Survey Specialist

marking of Centerline Ltd Engineer 4 and organizing topographic


layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.
8 Feasibility study & RITES Survey 04/01/199 30/08/2005 India Task includes conducting
supervision of details Ltd Engineer 4 and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
to Raxaul & Survey Control Center for
Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing
drawings and transfer of all the ground
features on the drawings etc.
for DPR.
9 Survey & Final RITES Survey 04/01/199 30/08/2005 India Task includes conducting
marking of Centerline Ltd Engineer 4 and organizing topographic
layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.
10 Feasibility study & RITES Survey 04/01/199 30/08/2005 India Task includes conducting
supervision of details Ltd Engineer 4 and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
to Raxaul & Survey Control Center for
Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing

Curriculum Vitae of Nabakumar Khan Page 4


Nabakumar Khan
Survey Specialist

drawings and transfer of all the ground


features on the drawings etc.
for DPR.
11 Survey & Final RITES Survey 04/01/199 30/08/2005 Myanma Task includes conducting
marking of Centerline Ltd Engineer 4 r and organizing topographic
layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for Feasibility and
Preliminary Study.
12 Feasibility study & SAI Senior 22/09/200 08/01/2017 India Task includes
supervision of details Consu Survey 5 reconnaissance survey;
topographic survey for lting Engineer Planning, preparation,
up gradation & Engin execution and monitoring of
rehabilitation of eer-s topographical survey on
existing road to NH Pvt. ground including data
standard of Motihari Ltd analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
13 Survey & final Stanle Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline y Survey 5 reconnaissance survey;
layout of NH sections Consu Engineer Planning, preparation,
(500 km) in the State ltants execution and monitoring of
of Gujarat India topographical survey on
Privat ground including data
e analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team

Curriculum Vitae of Nabakumar Khan Page 5


Nabakumar Khan
Survey Specialist

Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR
14 Feasibility study & Xplore Senior 22/09/200 08/01/2017 India Task includes
supervision of details r Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points for DPR.
feasibility & PPR
drawings
15 Survey & final RITES Senior 22/09/200 08/01/2017 India Task assign includes
marking of Centerline Ltd Survey 5 reconnaissance survey;
layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
16 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on

Curriculum Vitae of Nabakumar Khan Page 6


Nabakumar Khan
Survey Specialist

existing road to NH ground including data


standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
17 Survey & final RITES Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Ltd Survey 5 reconnaissance survey;
layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Feasibility and
Preliminary Study.
18 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing

Curriculum Vitae of Nabakumar Khan Page 7


Nabakumar Khan
Survey Specialist

funded by MEA. I also and setting up of control


assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
19 Survey & final RITES Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Ltd Survey 5 reconnaissance survey;
layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Feasibility and
Preliminary Study.
20 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points for DPR.
feasibility & PPR
drawings
21 Survey & final RITES Senior 22/09/200 08/01/2017 India Task assign includes

Curriculum Vitae of Nabakumar Khan Page 8


Nabakumar Khan
Survey Specialist

marking of Centerline Ltd Survey 5 reconnaissance survey;


layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
22 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task assign includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points for DPR.
feasibility & PPR
drawings
23 Survey & final RITES Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Ltd Survey 5 reconnaissance survey;
layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
24 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey

Curriculum Vitae of Nabakumar Khan Page 9


Nabakumar Khan
Survey Specialist

Forbesganj to Jogbani Control Centre for digital


sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR
25 Survey & final AARV Senior 22/09/200 08/01/2017 India Task assign includes
marking of Centerline E-E Survey 5 reconnaissance survey;
layout of NH sections Consu Engineer Planning, preparation,
(500 km) in the State lt-ant execution and monitoring of
of Gujarat Ltd topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports.: DPR
26 Feasibility study & Ashok Senior 22/09/200 08/01/2017 India Task includes
supervision of details a Survey 5 reconnaissance survey;
topographic survey for Buildc Engineer Planning, preparation,
up gradation & o-n execution and monitoring of
rehabilitation of Ltd topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of

Curriculum Vitae of Nabakumar Khan Page 10


Nabakumar Khan
Survey Specialist

highway section requiring


geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Project Execution.
27 Survey & final Centur Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline y Survey 5 reconnaissance survey;
layout of NH sections Ceme Engineer Planning, preparation,
(500 km) in the State nt execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
28 Feasibility study & Gifford Senior 22/09/200 08/01/2017 India Task includes
supervision of details India Survey 5 reconnaissance survey;
topographic survey for Ltd Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
29 Survey & final Gifford Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline India Survey 5 reconnaissance survey;
layout of NH sections Ltd Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey

Curriculum Vitae of Nabakumar Khan Page 11


Nabakumar Khan
Survey Specialist

Control Centre for digital


Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
30 Feasibility study & Gifford Senior 22/09/200 08/01/2017 India Task includes
supervision of details India Survey 5 reconnaissance survey;
topographic survey for Pvt. Engineer Planning, preparation,
up gradation & Ltd execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
31 Survey & final ILFS Senior 22/09/200 08/01/2017 Nepal Task includes Preparation of
marking of Centerline Survey 5 Digital Terrain Model, Assist
layout of NH sections Engineer Team Leader in Identification
(500 km) in the State of highway section requiring
of Gujarat geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader

Curriculum Vitae of Nabakumar Khan Page 12


Nabakumar Khan
Survey Specialist

in preparation of various
reports. reconnaissance
survey; Planning,
preparation, execution and
monitoring of topographical
survey on ground including
data analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
32 Feasibility study & L&T Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ramb Survey 5 reconnaissance survey;
topographic survey for oll Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also for DPR.
assisted to prepare
feasibility & PPR
drawings
33 Survey & final L&T Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Ramb Survey 5 reconnaissance survey;
layout of NH sections oll Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
34 Feasibility study & Larse Senior 22/09/200 08/01/2017 India Task includes
supervision of details n& Survey 5 reconnaissance survey;
topographic survey for Toubr Engineer Planning, preparation,
up gradation & o execution and monitoring of
rehabilitation of Limite topographical survey on
existing road to NH d ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in

Curriculum Vitae of Nabakumar Khan Page 13


Nabakumar Khan
Survey Specialist

preparation of Strip Plan,


Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
35 Responsible for final Louis Senior 22/09/200 08/01/2017 India Task assign includes
marking of Centerline Berger Survey 5 reconnaissance survey;
layout of NH sections Group Engineer Planning, preparation,
(500 km) in the State Inc. execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
36 Feasibility study & Louis Senior 22/09/200 08/01/2017 India Task includes
supervision of details Berger Survey 5 reconnaissance survey;
topographic survey for Group Engineer Planning, preparation,
up gradation & Inc. execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Feasibility and
Preliminary Study.

Curriculum Vitae of Nabakumar Khan Page 14


Nabakumar Khan
Survey Specialist

37 Responsible for final Louis Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Berger Survey 5 reconnaissance survey;
layout of NH sections Group Engineer Planning, preparation,
(500 km) in the State Inc. execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric: Feasibility and
Preliminary Study.
38 Feasibility study & Louis Senior 22/09/200 08/01/2017 India Task includes
supervision of details Berger Survey 5 reconnaissance survey;
topographic survey for Group Engineer Planning, preparation,
up gradation & Inc. execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Feasibility and
Preliminary Study.
39 Survey & final Louis Senior 22/09/200 08/01/2017 India Task includes conducting
marking of Centerline Berger Survey 5 and organizing topographic
layout of NH sections Group Engineer surveys using GPS, Total
(500 km) in the State Inc. Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.

Curriculum Vitae of Nabakumar Khan Page 15


Nabakumar Khan
Survey Specialist

for DPR.
40 Feasibility study & Louis Senior 22/09/200 08/01/2017 India Task includes
supervision of details Berger Survey 5 reconnaissance survey;
topographic survey for Group Engineer Planning, preparation,
up gradation & Inc. execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
41 Survey & final Rajpat Senior 22/09/200 08/01/2017 India Task includes conducting
marking of Centerline h Survey 5 and organizing topographic
layout of NH sections Engin Engineer surveys using GPS, Total
(500 km) in the State e-ers Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for a number of highways
and other infrastructure
projects. During supervision
of highways projects, was
responsible for fixing of
alignment at site, checking
the final setting out, assist
the Quantity Surveyor in
estimation of quantities for
various items of works, etc.
Imparted training to junior
surveyors for DPR.
42 Feasibility study & RITES Survey 04/01/1994 30/08/2005 India Task includes use of modern
supervision of details Engineer survey methods using Total
topographic survey for Station and presentation of
up gradation & survey information based on
rehabilitation of digital terrain modelling

Curriculum Vitae of Nabakumar Khan Page 16


Nabakumar Khan
Survey Specialist

existing road to NH preparation and validation of


standard of Motihari the survey data of the as built
to Raxaul & drawing and transfer of all
Forbesganj to Jogbani the ground features on the
sections in Bihar drawings etc. Was
funded by MEA. I also responsible for fixing of
assisted to prepare alignment at site, final setting
feasibility & PPR out, estimation of quantities
drawings for various items of works,
etc. for DPR.

9. Summary of the CV

A) Education:
(i) Diploma in Survey Engineering: 1993, West Bengal Survey Institute Bandel,
State Council for Engineering and Technical Education, West Bengal.
(ii) Bachelor of Technology in Civil (Construction Management): 2008, Indira Gandhi
National Open University.

B) Experience:

i) Total Experience in Highways: 25 Years

ii) Responsibilities held: i) Survey Engineer/Sr. survey Engineer


- 25 Yrs.
.
iii) Relevant Experience: 25 Yrs.

C) Permanent Employment with the Firm: No; Available for assignment

Certification:

1. I am willing to work on the project and I will be available for entire duration of the
project assignment and I will not engage myself in any other assignment during the
currency of this assignment on the project.

2. I, the undersigned, certify that to the best of my knowledge and belief, this bio
data correctly describes myself, my qualification and my experience.

Signature of the Candidate:

Place:
Date:

Curriculum Vitae of Nabakumar Khan Page 17


Nabakumar Khan
Survey Specialist

UNDERTAKING FROM THE PROFESSIONAL

I, Nabakumar Khan of 29/C, M.C. Lahiri Street, Serampore, Hooghly, Pin-712201, W.B,
India have not left any assignment with the consultants engaged by MORT&H /
contracting firm (firm to be supervised now) for any continuing works of MORT&H
without completing my assignment. I will be available for the entire duration of the
current project “Consultancy Services for Consultancy Services for carrying out
feasibility study and detailed project preparation for Redesigning, Rehabilitation
and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the
State of Himachal Pradesh for Package No.:-HP/Shimla/R34Sml of Tentative
Length 153 Km”. If I leave this assignment in the middle of the completion of the
work, I may be debarred for an appropriate period to be decided by MORTH. I have also
no objection if my services are extended by MORTH for this work in future.

Nabakumar Khan
(Signature of key personnel)

UNDERTAKING FROM CONSULTING FIRM

The undersigned on behalf of Xplorer Consultancy Services Pvt. Ltd., Gurgaon,


Haryana, India certify that Sh. Nabakumar Khan of 29/C, M.C. Lahiri Street, Serampore,
Hooghly, Pin-712201,W.B, India to the best of our knowledge has not left his assignment
with any other consulting firm engaged by MORT&H / contracting firm (firm to be
supervised now) for the on-going projects. We understand that if the information about
leaving the past assignment with MORTH without completing his assignment is known to
MoRTH, MoRTH would be at liberty to remove the personnel from the present
assignment and debar him for an appropriate period to be decided by MoRTH.

Angshuman Chattopadhyay
(Signature of Authorized Representative of Firm)
M/s Xplorer Consultancy Services Pvt. Ltd., Gurgaon

Curriculum Vitae of Nabakumar Khan Page 18


Nabakumar Khan
Survey Specialist

Curriculum Vitae of Nabakumar Khan Page 19


Nabakumar Khan
Survey Specialist

Curriculum Vitae of Nabakumar Khan Page 20


Nabakumar Khan
Survey Specialist

Curriculum Vitae of Nabakumar Khan Page 21

You might also like