Professional Documents
Culture Documents
Naba Sr. Survey ShimlaRetend
Naba Sr. Survey ShimlaRetend
Naba Sr. Survey ShimlaRetend
Survey Specialist
7. Publication: Nil
8. Employment Record:
Companies Details
S. Company Name From Year To Year Nos. of Rel. Projects
Nos. completed
1 RITES Ltd. NEW DELHI (A 25/12/1998 30/08/2005 8
Govt. of India enterprise)
2 New Horizon Consultancy 22/09/2005 Till date 30
Services
Sl.# Name of work Clien Designa Start Completi Count Task Details
t tion Date on Date ry
1 Survey of designated RITES Survey 04/01/1994 30/08/2005 India Task includes use of modern
service road on both Engineer survey methods using Total
side of Westerly Station and presentation of
Diversion of Pune survey information based on
Bypass, 34 km NH-4 digital terrain modelling
in the state of preparation and validation of
Maharashtra the survey data of the as built
drawing and transfer of all
the ground features on the
drawings etc. Was
responsible for fixing of
alignment at site, final setting
out, estimation of quantities
for various items of works,
etc. for DPR.
2 Survey & Final RITES Survey 04/01/1994 30/08/2005 India Task includes conducting
marking of Centerline Ltd Engineer and organizing topographic
layout of NH sections surveys using GPS, Total
(500 km) in the State Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.
3 Feasibility study & RITES Survey 04/01/1994 30/08/2005 India Task includes conducting
supervision of details Ltd Engineer and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
to Raxaul & Survey Control Center for
Forbesganj to Jogbani digital Terrain Modeling,
sections in Bihar interpretation of air photo and
funded by MEA. I also satellite images, checking
assisted to prepare and validation of the survey
feasibility & PPR data of the as built drawing
drawings and transfer of all the ground
features on the drawings etc.
for Feasibility and
Preliminary Study.
4 Feasibility study & RITES Survey 04/01/199 30/08/2005 Myanma Task includes conducting
supervision of details Ltd Engineer 4 r and organizing topographic
topographic survey for surveys using GPS, Total
up gradation & Station and other latest
rehabilitation of survey equipment,
existing road to NH preparation of strip plans,
standard of Motihari processing of survey data in
7 Survey & Final RITES Survey 04/01/199 30/08/2005 India Task includes conducting
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR
14 Feasibility study & Xplore Senior 22/09/200 08/01/2017 India Task includes
supervision of details r Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points for DPR.
feasibility & PPR
drawings
15 Survey & final RITES Senior 22/09/200 08/01/2017 India Task assign includes
marking of Centerline Ltd Survey 5 reconnaissance survey;
layout of NH sections Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
16 Feasibility study & RITES Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ltd Survey 5 reconnaissance survey;
topographic survey for Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
in preparation of various
reports. reconnaissance
survey; Planning,
preparation, execution and
monitoring of topographical
survey on ground including
data analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
32 Feasibility study & L&T Senior 22/09/200 08/01/2017 India Task includes
supervision of details Ramb Survey 5 reconnaissance survey;
topographic survey for oll Engineer Planning, preparation,
up gradation & execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also for DPR.
assisted to prepare
feasibility & PPR
drawings
33 Survey & final L&T Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Ramb Survey 5 reconnaissance survey;
layout of NH sections oll Engineer Planning, preparation,
(500 km) in the State execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points for DPR.
34 Feasibility study & Larse Senior 22/09/200 08/01/2017 India Task includes
supervision of details n& Survey 5 reconnaissance survey;
topographic survey for Toubr Engineer Planning, preparation,
up gradation & o execution and monitoring of
rehabilitation of Limite topographical survey on
existing road to NH d ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
37 Responsible for final Louis Senior 22/09/200 08/01/2017 India Task includes
marking of Centerline Berger Survey 5 reconnaissance survey;
layout of NH sections Group Engineer Planning, preparation,
(500 km) in the State Inc. execution and monitoring of
of Gujarat topographical survey on
ground including data
analysis/ processing of
survey data in Survey
Control Centre for digital
Terrain Modeling processing
and setting up of control
points; Preparation of Digital
Terrain Model, Assist Team
Leader in Identification of
highway section requiring
geometric: Feasibility and
Preliminary Study.
38 Feasibility study & Louis Senior 22/09/200 08/01/2017 India Task includes
supervision of details Berger Survey 5 reconnaissance survey;
topographic survey for Group Engineer Planning, preparation,
up gradation & Inc. execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for Feasibility and
Preliminary Study.
39 Survey & final Louis Senior 22/09/200 08/01/2017 India Task includes conducting
marking of Centerline Berger Survey 5 and organizing topographic
layout of NH sections Group Engineer surveys using GPS, Total
(500 km) in the State Inc. Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for DPR.
40 Feasibility study & Louis Senior 22/09/200 08/01/2017 India Task includes
supervision of details Berger Survey 5 reconnaissance survey;
topographic survey for Group Engineer Planning, preparation,
up gradation & Inc. execution and monitoring of
rehabilitation of topographical survey on
existing road to NH ground including data
standard of Motihari analysis/ processing of
to Raxaul & survey data in Survey
Forbesganj to Jogbani Control Centre for digital
sections in Bihar Terrain Modeling processing
funded by MEA. I also and setting up of control
assisted to prepare points; Preparation of Digital
feasibility & PPR Terrain Model, Assist Team
drawings Leader in Identification of
highway section requiring
geometric improvement,
identification of available
alignment option for bypass;
transfer the surveyed
alignment on to the ground
by fixing reference
pillars/BMs; Assist in
preparation of Strip Plan,
Alignment Plan and L.A.
plan; Assist the team leader
in preparation of various
reports for DPR.
41 Survey & final Rajpat Senior 22/09/200 08/01/2017 India Task includes conducting
marking of Centerline h Survey 5 and organizing topographic
layout of NH sections Engin Engineer surveys using GPS, Total
(500 km) in the State e-ers Station and other latest
of Gujarat survey equipment,
preparation of strip plans,
processing of survey data in
Survey Control Center for
digital Terrain Modeling,
interpretation of air photo and
satellite images, checking
and validation of the survey
data of the as built drawing
and transfer of all the ground
features on the drawings etc.
for a number of highways
and other infrastructure
projects. During supervision
of highways projects, was
responsible for fixing of
alignment at site, checking
the final setting out, assist
the Quantity Surveyor in
estimation of quantities for
various items of works, etc.
Imparted training to junior
surveyors for DPR.
42 Feasibility study & RITES Survey 04/01/1994 30/08/2005 India Task includes use of modern
supervision of details Engineer survey methods using Total
topographic survey for Station and presentation of
up gradation & survey information based on
rehabilitation of digital terrain modelling
9. Summary of the CV
A) Education:
(i) Diploma in Survey Engineering: 1993, West Bengal Survey Institute Bandel,
State Council for Engineering and Technical Education, West Bengal.
(ii) Bachelor of Technology in Civil (Construction Management): 2008, Indira Gandhi
National Open University.
B) Experience:
Certification:
1. I am willing to work on the project and I will be available for entire duration of the
project assignment and I will not engage myself in any other assignment during the
currency of this assignment on the project.
2. I, the undersigned, certify that to the best of my knowledge and belief, this bio
data correctly describes myself, my qualification and my experience.
Place:
Date:
I, Nabakumar Khan of 29/C, M.C. Lahiri Street, Serampore, Hooghly, Pin-712201, W.B,
India have not left any assignment with the consultants engaged by MORT&H /
contracting firm (firm to be supervised now) for any continuing works of MORT&H
without completing my assignment. I will be available for the entire duration of the
current project “Consultancy Services for Consultancy Services for carrying out
feasibility study and detailed project preparation for Redesigning, Rehabilitation
and Up-gradation to 2-lane/2-lane with paved shoulders or its strengthening in the
State of Himachal Pradesh for Package No.:-HP/Shimla/R34Sml of Tentative
Length 153 Km”. If I leave this assignment in the middle of the completion of the
work, I may be debarred for an appropriate period to be decided by MORTH. I have also
no objection if my services are extended by MORTH for this work in future.
Nabakumar Khan
(Signature of key personnel)
Angshuman Chattopadhyay
(Signature of Authorized Representative of Firm)
M/s Xplorer Consultancy Services Pvt. Ltd., Gurgaon