Work and Financial Plan of the Activities Undertaken Through Job Order

Date

Location: ______________
Duration: ______________
Start Date: ______________

Activity Cost in PhP
rd
1. Install new pantry in the former ITU Room, 3  Floor

2. Works to prepare the elevator landing areas:

nd
I. 2  Floor Briefing Room

a) Dismantle of wall/dividers
b) Remove door and glass panel

rd
II. 3  Floor Pantry and Audio Room
c) Dismantle wall/dividers
d) Remove doors
e) Replace door (located near the pantry) with wall

nd
III. 2  Floor Garage Building
f) Replace and install doors using the doors removed in I and II

3. Construct 2 pumphouses

4. Construct 1 steel cover for the manway of the rainwater tank (located near the generator)

Total

Notes:
1. A meeting will be conducted to finalize the activities before commencement.
2. Tools and equipment shall be provided by the contractor.
3. Payment shall be made within 5 days after the issuance of the signed and acceptance inspection report prepared by the Building Committee.
Prepared: Noted: Conforme: Approved: