Download as pdf
Download as pdf
You are on page 1of 2
| exTERNAL concnere ONT “he external concrete joint cat by pouring mortar into a cflering frm tobe et ‘oni. the steel prs ae ver sty, they shall have to be rushed energetic, ‘he collering forms delvered with the piping elements are made of semvigé paste The coffering fox lad surround pipe surface. bfter the form has been pace, 2 readmit mortar (Slate resting PORTLAND ‘cement, sand and chorde-ee admtures) speed in Table shall be grouted lata t. Te compostion of mortar Table? 's a recommended by CM. Pipe (ONSHORE) Manuactrer. hal be hapected vsbally and aig hammer a ds aeycome defect or rack IFeome haneycomb defects or racks were foun, shall be repre. “Table2. Mortar Composition for External Concrete int onronents notre Weis Ylne ‘Photo 8. Pouring Mortar for outside pipe ont nse “TERNAL CONCRETE JOINT The interna concrete joint performed by appying mortar manly, the mortar Ting then smoothed Mush with the iner dhameter of pipe Inthe folowing way ‘nthe brash carefully apply 2 bonding primer olution on aha srfacos- either of meal (tel or concrete of the recesses tobe ile. This bandag aries solution ‘specified in Table 3. The compostion of bonding primer Tabled is as ‘recommended by CW. Pipe (ONSHORE) Manufacturer. ‘Table-3. Bonding Primes fo Internal Concrete Joint f z ‘ie 7 fen ‘pieresng ror Denes —[Oaasie Wak tithe primer gets tacky but not completly dry. ‘ready-mix mortar (Sulfate reiting PORTLAND cement, sand and cloidree ‘stres)speced in Tablet shal be grouted into The composition of mortar Tablet sas commenced by CW. Pipe (ONSHORE) Manufacture. Concrete ot Ifthe morta cohesion i not saifactory, I may be enhance by adding 15 ters of ‘lea pone of SKA FUME ‘ne mortar sal be placed in 3 stages: “Pstage One appation for Bonding (Se Table 3) "stage. After waiting fr sight hardning of mortar, appleaton ofthe filing ‘mortarin one or several passes. ‘yéstage ter suficent hardening time, one fal application shall be apled for smoothing the surface by 2 small trowel so as to wold haneyeomb/crack ifthe above mortar composition rot stable for smoothing surface, ue ony pure PORTLAND cements, Note: Minenum 2 haus is the interval hardening time in between ech yes 2 hours after casting the jit, thal be sounded with tle armen oder to check that it has not become separated from the steel endings. If sounds hollow, shall be Broken ad recat, The internal jot shall be sounded all {around but even more carauly nthe uppet prt where slump rsks re higher. 1.28 Coneete Repairing Work ‘When Cracks and/or damages during transportation and construction were fund, Concrete Repairing Werk shal be cndted In accordance withthe manufacturers procedure. [See ‘ttacent-§ Concrete Repatng Procedure) 1.29 Painting Work ‘The expoted steel pats such a¢ manholes and ftings hal be aited in accordance with the Imanufocturers procedure. (See Atachment3 Technical specication for Coating and Paints yes

You might also like