Professional Documents
Culture Documents
Homework - Day 1
Homework - Day 1
Homework - Day 1
1. (x + 5) (x + 4) 2. (x + 2)(x - 2)
= x2 + 9x + 20 = x2 - 4
5. (x + 9)(x + 3) 6. (4x - 1) ( x + 2)
= x2 + 12x + 27 = 4x2 + 7x - 2
Assessed Work 3 2 1
Method ~The Box Method is ~The Box Method is ~The Box Method is
clearly used to used to complete the used
complete the work work
Work ~All work is correct ~Most of the work is ~All work is shown
AND all work is correct AND all work
clearly shown is shown
Homework - Day 2
1. (x + 5) (x + 4) 2. (x + 2)(x - 2)
= x2 + 9x + 20 = x2 - 4
Assessed Work 3 2 1
Method ~The FOIL Method is ~The FOIL Method is ~The FOIL Method is
clearly used to used to complete the used
complete the work work
Work ~All work is correct ~Most of the work is ~All work is shown
AND all work is correct AND all work
clearly shown is shown
Homework -Day 3
You are an engineer who has to create a roller coaster for Six Flags. You need to create four
different loops to your roller coaster. Write 4 sets of polynomials to solve and plot on a graph.
The graph must clearly label all of the important information of your polynomial.
Assessed Work 3 2 1
Polynomials Plotted ~All points are clearly ~Most points are ~Some points are
on the Graph graphed AND are graphed AND are graphed
correct correct
Points on the graph ~All points are clearly ~Most points are ~Some points are
graphed and are graphed and are graphed
correct correct
Labeled Graph ~The graph is clearly ~The graph is clearly ~The graph is labeled
labeled AND has all labeled AND has
the necessary most of the
information necessary
information