Installation of 110 KV D/C Ohtl From 380/110 KV Khulais BSP To 110/13.8Kv S/S Gulf Salman Jeddah, Saudi Arabia Foundation Setting Plan
Installation of 110 KV D/C Ohtl From 380/110 KV Khulais BSP To 110/13.8Kv S/S Gulf Salman Jeddah, Saudi Arabia Foundation Setting Plan
Installation of 110 KV D/C Ohtl From 380/110 KV Khulais BSP To 110/13.8Kv S/S Gulf Salman Jeddah, Saudi Arabia Foundation Setting Plan
8KV S/S GULF SALMAN JEDDAH,
SAUDI ARABIA
FOUNDATION SETTING PLAN
TOWER TYPE "TT" (PAD & CHIMNEY) FD = 4.0M
(REF. WE ‐ 294348 R.0 SHT. 01 OF 01)
Hv 1293.6 793.6 + 500 (Ref. WE‐294347 SHT. 1 R.0) yb 42.4 Neutral axis
A C Tan (theta) Theta P L R H
NO. EXTENSION Actual b/b Projected b/b
(See Ref.) (See Ref.) Radian Degrees c/c dist. c/c diag. dist.
stub dist. stub dist.
1 BB+L2 6,630.00 6,905.00 0.1063 6.067 7,106.96 7,691.56 7,607.24 10,758.26
NOTES:
THETA = ATAN ((C ‐ A) / (2 * Hv)
P = A +2 * ( Hv + Hs ) * TAN (teta)
L = A +2 * ( Hv + Hf ) * TAN (teta)
R = L ‐ 2 * yb * COS (teta)
Hv = STUB VERTICAL HEIGHT
Hf = CHIMNEY VERTICAL HEIGHT TO G.L
Yb = STUB NEUTRAL AXIS