A Case Study in User Capacity Planning For Low Earth Orbit Communication Satellite

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

A CASE STUDY IN

USER CAPACITY PLANNING


FOR LOW EARTH ORBIT
COMMUNICATION SATELLITE

MAULANA ALI ARIFIN


(maulana.ali@lapan.go.id)
NOVA MARAS NURUL KHAMSAH
(nova.maras@lapan.go.id)
INTRODUCTION

Many rural areas


The need of communication is increasing
Terrestrial networks to cover all Indonesia will need enormous cost
PURPOSE
Design a LEO communication satellite to compliment terrestrial network in rural
area

Target user, business sector in rural areas:


• Tourism
• Hotel
• etc
METHODOLOGY
User capacity planning by throughput
• Throughput per session
𝑇ℎ𝑟𝑜𝑢𝑔ℎ𝑝𝑢𝑡
= 𝐵𝑒𝑎𝑟𝑒𝑟 𝑅𝑎𝑡𝑒 × 𝑃𝑃𝑃 𝑆𝑒𝑠𝑠𝑖𝑜𝑛 𝑇𝑖𝑚𝑒 × 𝑃𝑃𝑃 𝑆𝑒𝑠𝑠𝑖𝑜𝑛 𝐷𝑢𝑡𝑦 𝑅𝑎𝑡𝑖𝑜
𝑆𝑒𝑠𝑠𝑖𝑜𝑛
1
×
1 − 𝐵𝐿𝐸𝑅
• Single user throughput
𝑇ℎ𝑟𝑜𝑢𝑔ℎ𝑝𝑢𝑡
∑ 𝑥 𝐵𝐻𝑆𝐴 𝑥 𝑃𝑒𝑛𝑒𝑡𝑟𝑎𝑡𝑖𝑜𝑛 𝑅𝑎𝑡𝑒 𝑥 1 + 𝑃𝑒𝑎𝑘 𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝑅𝑎𝑡𝑖𝑜
𝑆𝑒𝑠𝑠𝑖𝑜𝑛
𝑆𝑈𝑇 =
3600
ANALYSIS RESULT

Network Throughput Comparison


60,000
50,000
40,000
30,000
20,000
10,000
-
Telesat Proposed Design of
Communication Satellite
Uplink (Kbps) Downlink (Kbps)
CONCLUSION

• The objective of this work was to calculate and analyze user


capacity for proposed design of communication satellite.
• From the calculation, the total users that can be served by
proposed communications satellite is lower than TELESAT LEO
where the total user of proposed communication satellite is
only 11% to 12% of the total user of TELESAT LEO.
• The proposed design has a good capability in the term of user
capacity which is up to 61% of total needs in Indonesia.

You might also like