Site Clearance Corrected
Site Clearance Corrected
INDEX
REVISION STATUS
CLAUSE DESCRIPTION
PAGE 0 A B C D
0.0 INDEX 1 X
1.0 GENERAL 2 X
2.0 REFERANCE 2 X
3.0 RESOURCES 2 X
3.1 EQUIPMENT 2 X
3.2 MANPOWER 2 X
4.0 FLOW CHART 2 X
5.0 SEQUENCE OF WORK 3 X
6.0 SUPERVISION 3 X
7.0 INSPECTION 3 X
8.0 TRAFFIC CONTROL 3 X
9.0 SAFETY PROVISION 4 X
10.0 ATTACHED FORMS 4 X
10.1 CHECK LIST 5 X
10.2 INSPECTION AND TEST PLAN 6 X
PREPARED BY
Site Engineer
(Signature)
Date:
REVIEWED BY
Materials Engineer
(Signature)
Date:
APPROVED BY
Contractor’s Representative
(Signature)
Date:
1. 0 General
This work shall consist of clearing, grubbing, removing and disposing
of everything on the ground surface within the right of way, including
bushes, trees and all other vegetation and debris, except all objects,
trees and other vegetation that are designated to remain.
VVK Page 1 of 4
Standard Specifications for Construction and maintenance of
road and bridges Clause 200
Contract Drawings
Construction Drawings
Method Statement for clearing and Grubbing (KD 02/MS/002–
CG)
2.0 Resources
2.1 Equipment
No Equipment Quantity
1 Backhoe Loader 1
2 Motor Grader 1
3 Dump Truck/Tippers 1
4 Farm Tractor 1
2.2 Manpower
VVK Page 2 of 4
The limits of clearing or clearing & grubbing shall be set out
according to the construction limits shown in the construction
drawings, using the pegs in suitable location/intervals.
6.0 Supervision
Position Responsibilities
Responsible for execution of works according to
Site Engineer
the Method Statement
Technical All setting out works in accordance with Method
officer/Supervi Statement
sor
Foreman Assist to Site Engineer
7.0 Inspection
VVK Page 3 of 4
The Inspection and Test Plan shall be available for the Engineer to
check and approve. Approved Inspection and Test Plan (ITP) shall be
maintained at the project office and submit to the Engineer.
VVK Page 4 of 4
4 of 6