Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES
Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
PART I - FACILITIES FOR THE ENGINEER
In words: In figures:

Provision of Field Office for


A.1.1 (8) mo. 3.33
the Engineer (Rental Basis) In figures:

PART II - OTHER GENERAL REQUIREMENTS


In words: In figures:

B.3 Permits and Clearances l.s 1


In figures:

In words: In figures:

B.5 Projects Billboard/Signboard each 2


In figures:

In words: In figures:

Occupational Safety and


B.7 (2) ls 1.00
Health Program In figures:

In words: In figures:

B.9 Mobilization/Demobilization ls 1
B.9 Mobilization/Demobilization ls 1
In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
PART III - CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A - EARTHWORKS
In words: In figures:

Removal of Structure and


801(1) ls 1
Obstruction In figures:

In words: In figures:

803(1)a Structure Excavation mᵌ 67.98


803(1)a Structure Excavation mᵌ 67.98
In figures:

In words: In figures:

Embankment from Structure mᵌ


804(1)a 18.60
Excavation In figures:

In words: In figures:

804(1)b Embankment (from Borrow) mᵌ


In figures:

In words: In figures:

804(4) Gravel Fill mᵌ 27.51


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
PART B PLAIN AND REINFORCED CONCRETE WORKS
In words: In figures:

807(1) Site Development ls 1.00


In figures:

In words: In figures:

Structural Concrete (Class A,


900(1)c1 m³ 80.27
28 days)
In figures:

902(1)a1 Reinforcing Steel (Grade 40) kgs 13,037.76


In figures:

In words: In figures:

903(2) Formworks and Falseworks m2 170.84


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


SUB - TOTAL FOR THIS PAGE
In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES
Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.

(1) (2) (3) (4) (5) (6)


PART C. FINISHING
C.1 TERMITE CONTROL WORKS
In words: In figures:

1000(1) Soil Poisoning liter 68.00


In figures:

C.2 MASONRY WORKS


In words: In figures:

100mm CHB Non Load


1046 (2) a1 Bearing Wall (including m2 5.04
Reinforcing Steel)
100mm CHB Non Load
1046 (2) a1 Bearing Wall (including m2 5.04
In figures:
Reinforcing Steel)

In words: In figures:

150mm CHB Non Load


1046 (2) a2 Bearing Wall (including m2 226.99
In figures:
Reinforcing Steel)

C.3. FABRICATED MATERIALS


In words: In figures:

1010(1) Frames (Jambs) sets 6


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

1010(2)a Door (Flush) m2 5.08


In figures:

In words: In figures:

1010(2)b Door (Wood panel) m2 10.56


In figures:

In words: In figures:

1006(6) Steel Frames (Windows) l.s 1


In figures:

In words: In figures:

1009(1) a Jalousie Window (Glass) m² 24.62


In figures:

In words: In figures:

Window Accessory (Window


1005(6) l.s 1.00
Grille) In figures:

In words:

SUB - TOTAL FOR THIS PAGE


SUB - TOTAL FOR THIS PAGE
In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

1004(1) Rough Hardware ls 1.00


In figures:

In words: In figures:

Carpentry and Joinery Works


1003(17) l.s 1
(Blackboard)
Carpentry and Joinery Works
1003(17) l.s 1
(Blackboard) In figures:

C-4 FINISHING WORKS


In words: In figures:

Plain Cement Finish with Floor


1021(1)c m2 171
Hardener In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES
Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.

(1) (2) (3) (4) (5) (6)


CEMENT PLASTER FINISH
In words: In figures:

1027(1) Plain Cement Plaster Finish m² 437.46


In figures:

In words: In figures:

Railings (Stainless Steel,


1051(1) m. 63.00
50mm) In figures:

In words: In figures:

1003(1) Reflective Insulation m² 180.00


In figures:

In words: In figures:

1018(1) Glazed Tiles and Trims m² 18.92


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

1018(2) Unglazed Tiles m² 8.00


In figures:

C.5 PAINTING WORKS


In words: In figures:

1032(1)a Masonry/Concrete Painting m² 660.20


In figures:

In words: In figures:

1032(1)b Wood Painting m² 215.23


In figures:

In words: In figures:

1032(1)c Metal Painting m² 263.62


1032(1)c Metal Painting m² 263.62
In figures:

C.6 ROOF FRAMING AND ROOFING WORKS


In words: In figures:

Prepainted Metal Sheets, Long


1014(1)b1 Span, Corrugated type, m² 182.88
0.5mm thk In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

Fabricated Metal Roofing


1013(2)a Accessory (Ridge Roll, 0.6mm m 18
thk)
Fabricated Metal Roofing
1013(2)a Accessory (Ridge Roll, 0.6mm m 18
In figures:
thk)

In words: In figures:

Fabricated Metal Roofing


1013(2)b Accessory (Flashing, 0.6mm m 20.80
In figures:
thk)

In words: In figures:

1047(2)a Structural Steel, Trusses kg 1,554.68


In figures:

In words: In figures:

1047(2)b Structural Steel, Purlins kg 1,788.60


In figures:

In words: In figures:

Metal Structure Accessories,


1047(7)b kg 115.56
Bolts
In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:

BILL OF QUANTITIES
Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.

(1) (2) (3) (4) (5) (6)


In words: In figures:

Metal Structure Accessories,


1047(6) kg 650.22
Steel Plate In figures:

In words: In figures:

Metal Structure Accessories,


1047(7)b kg 66.93
Sag Rods In figures:

In words: In figures:

Metal Structure Accessories,


1047(4) kg 96.69
Cross Bracing In figures:

In words: In figures:

Metal Structure Accessories,


1047(3)c each 32.00
Turn Buckle In figures:

PART D - PLUMBING/SANITARY WORKS


In words: In figures:

1001(8) Sewer Line Works l.s 1


In figures:
1001(8) Sewer Line Works l.s 1

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:
-------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

1002(4) Sanitary/Plumbing Fixtures ls 1


1002(4) Sanitary/Plumbing Fixtures ls 1
In figures:

In words: In figures:

1002(24) Cold Water Line Works ls 1


In figures:

PART E-ELECTRICAL WORKS


In words: In figures:

1100(10) Conduits,Boxes and Fittings ls 1


In figures:

In words: In figures:

1101(33) Wires and Wiring Devices ls 1


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

In words:

GRAND TOTAL - - - -
In figures:

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz
Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the Contract : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99 Calendar Days:
-------------------------------------------------------------------------------------------------------------------------------

BILL OF QUANTITIES

Part No.: Part Description:

Pay Item
Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No.
(1) (2) (3) (4) (5) (6)
In words: In figures:

Power Load Center,Switchgear


1102(1) ls 1
and Panelboards In figures:

In words: In figures:

1103(1) Lighting Fixtures ls 1


In figures:

In words:

SUB - TOTAL FOR THIS PAGE


In figures:

In words:

GRAND TOTAL - - - -
In figures:
GRAND TOTAL - - - -

Submitted By:

JOEL F. ALADO Date:


PROPRIETOR
ROCK 101 CONSTRUCTION & SUPPLY

-------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 17 - 2016
AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)

In figures:

In figures:

In figures:

In figures:

In figures:
In words:

In figures:

-----------------------------------------
Page 1 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
KS

In figures:

In figures:
In figures:

In figures:

In figures:

In words:

In figures:

-----------------------------------------
Page 2 of 11
AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)

In figures:

In figures:

In figures:

In words:
In figures:

-----------------------------------------
Page 3 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)

In figures:

In figures:
In figures:

In figures:

In words:

In figures:

-----------------------------------------
Page 4 of 11

AYS
on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
In figures:

In figures:

In figures:

In figures:

In figures:

In words:
In figures:

-----------------------------------------
Page 5 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
In figures:

In figures:
In figures:

In words:

In figures:

-----------------------------------------
Page 6 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)
Amount (Pesos)

(6)

In figures:

In figures:

In figures:

In figures:

In words:

In figures:

-----------------------------------------
Page 7 of 11
AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
In figures:

In figures:

In figures:

In figures:
In figures:

In words:

In figures:

-----------------------------------------
Page 8 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
In figures:
In figures:

In figures:

In figures:

In figures:

In words:

In figures:

-----------------------------------------
Page 9 of 11
AYS

on of School Buildings in the

Calendar Days: 100 C.D

Amount (Pesos)

(6)
In figures:

In figures:

In figures:

In figures:

In figures:
In words:

In figures:

-----------------------------------------
Page 10 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D


-----------------------------------------

Amount (Pesos)

(6)
In figures:
In figures:

In figures:

In figures:

In words:

In figures:

In words:

In figures:

-----------------------------------------
Page 11 of 11

AYS

on of School Buildings in the

Calendar Days: 100 C.D


-----------------------------------------

Amount (Pesos)

(6)
In figures:

In figures:

In words:

In figures:

In words:

In figures:
-----------------------------------------
Page 12 of 12
SUBJECT : Detailed Estimates

: CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the


NAME OF PROJECT
Secondary Classrooms in Capiz

LOCATION : Aranguel Elementary School, Pres. Roxas, Capiz

BILL OF MATERIALS

ITEM
DESCRIPTION QUANTITY UNIT
No.
PART I - FACILITIES FOR THE ENGINEER

Provision of Field Office for the


A.1.1 (8) 3.33 months
Engineer (Rental Basis)

Php

PART II - OTHER GENERAL REQUIREMENTS

B.3 Permits and Clearances 1.00 l.s

Php

B.5 Projects Billboard/Signboard 2.00 each

Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

B.7 (2) Occupational Safety and Health Program 1.00 l.s.


Php

B.9 Mobilization/Demobilization 1.00 l.s.

Php

PART III- CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS

PART A - EARTHWORKS

801(1) Removal of Structure and Obstruction 1.00 l.s.

Php

803(1)a Structure Excavation 67.98 mᵌ


Labor
Contingencies
Contractor's Profit
VAT

Php

804(1)a Embankment from Structure Excavation 18.60 mᵌ


Labor
Contingencies
Contractor's Profit
VAT
Php

804(1)b Embankment (from Borrow) 21.25 mᵌ


Labor
Contingencies
Contractor's Profit
VAT
Php
804(4) Gravel Fill 27.51 mᵌ
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

807(1) Site Development 1.00 l.s.


Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

PART B - PLAIN AND REINFORCED CONCRETE WORKS

900(1)c1 Structural Concrete (Class A, 28 days) 80.27 mᵌ

Cement 805.00 bags


Washed Sand 40.50 cu.m.
Washed Gravel 81.00 cu.m.
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

902(1)a1 Reinforcing Steel (Grade 40) 13,037.76 kgs

Reinforcing Steel (Grade 40) 13,038.76 kgs


Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

903(2) Formworks and Falseworks 170.84 m2


4' x 8' x 3/4" thk Plyboard 70.00 pcs
Bamboo Poles 100.00 pcs
Assorted Nails 25.00 kgs
No. 16 G.I. Wire 2.00 rolls
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

PART C - FINISHING
C.1 TERMITE CONTROL WORKS

1000(1) Soil Poisoning 68.00 liter


Soil Poison 69.00 liter
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

C.2 MASONRY WORKS

100mm CHB Non Load Bearing Wall


1046 (2) a1 5.04 m2
(including Reinforcing Steel)

100mm CHB 73.00 pcs


Cement 10.00 bags
Washed Sand 1.00 cu.m.
10mm X 6m RSB 15.00 pcs
No. 16 G.I. Wire 10.00 kg
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

150mm CHB Non Load Bearing Wall


1046 (2) a2 226.99 m2
(including Reinforcing Steel)
150mm CHB 2,280.00 pcs
Cement 50.00 bags
Washed Sand 5.00 cu.m.
10mm X 6m RSB 230.00 pcs
No. 16 G.I. Wire 1.00 roll
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

C.3 FABRICATED MATERIALS

1010(1) Frames (Jambs) 6 sets


Frames (Jambs) 6 sets
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1010(2)a Door (Flush) 5.08 m2


Door (Flush) 5.08 m2
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1010(2)b Door (Wood panel) 10.56 m2


Door (Wood panel) 10.56 m2
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1006(6) Steel Frames (Windows) 1.00 l.s


Steel Frames (Windows) 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php
1009(1) a Jalousie Window (Glass) 24.62 m2
Jalousie Window (Glass) 24.62 m2
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1005(6) Jalousie Window (Window Grille) 1.00 l.s.


Jalousie Window (Window Grille) 1.00 l.s.
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1004(1) Rough Hardware 1.00 l.s.


Rough Hardware 1.00 l.s.
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Carpentry and Joinery Works


1003(17) 1.00 l.s.
(Blackboard)
Carpentry and Joinery Works
1.00 l.s.
(Blackboard)
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

C.4 FINISHING WORKS


Plain Cement Finish with Floor
1021(1)c 1.00 l.s.
Hardener
Cement 200.00 bags
Sand 10.00 cu.m.
Gravel 20.00 cu.m.
Floor Hardener 10.00 lt.
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1027(1) Plain Cement Plaster Finish 437.46 m²


Cement 140.00 bags
Sand 14 cu.m.
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1003(1) Reflective Insulation 180.00 m²


Reflective Thermal Insulation Coat 8.00 gal
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1018(1) Glazed Tiles and Trims 63.00 m.


11.00 pcs
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1018(2) Unglazed Tiles 8.00 m²


30cm X 30cm Unglazed Tiles 80.00 pcs
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

C.5 PAINTING WORKS


1032(1)a Masonry/Concrete Painting 660.20 m²
Concrete Neutralizer 15.00 gal
Flat Latex 28.00 gal
Semi-gloss Latex 28.00 gal
Patching Compound 70.00 bags
Sand Paper 2.00 Rolls
Paint Brush 4" 3.00 pcs
Paint Roller 7" w/ Pan 3.00 pcs
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1032(1)b Wood Painting 215.23 m²


Flat Enamel 10.00 gal
Quick Drying Enamel 18.00 gal
Sand Paper 1.00 Rolls
Paint Brush 4" 3.00 pcs
Baby Roller 3.00 pcs
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1032(1)c Metal Painting 263.62 m²


Epoxy primer 10.00 gal
Quick Drying Enamel 18.00 gal
Sand Paper 1.00 Rolls
Paint Brush 4" 3.00 pcs
Baby Roller 3.00 pcs
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

C.6 ROOF FRAMING AND ROOFING WORKS


Prepainted Metal Sheets, Long Span,
1014(1)b1 182.88 m²
Corrugated type, 0.5mm thk

Prepainted Metal Sheets, Long Span,


179.30 ln.m.
Corrugated type, 0.5mm thk
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Fabricated Metal Roofing Accessory


1013(2)a 18.00 m
(Ridge Roll, 0.6mm thk)
Fabricated Metal Roofing Accessory
18.00 m
(Ridge Roll, 0.6mm thk)
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Fabricated Metal Roofing Accessory


1013(2)b 20.80 m
(Flashing, 0.6mm thk)
Fabricated Metal Roofing Accessory
20.80 m
(Flashing, 0.6mm thk)
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1047(2)a Structural Steel, Trusses 1554.68 kg


Structural Steel, Trusses 1554.68 kg
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1047(2)b Structural Steel, Purlins 1788.60 kg


Structural Steel, Purlins 1788.60 kg
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1047(7)b Metal Structure Accessories, Bolts 115.56 kg


Metal Structure Accessories, Bolts 115.56 kg
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Metal Structure Accessories, Steel 650.22 kg


1047(6)
Plate
Metal Structure Accessories, Steel
650.22 kg
Plate
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Metal Structure Accessories, Sag 66.93 kg


1047(7)b
Rods
Metal Structure Accessories, Sag Rods 66.93 kg
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Metal Structure Accessories, Cross 96.69 kg


1047(4)
Bracing
Metal Structure Accessories, Cross 96.69 kg
Bracing
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Metal Structure Accessories, Turn 32.00 kg


1047(3)c
Buckle
Metal Structure Accessories, Turn 32.00 kg
Buckle
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

PART D - PLUMBING/SANITARY WORKS


1001(8) Sewer Line Works 1.00 l.s
Sewer Line Works 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1002(4) Sanitary/Plumbing Fixtures 1.00 l.s


Sanitary/Plumbing Fixtures 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1002(24) Cold Water Line Works 1.00 l.s


Cold Water Line Works 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

PART E - ELECTRICAL WORKS


1100(10) Conduits,Boxes and Fittings 1.00 l.s
Conduits,Boxes and Fittings 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1101(33) Wires and Wiring Devices 1.00 l.s


Wires and Wiring Devices 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

Power Load Center,Switchgear and 1.00 l.s


1102(1)
Panelboards
Power Load Center,Switchgear and 1.00 l.s
Panelboards
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php

1103(1) Lighting Fixtures 1.00 l.s


Lighting Fixtures 1.00 l.s
Materials
Labor
Contingencies
Contractor's Profit
VAT
Php
Labor 45%
Cont 15%
Profit 15%
VAT 8%

of School Buildings in the Elementary and

UNIT COST AMOUNT

15,000.00 49,950.00

Php 49,950.00

100,000.00 100,000.00

Php 100,000.00

5,000.00 10,000.00

Materials 10,000.00
Labor 4,500.00
Contingencies 1,500.00
Contractor's Profit 1,500.00
VAT 800.00
Php 18,300.00

50,000.00 50,000.00
Php 50,000.00

20,000.00 20,000.00

Php 20,000.00

BING WORKS

30,000.00 30,000.00

Php 30,000.00

450.00 30,591.00
Labor 30,591.00
Contingencies 4,588.65
Contractor's Profit 4,588.65
VAT 2,447.28

Php 42,215.58

450.00 8,370.00
Labor 8,370.00
Contingencies 0.00
Contractor's Profit 0.00
VAT 0.00
Php 8,370.00

450.00 9,562.50
Labor 9,562.50
Contingencies 1,434.38
Contractor's Profit 1,434.38
VAT 765.00
Php 13,196.25
950.00 26,134.50
Materials 26,134.50
Labor 11,760.53
Contingencies 3,920.18
Contractor's Profit 3,920.18
VAT 2,090.76
Php 47,826.14

40,000.00 40,000.00
Materials 40,000.00
Labor 18,000.00
Contingencies 6,000.00
Contractor's Profit 6,000.00
VAT 3,200.00

Php 73,200.00

240.00 193,200.00
650.00 26,325.00
950.00 76,950.00
Materials 296,475.00
Labor 133,413.75
Contingencies 44,471.25
Contractor's Profit 44,471.25
VAT 23,718.00

Php 542,549.25

44.00 573,705.44
Materials 573,705.44
Labor 258,167.45
Contingencies 86,055.82
Contractor's Profit 86,055.82
VAT 45,896.44
Php 1,049,880.96

1,300.00 91,000.00
120.00 12,000.00
90.00 2,250.00
1,800.00 3,600.00
Materials 108,850.00
Labor 48,982.50
Contingencies 16,327.50
Contractor's Profit 16,327.50
VAT 8,708.00
Php 199,195.50

1,000.00 69,000.00
Materials 69,000.00
Labor 31,050.00
Contingencies 10,350.00
Contractor's Profit 10,350.00
VAT 5,520.00
Php 126,270.00

16.00 1,168.00
240.00 2,400.00
650.00 650.00
170.00 2,550.00
70.00 700.00
Materials 7,468.00
Labor 3,360.60
Contingencies 1,120.20
Contractor's Profit 1,120.20
VAT 597.44
Php 13,666.44

22.00 50,160.00
240.00 12,000.00
650.00 3,250.00
170.00 39,100.00
1,800.00 1,800.00
Materials 106,310.00
Labor 47,839.50
Contingencies 15,946.50
Contractor's Profit 15,946.50
VAT 8,504.80
Php 194,547.30

2,500.00 15,000.00
Materials 15,000.00
Labor 6,750.00
Contingencies 2,250.00
Contractor's Profit 2,250.00
VAT 1,200.00
Php 27,450.00

1,460.00 7,416.80
Materials 7,416.80
Labor 3,337.56
Contingencies 1,112.52
Contractor's Profit 1,112.52
VAT 593.34
Php 13,572.74

2,580.00 27,244.80
Materials 27,244.80
Labor 12,260.16
Contingencies 4,086.72
Contractor's Profit 4,086.72
VAT 2,179.58
Php 49,857.98

0.00
Materials 0.00
Labor 0.00
Contingencies 0.00
Contractor's Profit 0.00
VAT 0.00
Php 0.00
650.00 16,003.00
Materials 16,003.00
Labor 7,201.35
Contingencies 2,400.45
Contractor's Profit 2,400.45
VAT 1,280.24
Php 29,285.49

0.00
Materials 0.00
Labor 0.00
Contingencies 0.00
Contractor's Profit 0.00
VAT 0.00
Php 0.00

0.00
Materials 0.00
Labor 0.00
Contingencies 0.00
Contractor's Profit 0.00
VAT 0.00
Php 0.00

20,000.00 20,000.00
Materials 20,000.00
Labor 9,000.00
Contingencies 3,000.00
Contractor's Profit 3,000.00
VAT 1,600.00
Php 36,600.00

0.00
240.00 48,000.00
650.00 6,500.00
950.00 19,000.00
583.00 5,830.00
Materials 79,330.00
Labor 35,698.50
Contingencies 11,899.50
Contractor's Profit 11,899.50
VAT 6,346.40
Php 145,173.90

240.00 33,600.00
650.00 9,100.00
Materials 42,700.00
Labor 19,215.00
Contingencies 6,405.00
Contractor's Profit 6,405.00
VAT 3,416.00
Php 78,141.00

950.00 7,600.00
Materials 7,600.00
Labor 3,420.00
Contingencies 1,140.00
Contractor's Profit 1,140.00
VAT 608.00
Php 13,908.00

2,800.00 30,800.00
Materials 30,800.00
Labor 0.00
Contingencies 0.00
Contractor's Profit 0.00
VAT 0.00
Php 30,800.00

40.00 3,200.00
Materials 3,200.00
Labor 3,200.00
Contingencies 480.00
Contractor's Profit 480.00
VAT 256.00
Php 7,616.00

150.00 2,250.00
510.00 14,280.00 y 66.02
780.00 21,840.00
120.00 8,400.00
1,400.00 2,800.00
50.00 150.00
230.00 690.00
Materials 50,410.00
Labor 22,684.50
Contingencies 3,402.68
Contractor's Profit 7,561.50
VAT 4,032.80
Php 88,091.48

780.00 7,800.00
790.00 14,220.00
1,400.00 1,400.00
50.00 150.00
150.00 450.00
Materials 24,020.00
Labor 10,809.00
Contingencies 3,603.00
Contractor's Profit 3,603.00
VAT 1,921.60
Php 43,956.60

1,250.00 12,500.00
790.00 14,220.00
1,400.00 1,400.00
50.00 150.00
150.00 450.00
Materials 28,720.00
Labor 12,924.00
Contingencies 4,308.00
Contractor's Profit 4,308.00
VAT 2,297.60
Php 52,557.60

350.00 62,755.00

Materials 62,755.00
Labor 28,239.75
Contingencies 9,413.25
Contractor's Profit 9,413.25
VAT 5,020.40
Php 114,841.65

350.00 6,300.00

Materials 6,300.00
Labor 2,835.00
Contingencies 945.00
Contractor's Profit 945.00
VAT 504.00
Php 11,529.00

350.00 7,280.00

Materials 7,280.00
Labor 3,276.00
Contingencies 1,092.00
Contractor's Profit 1,092.00
VAT 582.40
Php 13,322.40

75.00 116,601.00
Materials 116,601.00
Labor 52,470.45
Contingencies 17,490.15
Contractor's Profit 17,490.15
VAT 9,328.08
Php 213,379.83

75.00 134,145.00
Materials 134,145.00
Labor 60,365.25
Contingencies 20,121.75
Contractor's Profit 20,121.75
VAT 10,731.60
Php 245,485.35

200.00 23,112.00
Materials 23,112.00
Labor 10,400.40
Contingencies 3,466.80
Contractor's Profit 3,466.80
VAT 1,848.96
Php 42,294.96

200.00 130,044.00
Materials 130,044.00
Labor 58,519.80
Contingencies 19,506.60
Contractor's Profit 19,506.60
VAT 10,403.52
Php 237,980.52

45.00 3,011.85
Materials 3,011.85
Labor 1,355.33
Contingencies 451.78
Contractor's Profit 451.78
VAT 240.95
Php 5,511.69

45.00 4,351.05

Materials 4,351.05
Labor 1,957.97
Contingencies 652.66
Contractor's Profit 652.66
VAT 348.08
Php 7,962.42

200.00 6,400.00
Materials 6,400.00
Labor 2,880.00
Contingencies 960.00
Contractor's Profit 960.00
VAT 512.00
Php 11,712.00

12,500.00 12,500.00
Materials 12,500.00
Labor 5,625.00
Contingencies 1,875.00 1120
Contractor's Profit 1,875.00 13000
VAT 1,000.00 6400
Php 22,875.00 20520

23,500.00 23,500.00
Materials 23,500.00
Labor 10,575.00
Contingencies 3,525.00
Contractor's Profit 3,525.00
VAT 1,880.00
Php 43,005.00

10,000.00 10,000.00
Materials 10,000.00
Labor 4,500.00
Contingencies 1,500.00
Contractor's Profit 1,500.00
VAT 800.00
Php 18,300.00

15,000.00 15,000.00
Materials 15,000.00
Labor 6,750.00
Contingencies 2,250.00
Contractor's Profit 2,250.00
VAT 1,200.00
Php 27,450.00

28,000.00 28,000.00
Materials 28,000.00
Labor 12,600.00
Contingencies 4,200.00
Contractor's Profit 4,200.00
VAT 2,240.00
Php 51,240.00

30,000.00 30,000.00

Materials 30,000.00
Labor 13,500.00
Contingencies 4,500.00
Contractor's Profit 4,500.00
VAT 2,400.00
Php 54,900.00

25,000.00 25,000.00
Materials 25,000.00
Labor 11,250.00
Contingencies 3,750.00
Contractor's Profit 3,750.00
VAT 2,000.00
Php 45,750.00

#NAME?
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz

Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the C : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99

SUMMARY OF BID PRICES


(All Parts of Bill of Quantities or BOQ)

Instructions for completing the Summary of Bid Prices:

1. Part No. – Enter the “Part No.” for each section of the BOQ where unit prices are entered.
2. Part Description – Enter the “Part Description” corresponding to the “Part No.”
3. Total Amount – Enter the “Total Amount” in Pesos for all pages having the same “Part Description”.

PART NO. PART DESCRIPTION


PART 1 - FACILITIES FOR THE ENGINEER
A.1.1 (8) Provision of Field Office for the Engineer (Rental Basis)
PART II - OTHER GENERAL REQUIREMENTS
B.3 Permits and Clearances
B.5 Projects Billboard / Signboard
B.7(2) Occupational Safety and Health Program
B.9 Mobilization / Demobilization
CONSTRUCTION OF 1 STOREY,2 CLASSROOM SCHOOL BUILDING,ARANGUEL PRES. ROXAS,CAPIZ - 2 (7X
PART III - CIVIL, MECHANICAL, ELECTRICAL AND SANITARY / PLUMBING WORKS
PART A - EARTHWORKS
801(1) Removal of Structure and Obstruction
803(1)a Structure Excavation
804(1)a Embankment from Structure Excavation
804(1)b Embankment from Borrow
804(4) Gravel Fill
807(1) Site Development
PART B - PLAIN AND REINFORCED CONCRETE WORKS
900(1)c1 Structural Concrete (Class A, 28 days)
902(1)a1 Reinforcing Steel ,Grade 40
903(1) Forms and Falseworks
PART C - FINISHING
C.1 TERMITE CONTROL WORK
1000(1) Soil Poisoning
C.2 MASONRY WORKS
1046(2)a1 100mm CHB Non Loading Bearing Wall (including Rienforcing Steel)
1046(2)a2 150mm CHB Non Load Bearing Wall (including Reinforcing Steel)
C.3 FABRICATED MATERIALS
1010(1) Frames(Jambs)
1010(2)a Door (Flush)
1010(2)b Door (Wood Panel)
1006(6) Steel Frames (Windows)
1009(1)a Jalousie Window (Glass)
Sub-total - - - -
TOTAL OF ALL AMOUNTS IN WORDS:
PESOS

AND CENTAVOS.

Name in the capacity of

Signed Date

Duly authorized to sign the Bid for and on behalf of

----------------------------------------------------------------------------------------------------------------
DPWH - INFR - 18 - 2016

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz

Contract ID :18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the C : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz
Approved Budget for the Conract (ABC): Php4,348,667.99

SUMMARY OF BID PRICES


(All Parts of Bill of Quantities or BOQ)

Instructions for completing the Summary of Bid Prices:

1. Part No. – Enter the “Part No.” for each section of the BOQ where unit prices are entered.
2. Part Description – Enter the “Part Description” corresponding to the “Part No.”
3. Total Amount – Enter the “Total Amount” in Pesos for all pages having the same “Part Description”.
PART NO. PART DESCRIPTION
STEEL WINDOWS
1005(6) Window Accessorry (Window Grille)
1004(1) Rough Hardward
1003(17) Carpentary and Joinery Works (Blackboard)
C.4 FINISHING WORKS
1021(1)c Plain Cement Finish With Floor Hardener
1027(1) Plain Cement Plaster Finish
1051(1) Railings (Stainless Steel , 50mm)
1003(1)a1 Ceiling (Fiber Cement Board on Metal Frame)
1038(1) Reflective Insulation
1018(1) Glazed Tiles and Trims
1018(2) Unglazed Tiles
C.5 PAINTING WORKS
1032(1)a Masonry/Concrete Painting
1032(1)b Wood Painting
1032(1)c Metal Painting
C.6 ROOF FRAMING AND ROOFING WORKS
1014(1)b1 Prepainted Metal Sheet, Long Span, corrugated type,0.5mm thk
1013(2)a Fabricated Metal Roofing Accessory (Ridge Roll, 0.6mm thk.)
1013(2)b Fabricated Metal Roofing Accessory (Flasing, 0.6mm thk.)
1047(2)a Structural Steel,Trusses
1047(2)b Structural Steel, Purlins
1047(7)a Metal Structure Accessories , Bolt
1047(6) Metal Structure Accessories , Steel Plates
1047(7)b Metal Structure Accessories , Sag Rods
1047(4) Metal Structure Accessories , Cross Bracing
1047(3)c Metal Structure Accessories , Turn Buckle
Sub-total - - - -
TOTAL OF ALL AMOUNTS IN WORDS:
PESOS

AND CENTAVOS.

Name in the capacity of


Signed Date
Duly authorized to sign the Bid for and on behalf of

----------------------------------------------------------------------------------------------------------------
DPWH - INFR - 18 - 2016
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Capiz 1st District Engineering Office
Roxas City, Capiz

Contract ID : 18GD0104
Contract Name CY 2018 BEFF (Batch 2) Construction and Completion of School Buildings in the
Elementary and Secondary Classrooms in Capiz
Location of the C : 1 storey 2 Classrooms
: Aranguel Elementary School, Pres. Roxas, Capiz

SUMMARY OF BID PRICES


(All Parts of Bill of Quantities or BOQ)

Instructions for completing the Summary of Bid Prices:

1. Part No. – Enter the “Part No.” for each section of the BOQ where unit prices are entered.
2. Part Description – Enter the “Part Description” corresponding to the “Part No.”
3. Total Amount – Enter the “Total Amount” in Pesos for all pages having the same “Part Description”.

PART NO. PART DESCRIPTION


PART D - PLUMBING/SANITARY WORKS
1001(8) Sewer Line Works
1002(4) Sanitary / Plumbing Fixtures
1002(24) Cold Water Line Works
PART E - ELECTRICAL WORKS
1100(10) Conduits,Boxers,and Fittings
1101(33) Wires And Wiring Devices
1102(1) Power Load Center, Switchgear and Panelboards
1003(1) Lighting Fixtures
Sub-total - - - -
GRAND TOTAL - - - -
TOTAL OF ALL AMOUNTS IN WORDS:
PESOS

AND CENTAVOS.

Name in the capacity of


Signed Date
Duly authorized to sign the Bid for and on behalf of
----------------------------------------------------------------------------------------------------------------
DPWH - INFR - 18 - 2016
AYS

chool Buildings in the

Calendar Days: 100 C.D

Part Description”.

TOTAL AMOUNT

49,950.00

100,000.00
18,300.00
50,000.00
20,000.00
EL PRES. ROXAS,CAPIZ - 2 (7X9)

30,000.00
42,215.58
8,370.00
13,196.25
47,826.14
73,200.00

542,549.25
1,049,880.96
199,195.50

126,270.00
2,370,953.67

----------------------------------
Page 1 of 3

AYS

chool Buildings in the

Calendar Days: 100 C.D

Part Description”.
TOTAL AMOUNT

----------------------------------
Page 2 of 3
AYS

chool Buildings in the

Part Description”.

TOTAL AMOUNT
----------------------------------
Page 3 of 3
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Contract ID : 17GD0077
Contract Name : Construction of School Buildings Cluster 8
Location of the Contract : 1. Construction of One (1) Unit, 1 Storey 4 Classroom School Building,
& 1 Unit - 1 Storey, - 1 Classroom School Building
Antonio Villasis Memorial School, Roxas City (Capital), Capiz
2. Construction of One (1) Unit, 1 Storey 1 Classroom School Building,
& 1 Unit - 1 Storey, - 2 Classroom School Building
Sofronio A. Cordovero Integrated School, Roxas City (Capital), Capiz

------------------------------------------------------------------------------------------------------------------------

BIDDER’S CHECKLIST OF REQUIREMENTS FOR ITS BID, INCLUDING


TECHNICAL AND FINANCIAL PROPOSALS

The Technical Proposal shall contain the following:

If Joint Venture, PCAB Special JV License

Bid Security (Form DPWH - INFR - 09, 10, or 11, 12 as applicable)

Duly initialed Organizational Chart for the Contract (Form DPWH - INFR - 13)

Duly initialed Contractor’s List of Key Personnel for the Contract (Form DPWH - INFR -14)

Duly initialed List of Contractor’s Major Equipment (Form DPWH - INFR - 15)

Sworn statement under RA9184-IRR Sec. 25.2b)iv) (Form DPWH-INFR-16)

Signatory is proprietor/duly authorized representative of bidder.

Full power and authority to perform acts or represent bidder.

Not “blacklisted” or barred from bidding.

Each document is authentic copy of original, complete, and correct.

Authorizing Head of Procuring Entity to verify all documents submitted.

Not related to HOPE, BAC, TWG, Secretariat, PMO/IU, within 3rd civil degree.

Complies with existing labor laws and standards.

Aware of and undertaken responsibilities as a bidder.

Did not give any commission, amount, fee, or consideration.

The Financial Proposal shall contain the following:

Duly signed Bid Form

Duly signed Bid Prices in the Bill of Quantities (Forms DPWH - INFR - 17 and 18)

Duly initialed Detailed Estimates


Duly initialed Cash Flow by Quarter (Form DPWH - INFR - 19)

--------------------------------------------------------------------------------------------------------
DPWH - INFR - 18 Page 1 of 1
Project Name
Location
FORM POW - 2015 - 01B - 00

MINIMUM EQUIPMENT REQUIREMENT


Flywheel Number of Number of
No. Equipment Description Capacity Horsepower
No. Equipment Description Capacity
Equipment Equipment
1. Backhoe (0.80 cu.m) 1 31
2. Dump Truck 2 32
3. Cargo Truck (9 - 10 mt) 1 33
4. Fortalift 2 34
5. One Bagger Mixer (4 -6 cu.ft./min.) 4 35
6. Stick Vibrator 4 36
7. Bar Cutter 4 37
8. Welding Machine w/ Generator 1 38
9. x-x-x-x-x-x-x 39
10. 40
11. 41
12. 42
13. 43
14. 44
15. 45
16. 46
17. 47
18. 48
19. 49
20. 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
SUB - TOTAL SUB - TOTAL
TOTAL
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Contract ID : 17GD0077
Contract Name : Construction of School Buildings Cluster 8
Location of the Contrac : 1. Construction of One (1) Unit, 1 Storey 4 Classroom School Building,
& 1 Unit - 1 Storey, - 1 Classroom School Building
Antonio Villasis Memorial School, Roxas City (Capital), Capiz
2. Construction of One (1) Unit, 1 Storey 1 Classroom School Building,
& 1 Unit - 1 Storey, - 2 Classroom School Building
Sofronio A. Cordovero Integrated School, Roxas City (Capital), Capiz

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
LIST OF CONTRACTOR’S MAJOR CONSTRUCTION AND LABORATORY EQUIPMENT UNITS TO BE ASSIGNED TO THE CONTRACT, SUPPORTED BY
CERTIFICATIONS OF AVAILABILITY
Business Name :
Business Address :

Capacity/
Motor No./ Proof of Ownership/
Description Model/Year Performance/ Plate No. Location Condition
Body No. Lease/Purchase
Size
A. Owned
i.
ii.
iii.
iv.
v.
B. Leased
i.
ii.
iii.
iv.
v.
C. Under Purchased Agreements
i.
ii.
iii.
iv.
v.
1. Attched are copies of sales invoice / Registration Certificate from LTO.
2. Attached are the certifications from the lessors that the equipment units under B (Leased) shall be available for this contract.
3. Attached are the certifications from the vendors that the equipment units under C (Purchase Agreements) shall be available for this contract.

Minimum major construction equipment requirement as prescribed in the Bid Data Sheet: Minimum major laboratory equipment requirements as prescribed in Bid Data Sheet:
Name and Signature of Bidder's Representative Date
---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
DPWH - INFR - 15 - 2016 Page 1 of 1