cover
En route to
Mr. Rahim
Mangel
page
(E)11, Mohammad
Ayaz Khan(E) 15,
Waseem Akram
By Mohammad
Shahzad(E) 48
Imran (E)04,
Sulaman
Institute of Management
Sciences University of
Balochistan Quetta Group
Assignment (session 2009-2011)
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
TABLE OF CONTENTS
ACKNOWLEDGEMENT .............................................................................1
TABLE OF CONTENTS .............................................................................3
INTRODUCTION.......................................................................................8
MARKET ANALYSIS.................................................................................8
INTRODUCTION AND PROMOTION OF NEWLY DEVELOPED GAS KITS FOR
RICKSHAW IN PISHIN DISTRICT................................................................9
MARKET SUPPLY.....................................................................................9
EXISTING SUPPLY...................................................................................9
MARKET DEMAND...................................................................................9
DEMAND FOR CURRENT CONSUMPTION .................................................10
THE DEMAND FOR CNG FUEL=12900 CUBIC METER/DAY................................................... 10
FUTURE DEMAND..................................................................................10
DEMAND PROJECTIONS FOR VEHICLES ON CNG (IN PISHIN DISTRICT)..............................................11
CNG POLICY..........................................................................................11
THE GOVERNMENT OF PAKISTAN HAS OFFERED NUMBER OF INCENTIVES FOR ENCOURAGING THE USE OF CNG IN
THE COUNTRY SOME OF THESE ARE SUMMARIZED BELOW:..............................................................11
TECHNICAL ANALYSIS...........................................................................12
MATERIAL INPUTS:......................................................................................................... 12
LAND:....................................................................................................................... 12
INFRASTRUCTURE:..........................................................................................................13
BUILDING:.................................................................................................................. 13
Gas Compressor.................................................................................................14
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
SUPPLIERS..................................................................................................................15
MANPOWER REQUIREMENT................................................................................................16
COMPRESSION PROCESS................................................................................................... 17
ENVIRONMENTAL/ECOLOGICAL..............................................................18
ANALYSIS.............................................................................................18
ECOLOGICAL/ENVIRONMENTAL ANALYSIS.............................................................18
ECONOMIC ANALYSIS............................................................................19
ECONOMIC ANALYSIS.............................................................................................19
Employment Opportunity...................................................................................20
Contribution to GDP...........................................................................................20
Tax benefit......................................................................................................... 20
Foreign exchange.............................................................................................. 20
NOC'S..................................................................................................................... 22
INCENTIVES...........................................................................................................23
Custom duty.......................................................................................................23
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
REGULATORY REQUIREMENTS...............................................................................23
Quality certificate...............................................................................................23
List of Equipments.............................................................................................23
Income tax......................................................................................................... 23
ANNEXURE...........................................................................................24
COST OF THE PROJECT & FINANCIAL PLAN.............................................................................24
Financial plan.....................................................................................................24
COST OF BUILDING........................................................................................................25
REVENUE: WORKING...................................................................................................... 27
Fixed charges.....................................................................................................30
Variable charges................................................................................................30
DEPRECIATION.............................................................................................................. 32
Current Assets................................................................................................... 37
Current liabilities................................................................................................37
Long term liabilities................................................................................................................... 37
Equity........................................................................................................................................ 37
Profitability ratio................................................................................................ 39
Gross profit margin = Gross profit / Sales * 100........................................................................ 39
................................................................................................................................................ 40
PROFITABILITY INDEX......................................................................................................41
REFERENCES .......................................................................................44
INDEXES ..............................................................................................45
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
EXECUTIVE SUMMARY
T he people of Pishin district belongs mainly to low income/ earning society which cannot
afford high price petroleum product that’s why CNG is a cheaper source of fuel for them.
Natural gas is a natural resource of energy, commonly used in residential, commercial and
industrial sector. It is one of the most valuable natural resources abundantly available in our
country. Compressed Natural Gas (CNG) is produced when the natural gas is compressed into
cylinders to be used as a fuel in the automobiles
Due to the efforts made by the Government and comparatively low prices of gas, more
then 2000000 have already been converted to operate on Compressed Natural Gas (CNG)
fueling system all over Pakistan .there are more then, 2941 CNG station operating in the
country and there is a need to set up more CNG station to meet the growing demand for it. As a
part of its policy government has made great efforts to promote the use of CNG in Pishin District
as well.
At present, there is no CNG station in Pishin district. There are about more then
200vehicles, which have been converted to CNG fueling system in Pishin District, and a large
number of vehicles are being converted these vehicle. It has been projected that the total
number of CNG fuel vehicles will be increased up to 1000 by the end of next five years.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
INTRODUCTION
N atural gas is a natural resource of energy, commonly used in residential, commercial and
industrial sector. It is one of the most valuable natural resources abundantly available in our
country. Compressed Natural Gas (CNG) is produced when the natural gas is compressed into
cylinders to be used as a fuel in the automobiles
CNG-powered vehicles uses natural gas – the same fuel that is used by stoves, water heaters and
clothes dryers—stored in cylinders at pressures of 2,000 to 3,500 pounds per square inch
CNG has been used as an automobile fuel since 1940, and over the years, the technology has been
modified and refined. In the recent years, the usage if CNG as an automobile fuel has significantly
increased because of its low cost and environment friendly nature.
The people of Pakistan have been using the petroleum as fuel in their automobiles, thus spending a
large amount of foreign exchange on import of petroleum products. Because there are abandoned
supplies of natural gas in Pakistan, using natural gas to replace gasoline helps reduce our country’s
dependency on foreign petroleum.
In Pakistan, hydrocarbon development institute of Pakistan (HDIP) first established the use of CNG as
an automobile fuel in 1982. the market of this type of fuel, which is commonly available at much
cheaper price, is increasing because of continuous increase in petroleum prices. At present, about 270
CNG station are operational in different parts of the country to cater to the needs of the consumers.
MARKET ANALYSIS
One of the elements of Government petroleum policy is the commercial application of CNG
technology .It is reflected in the efforts made by the government for the installation of CNG station and
converting vehicles on CNG fueling system .Due to the efforts made by the Government and
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
comparatively low prices of gas, more then 2000000 have already been converted to operate on
Compressed Natural Gas (CNG)fueling system all over Pakistan .there are more then ,2941 CNG station
operating in the country and there is a need to set up more CNG station to meet the growing demand for
it. As a part of its policy government has made great efforts to promote the use of CNG in Pishin District
as well.
“Taraqee”Trust of Pishin District has undertaken to reduce green house emission leading to
global warning by introducing 40 CNG gas kits in two stroke rickshaws in Pishin District city through
the provision of credit to the rickshaws owner. The key stakeholders in this project are Rickshaw Drivers
Association, Pakistan Hydrocarbon Institute, Canadian International Development Agency and
Balochistan EPA.
MARKET SUPPLY
EXISTING SUPPLY
MARKET DEMAND
The people of Pishin district belongs mainly to low income/ earning society which cannot afford
high price petroleum product that’s why CNG is a cheaper source of fuel for them. There are about more
then 200vehicles, which have been converted to CNG fueling system in Pishin District, and a large
number of vehicles are being converted these vehicle. It has been projected that the total number of CNG
fuel vehicles will be increased up to 1000 by the end of next five years.
Due to the increasing prices of petroleum products, the trend of converting cars to CNG fueling
system has been on a raise. The government of Pakistan has taken certain concrete steps in order to
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
promote the use of natural gas as a fuel substitute in the automobiles. There are kits available in the
market through which a petrol car can easily be converted into CNG fueling system. However, there were
a large number of people who were reluctant to convert their vehicles from petrol to gas due to safety
concerns. Recently, many car manufactures have started manufacturing the cars with built-in CNG
fueling system, e.g., Suzuki car manufacturing company. This change has led to enhancing the confidence
of the general public regarding the safety concerns, and now, more people are towards purchasing these
factory fitted CNG fueling system cars.
Considering the market trend and number of vehicles being converted into CNG fueling system there is
exist an opportunity for the new entrants to earn profits fueling by setting up new filling station to meet
the growing demand.
It’s quite clear that there is demand of about 12900 cubic meter /day on average.
But this is not the end, there is an increasing trend of CNG fueling system, the demand for this
type of fuel will be increased by 300% within next five years and hence there a great opportunity for the
new entrants to earn profits by setting up new CNG filling station t meet the growing demand.
FUTURE DEMAND
The main factors for the rise in the demand for CNG fuel are
Based on the above criteria the Demand projecti0ns are given in the following table:
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
1 1000
2 1600 60%
3 2300 70%
4 3100 80%
5 4000 90%
The above-mentioned table indicates that the demand for CNG fuel is fast increasing .The
industry is growing and there is opportunity for the new entrants to setup new CNG station to meet the
growing demand.
CNG POLICY
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
TECHNICAL ANALYSIS
MATERIAL INPUTS:
There are two main inputs required for CNG filling station, one is natural gas and other is
electricity. We are required to obtain both in the connections from the relevant authorities i.e. WAPDA
and sui southern gas company (SSGC).
According too the government’s policy CNG filling stations will be given the priority of
providing natural gas connection.CNG ranks relatively high in convenience and availability. Pishin
District’s extensive network of natural gas pipelines can deliver the fuel directly to many sites where
compressors are installed by the local utility.
LAND:
The minimum land requirements for installing CNG filling station is from 6000 to 9000 square
feet. It must have at least 75 feet front opening.
In case of our project we have already acquired land for the purpose of installing CNG filling
station on lease from the 12th crop. The covered area of the land acquired is 8000 square feet, which will
be having 75 square feet front opening.
An amount of 4,000,000 rupees at the rate of Rs.500 per square feet lease payment has been paid
to the private property.
SITE SELECTION :
The site selected for the filling station is opposite to the district law curt Pishin at the Band road
Pishin. The covered area of the acquired land as stated earlier is 8000 square feet. The site offers an ideal
location for the filling station; as it is a commercial area and the residents of the whole city will have a
very easy access to the station.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
INFRASTRUCTURE:
The project highly depends upon the availability of the infrastructure facilities; because the
material inputs required as mentioned earlier are, natural gas and electricity.
The site chosen for setting up the CNG Fuel station enjoys infrastructure facilities and possesses
all the pre-requisites for the smooth operation of the Project i.e. Water, Power, road etc.
BUILDING:
There are certain civil works required to be carried out at the proposed location. The civil works
would be carried out on an area of 2250 square feet. The rest of the area will be floored with tuff tiles.
Civil work includes the following:
Office
Control Room
Compressor and Cascade/Cylinder Storage Room
Shed for Dispenser
Toilet/Washroom
1. Underground Gas Piping
Flooring
The total cost of construction is estimated at Rs 1.5 million. Details for the said cost are as follows:
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
gas piping
Flooring _ About 6,000 50 300,000
Contingencies _ _ _ 90,000
Total cost 3,630,500
Explosive department has laid down certain specifications for the compressor and
cascade/cylinders storage room, which are as follows:
GAS COMPRESSOR
The purpose of compressor is to compress the gas enabling it to discharge the gas for refueling.
This compressor requires an input pressure of 10 PSIG (pounds per square inch gauge) from the main gas
supply with the outlet pressure of 3,600 PSIG. With this discharge pressure, the equipment can refuel 50
vehicles per hour.
Electric control panel is required to operate the gas compressor. This panel will be mounted in the
control room.
STORAGE CASCADE
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
During rush hours, the compressor is directly connected to the dispenser, by passing the storage
cascade/cylinders with the help of priority panel, facilitating the refueling of vehicles at a faster rate.
Gas is filled in to the vehicles with the help of dispenser. This dual hose dispenser is capable of
handling two vehicles at a time.
ALL the CNG filling station equipment is foreign manufactured and imported on the specific
requirement of the sponsor by the authorized agent. At present the countries that manufacture CNG filling
station equipment rate, New Zealand, Italy, Canada and England.
We have selected a Canadian origin compressor viz, Gemini Compressor H302, Jordaire Model
J-H320 295-100E. This equipment is selected because of its low electricity consumption and higher outlet
pressure.
The total capacity of the selected equipment is 424m3/hr with a total power load of 200 KW.
The equipment will be delivered within 12 to16 weeks from the receipt of purchase order and
initial payment. The details of this equipment and accessories are available in Annexure 1.2.
SUPPLIERS
The central board of revenue (CBR) has specified the list of compressors, storage
cylinders vehicle cylinders, CNG machinery & equipment and conversion kits in SRO 38(1)/98.
In the case of our project the order for the machinery will be placed to the supplier at Lahore,
which will b supplied to us from Karachi port directly to our destination.
The list of some local agents dealing in the specific equipment and machinery is given below:
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
The whole equipment required for setting up a CNG filling station is imported.
Therefore, it is required to build an inventory of necessary spare parts to meet the unforeseen
circumstances such as breakdown or any other fault in any part or equipment. For this purpose, a
stock of necessary spare parts worth $8,000, which is equivalent to 484,000 rupees will be
imported along with other equipment to maintain a minimum level of spare parts for the 1st year
of operation.
Furniture and fixtures mainly include tables, chairs, sofas, fans & lights, carpe, curtains
and fire extinguishers. It is estimated that the furniture and fixture of Rs.85, 000 would be
purchased.
Some office equipment is also required for the proposed project. A provision of Rs.
100,000 has been made for acquiring the required office equipment. The details of office
equipment are annexed in Annexure______________
MANPOWER REQUIREMENT
Manpower requirement for the CNG filling station includes manager, cashier, dispenser,
operators, accountant, watchman and sweeper. There is not at all any problem to get the required
staff, with the specific requirements, from the area. The total staff strength would be 15 persons
for the two shifts. The basic salaries of the staff year one are as follows:
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Total 15 582,000
The details of the Wages and Salaries for the first five years that includes increments and
fringe benefits for are given Annexure # 3.2
COMPRESSION PROCESS
The compression process of CNG at CNG station is a multi steps process, it compress the
natural gas to 3600 per square inches (PSI) from 8 PSI.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
The machinery, which is used, for the compression of the natural gas is fully automatic and has
two main parts/ compressor.
1. Screw compressor
2. Main compressor
The screw compressor, compress the natural gas to 75 PSI from 8 PSI. for screw
compressor to work or to start compression minimum pressure of 8 PSI is require, which is
provided by the main gas pipeline by the supplies of GAS (SSGC). After the gas is compressed
to 75 PSI than it is send to radiator for cooling and than to filter for the filtering. After the
filtering the compressed gas is transfer to the main compressor.
The main compressor is consisted of four sub compressor which compress the gas at
different PSI. the first sub compressor of the main compressor receive the compressed gas at 75
PSI form the screw compressor it compress this 75 PSI to 220 PSI and than transfer it the next
sub compressor which compress this 220 PSI to 480 PSI, this than transfer to the next sub
compressor which compress it to 1200 PSI, which is transfer to next compressor which compress
it to 3600 PSI.
This compressed gas of 3600 PSI is than send to radiator for cooling and than to filter for
filtering before storage. After the cooling and filtering the compressed gas is transfer to the
storage cylinders from where is filled in the automobiles. Automobiles are filled at 2900 PSI
when the presser of stored gas decline and reach to 2900 PSI the machine or compressor starts
automatically again and the entire process is repeated again and when presser reaches to 3600
PSI than it stop automatically again.
ENVIRONMENTAL/ECOLOGICAL
ANALYSIS
ECOLOGICAL/ENVIRONMENTAL ANALYSIS
CNG is not hazardous to the environment as is the case with the traditional petroleum
fuel. It is highly of environment friendly nature. This is one of the main reasons that its demand
is continuously increasing and the Government is supporting it.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Due to the environment friendly and low cost of natural gas, Hydrocarbon Development
Institute of Pakistan (HDIP) has recognized the need and necessity to promote the use of CNG as
a fuel in automobiles.
Pishin city is one the most polluted cities of the country, it is almost because of the
unburned carbon practices in the atmosphere that is discharge as a result of the combustion
process of the petroleum products inside the vehicles. CNG is highly composed of methane gas
(i-e 90%) which is a non flammable gas and thus does not discharge unburned carbon in the
atmosphere.
The promotion of the CNG fueling projects will be a step towards the fight against pollution.
ECONOMIC ANALYSIS
ECONOMIC ANALYSIS
Natural gas is one of the most valuable natural resources abundantly available in our
country. With promotion of CNG fuel industry the dependency of the government on petroleum
products will be decreased. It will be a great support to the Pakistan’s economy, as it will help to
minimize the impact of petroleum products.
Hydrocarbon development institute of Pakistan has pioneered the use of environment
friendly CNG in road transport as an economically viable fuel, which can substitute the imported
petroleum products.
Moreover with the petroleum of less costly fuel the people will start switching from use
of Iranian petrol towards the CNG.as the demand of Iranian petrol has decreased the trend of
smuggling and illegally supplying Iranian petrol will be reduced and hence the economic burden
is relaxed from that aspect too.
With the start of this project our economy will be supported in a number of ways, a few
of them are discussed as under.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
EMPLOYMENT OPPORTUNITY
The project will provide employment opportunity to the people of Pishin District city, as
it needs a number of people to work for it, from the construction to the successful operation of
the business.
CONTRIBUTION TO GDP
The input materials, natural gas and electricity, will be utilized and will be converted to
the compressed natural gas. The value added to the input materials will be an addition to the
GDP of Pakistan.
TAX BENEFIT
The proposed project will benefit the government of Pakistan in the form of a number of
tax collections, such as, tax imposed on the income of a business, on the income of the
employees on the import of the CNG equipment, etc.
FOREIGN EXCHANGE
The people of Pakistan have been using the petroleum products such as fuel in their
automobiles, thus spending a huge amount of foreign exchange on import of petroleum products.
The proposed project will help to reduce our country’s dependence on foreign petroleum.
Because there are abundant supplies of natural gas in Pakistan, using natural gas to replace
gasoline will be more economic to the country and will help us to save foreign exchange.
“CNG” STATION
Three copies of prescribed application forms should be submitted with the following
documents. Application forms are available free of cost
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
In this section a list of the licenses and NOC's that are required for the CNG filling
station are given. It has been applied for Land is expected to be granted by the concerned
authorities.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
LICENSE
Obtaining a license from ministry of petroleum and natural resources is a ore requisite for
setting up a CNG station. The cost associated with license is Rs 25000.
After the installation of the required equipment for CNG filling station, HDIP will inspect
the working of the equipment, and once satisfier, will issue a certificate verifying that the
installed equipment is up to the required standard. Cost associated with this certification is Rs.
35000.
NOC'S
No objection certificate will be required from the following departments prior to the
commencement of business.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
INCENTIVES
Sales tax
The import of CNG equipment is exempt from sales tax vide SRO No.38(1)/98 dated 21st
January till October 31,2002
CUSTOM DUTY
The CNG equipment is also exempted from custom duties as per the above referred SRO.
REGULATORY REQUIREMENTS
QUALITY CERTIFICATE
SRO 38(1) dated 21st January 1998 has been amended on April 11, 2002 and the quality
certificate from original manufacture has been mandatory. This certificate should state that the
equipment meets the safety standard as laid down in Pakistan CNG rule 1992. The designated
third party inspector’s witness this quality certificate .the cost of third party inspection is $500.
LIST OF EQUIPMENTS
The list of equipment and their various manufacturers has been mentioned in the same
amended SRO whose import is exempted from custom duty and sales tax.
Income tax, at rate of 6% is payable by the importer on the import of CNG equipment.
INCOME TAX
The income of the CNG station is not exempted from the income tax. The investor has to
pay tax on her/his income according to the nature of the business entity.
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
ANNEXURE
Annexure 1
(Rs in 000)
FINANCIAL PLAN
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Annexure 1.1
COST OF BUILDING
Annexure 1.2
Description US $ Rs.
H302 Jodair Natural Gas Comressor 105,900 6,406,950
Remote mounted electrical control Included included
Gas cover system Included included
For upgrading up to 424 m3
One bank two line priority panel for buffer direct vehicle 2,652 158,813
filling
Storage cascade, 28 cylinders single bank cascade 10,800 653,400
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Dispenser (D38 High flow dual hose two line sequencing) 28,140 1,702,470
9,103,133
Income tax on the import of Machinery @6% 546,188
Third party inspection 500 30,250
Inland freight (Karachi port to destination) 30,000
Total Cost of Machinery 150,965 9,709,570
Annexure 2
Revenue
Quantity of gas sale per Vehicle: 12.9 m3
( i.e., Quantity demanded per vehicle on average
Annexure 2.1
=2,442,240m3/year
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
It means that 189 thousand cars will be filled per year if the project runs at its full
capacity.
As the project cannot take a start from a 100% capacity therefore the capacity of the first year
after having made a thorough analysis and visited the existing CNG station is projected as to be
75%. There will be a gradual increase in the capacity utilization of the proposed project.
The current rate or sales price pf the CNG fuel is Rs.17.51 (GST included)
Considering the inflation rate and market condition it is projected that there will be an increase
of 2.5% annually in the price of CNG fuel, so the projected prices of CNG for the first five years
are as follows:
REVENUE: WORKING
Annexure 3
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(Rs. In 000)
Annexure 3.1
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(Rs in 000)
Annexure 3.2
(Rs in 000)
Year of operation 1st year 2nd year 3rd year 4th year 5th
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
year
Basic salary 558 558 586 615 646
Increments @ 5% - 28 29 31 32
Total basic salary 558 586 615 646 678
Fringe benefits @40% 223 234 246 258 271
Total wages and salary 781 820 861 904 949
Annexure 3.3
FIXED CHARGES
Rate = Rs.381.11/kw/month
Charges = 381.11*150
VARIABLE CHARGES
Rate =5.25/kw/hour
Charges =5.25*150*16*360
=4,536,000
(Rs. In 000)
Year of operation Year 1 Year 2 Year 3 Year 4 Year 5
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Annexure 3.4
The whole equipment required for setting up CNG filling station is imported. Therefore,
it is required to build an inventory of necessary spare parts to meet the unforeseen circumstances
such as a breakdown or any other fault in any part or equipment. For the purpose, a stock of
necessary spare parts worth $8,000 which is equivalent to 484,000 rupees will be imported along
with other equipment to maintain a minimum level of spare parts for the 1st year of operation.
The amount of stores and spaces for the next four years as per requirement are shown below:
Annexure 3.5
(Rs. In 000)
Year of operation Year 1 Year 2 Year 3 Year 4 Year 5
1% 1.5% 2% 2% 2%
Machinery (9,710) 97 146 194 194 194
Building (3,631) 36 54 73 73 73
133 200 267 267 267
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(Rs. In 000)
Year of operation Year 1 Year 2 Year 3 Year 4 Year 5
Sales values 32,092 35,032 38,157 41,310 44,820
321 350 322 413 448
Annexure 3.6
DEPRECIATION
(Rs.in 000)
Annexure 4
(Rs. In 000)
Year of operation Year 1 Year 2 Year 3 Year 4 Year 5
Printing and stationary 20 20 25 25 30
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
CURRENT ASSETS
CURRENT LIABILITIES
Creditors
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(5% of sales)
(Rs. in 000)
Mark up on long
term financial
assistance 715 715 715 715 715
Mark up on short
term financial
assistance ---- ---- ---- ---- ----
(Rs. in 000)
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(Rs. in 000)
Year of operation End up const Year 1 Year 2 Year 3 Year 4 Year 5
period
Sources of funds
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
Application of funds
(Rs. in 000)
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
CURRENT ASSETS
CURRENT LIABILITIES
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
(Rs. in 000)
Break even in rupees = Fixed cost / (Selling value – variable cost / selling value)
= 6224 / (44820 – 22940 / 44820)
= 6224 * (44820 / 21880)
= 6224 * 2.05
= 12759
Capacity utilization to achieve break even = Break even in rupees / Sale at 100%
= 12759 / 472085
= 3%
RATIO ANALYSIS
PROFITABILITY RATIO
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
11458 / 32092 12233 / 35032 13638 / 38157 15022 / 41310 16609 / 44820
11343 / 32092 12113 / 35032 13503 / 38157 14882 / 41310 16464 / 44820
9034 / 32092 9688 / 35032 10870 / 38157 12042 / 41310 13348 / 44820
9034 / 18807 9688 / 23288 10870 / 33440 12042 / 44823 13348 / 57433
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
9034 / 27693 9688 / 36310 10870 / 46109 12042 / 57080 13348 / 69387
PROFITABILITY INDEX
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
a + (b – c)/ d
1 + 7286/12754
1 + 0.5712
1.5712years
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
6 8052 56767
7 7094 63861
8 6257 70118
9 5522 75640
10 8456 84096
a +( b-c )/ d
1 + 8701 / 9923
1 + 0.8768
1.8768
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
REFERENCES
1. http://www.nation.com.pk/pakistan-news-newspaper-daily-english-
online/Politics/13-Jul-2011/CNG-price-linked-to-55-per-cent-of-petrols
2. http://thefinancialdaily.com/news/top-stories/different-cng-in-pakistan-
68555.aspx
3. http://tribune.com.pk/story/208157/new-cng-pricing-formula-agreed-upon/
4. http://www.pakistannewsupdate.com/business/decision-time-ogra-admits-
irregularities-in-relocation-of-cng-stations/
5. www.ogra.org.pk/images/data/downloads/1305195982.doc
6. gee-21.org/publications/Development-of-CNG-Industry-in-Pakistan.pdf
7. http://www.pakcng.com/cng-news/National/news.asp
8. tribune.com.pk/.../hydrocarbon-ogdc-completes-study-on-local-exp
9. http://www.cngnow.com/EN-US/Vehicles/AroundTheWorld/Pages/default.aspx
10.http://www.pikeresearch.com/research/natural-gas-vehicles
11.http://www.cnbc.com/id/40794709/Natural_Gas_Vehicles_On_The_Road_To_Ac
ceptance
12.http://www.forbes.com/2008/07/30/natural-gas-cars-forbeslife-
cx_jm_0730cars.html
13.http://www.cngstations.com/vehicles-on-cng-ngv/
14.http://www.cngpump.com/aboutCNG.php
15.http://www.lngworldnews.com/gazprom-promotes-natural-gas-vehicles-in-
16.http://baftechnologies.com/blog/natural-gas-vehicles-around-the-world/
17.http://www.worldcng.com/
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
INDEXES
C F
Dispenser · 13 Introduction · 8
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.
23
Feasibility Study of installing CNG filling Station at the District Pishin (Group
assignment)
joint venture · 21 P
Jordaire Model · 15 prerequisites · 12
O W
Wages and Salaries · 17
opportunity for the new entrants · 11
By Mohammed Ayaz Khan (E) 15,Waseem Akram (E)11 Mohammad Imran(E)4 ,Sulaman
Shahzad (E)48 Institute of Management Sciences University of Balochistan Quetta.