Professional Documents
Culture Documents
Rubberdam YOOIL Brochure
Rubberdam YOOIL Brochure
Rubberdam YOOIL Brochure
Registered Office:
Plot No. A-125, A-126, A-125 (part), Road No. 22,
Wagle Industrial Estate, Thane 400 064
Corporate Office:
202 & 203, Ashoka Estate, 24Barakhamba Road,
Connaught Place, New Delhi -110001.
Tel: +91 11-4310 2841/ 4250 0194/ 4307 4474/ 4253 6152
Branches:
MUMBAI
23, Level 2, Kalpataru Square, Kondivita Lane,Off.
Andheri Kurla Road, Andheri (East), Mumbai - 400 059.
Tel: +91 22 4056 9999 Fax: +91 22 4056 9966
BANGALORE
No 203-204, 2nd Floor, Prestige Meridian 1,
MG Road, Bangalore 560 001
Tel: +91 80 4090 4793 / 4090 4794
Fax: +91 80 4090 4795
KOLKATA
RDP Boulevard Building, 8th Floor, Block EP &
GP, Plot K-1, Sector V, Salt Lake City,
Kolkata, West Bengal - 700091
Tel: +91 33 6637 4919/ 33 6637 4810
Innovation Business Patents and Intellectual
Ministry of maritime affairs EPC Certification Model certification Properties
‘삼백만불
수출의탑’
수상
YOOIL INFRA is a subsidiary of YOOIL ENGINEERING,
South Korea.
NUT NUT
CLAMPING PLATE
Patent CLAMPING PLATE
Abrasion indicating
coating EMBEDDED PLATE EMBEDDED PLATE
Outer / Upstream
Anchor bolt set
Embedded plate
Clamping plate
FIXING COMPONENTS
Anchor bolt
Inner / Downstream
RUBBER BLADDER
Embedded plate
Anchor bolt set
■ Maintenance
Simple patch can be applied on
the surface when patent abrasion
indicating coating is visible. Embedded plate
4
5
AUXILIARY COMPONENTS
Control With HMI PLC and SCADA, system can remotely control and
Panel monitor water level.
RUBBER Bottom
DAM water
discharge
valves
Possible standing water along upstream side abutment/pier
can escape to downstream through piping and valves.
Sluice gate Sluice gate next to Rubberdam can operate closely and control
control precise water discharge capacity.
AUXILIARY COMPONENTS
LED LED Lighted Rubberdam system for city scenery
Lighting
6
7
SUCCESSFUL PROJECTS BY YOOIL RELIABILITY OF YOOIL RUBBERDAM
SUPERVISORY AND COMMISSIONING
Expert of Rubberdam installer and expert commissioning supervisor from YOOIL
9
SIMPLE INSTALLATION
01 02 07 08
05 06 11 12
INSTALLATION STEPS
INSTALLATION STEPS
10
11
APPLICATIONS SPILLWAY
DIVERSION / AQUIFER DISCHARGE Adjusting level of dam accordingly as necessary to maintain water level.
Rubberdam offers an easy method of releasing and recapturing water.
IRRIGATION DIVERSION / AQUIFER DISCHARGE
SPILLWAY
12
13
DIVERSION WEIR FOR POWER GENERATION FLASH BOARD REPLACEMENT
Creating adequate storage and submergence for diverting flow to the intake Raising the crest elevation of existing dams and weirs to increase storage
structure connected to the power stations. capacity for the hydro power plant. Simply a better solution for flood control.
Stave River HEPP, BC, Canada Lower Bear Creek, BC, Canada
15
OLD RUBBERDAM REPLACEMENT
Most updated and advanced new Rubber bladder can simply replace old
Rubberdam and existing fixings / controls can be reused.