Edit Logsheet

Perubahan
Tanggal Jam Logsheet Data Ket
Sebelum Sesudah
5/21/2018 0:00 GTG LAP 1 ACC-COMP PANEL_Lube Test Press_0,83(Alarm) _Bar 0
5/21/2018 0:00 GTG LAP 1 Sum of ACC-COMP PANEL_Discharge Compressor_AD-4_Bar 0
5/21/2018 0:00 GTG LAP 1 Sum of ACC-COMP PANEL_Temp.Lube Oil Tank 23 QT_<16 0C Heater Start_0C 0
5/21/2018 0:00 GTG LAP 1 f ACC-COMP PANEL_Temp.Lube Oil Tank 23 QT_<16 0C Heater Start_0C 0
5/21/2018 0:00 GTG LAP 1 Sum of ACC-COMP PANEL_Temp.Lube Oil Header 26 QT_74/ 80 (Alarm / trip)_ 0
5/21/2018 0:00 GTG LAP 1 Sum of FUEL GAS_Press Gas ( P-101)_18,6 Bar ( Alarm )_Bar 0
5/21/2018 0:00 GTG LAP 1 Sum of FUEL GAS_Gas Out GCV_-_Bar 0
5/21/2018 10:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 031_°C 6739
5/21/2018 18:00 HRSG CR STEAM PROD_Outlet Super Heater 1_°c 79.38
5/21/2018 18:00 HRSG CR STEAM PROD_Pressure Steam_Bar 0.92
5/21/2018 00.00-22.00 SWITCGEAR LAP INC GTG_Voltage_Kv 0
5/21/2018 02,00-08.00 N2 LAP ioiii 0
5/22/2018 10:00 N2 LAP ioiii 0
5/22/2018 14.00-22.00 N2 LAP ioiii 0
5/23/2018 20:00 DEMIN LAP PRODUCT_FLOWRC_FLOW_m³/ h 144.3
5/23/2018 12:00 N2 LAP Power Compressor B 0.19
5/23/2018 16.00-22.00 SWITCGEAR LAP AUX 400V TO EXT PANEL_Current - T_A 6.448064
5/23/2018 0:00 HRSG CR STEAM PROD_OUT. ( A / M )_% 6
5/22/201820.00 s/d 22.00HRSG CR STEAM PROD_OUT. ( A / M )_% 11
5/22/2018 20:00 HRSG CR STEAM PROD_Outlet Preheater _°c 6
5/22/2018 10 s/d 12 HRSG CR Sum of DEAERATOR_O2 Deaerator_2 ppm 66.7
5/19/2018 22:00 GTG LAP 1 GEN-STATOR-TEMP_TE - 023. A_°C 0
5/23/2018 18 s/d 22 SWITCHGEAR CR OLTC_Tap Position_PKT - 1A _# 9
5/23/2018 14:00 PSA N2 CR COMPRESSOR B_Sump Pressure_Bar 3.7
5/23/2018 4:00 PSA N2 CR COMPRESSOR C_Sump Pressure_Bar 3.1
5/23/201800.00 s/d 02.00N2 LAP FI-KMI 0
5/23/2018 16:00 N2 LAP FI-KMI 0
5/23/2018 12:00 NS LAP Power Compressor B 0.19
5/23/2018 12:00 DEMIN LAP ALL 0
5/27/2018 12:00 GTG LAP 2 Generator_MVARh ERD_MVARh 229954
5/26/2018 12:00 GTG LAP 2 Generator_Voltage U. 1 - 2_kV 1
5/26/2018 4:00 GTG LAP 2 Generator_Arus I3_Amp 1045
5/25/2018 8:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 033_°C 27
5/26/2018 18:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 021. A_°C 6
5/27/2018 14:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 023. A_°C 0
5/25/2018 12:00 GTG LAP 2 GEN-HOT AIR-TEMP_T. Hot Air TE - 202_°C 38
5/25/2018 4:00 GTG LAP 2 EXH-TEMP_TTXD -10_°C 240
5/26/2018 6:00 GTG LAP 2 WS-TEMP_TTWS. 2 AO - 1_°C 83
5/25/2018 18:00 HRSG CR DEAERATOR_OUT.(A/M)_% 3
5/27/2018 6:00 SWITCHGEAR CR 11KV-SWGR_DEMAND-P_Aux. Trafo 11/6,6_MW 0
5/27/2018 10:00 SWG LAP EXT PANEL TR 800KVA_Current - T_A 0
25 s/d 27/05/201812.00 s/d 20.00PSA N2 LAP FI-KMI 0
5/25/2018 22:00 PSA N2 LAP ioiii 0
5/28/2018 6:00 GTG CR Turbine_Fuel stroke ref_FSR_% 16.5
5/30/2018 2:00 GTG CR Bearing Temp_TRB-BRG1 - MET_BJT 1-1_°C 7
5/30/2018 6:00 GTG LAP 2 EXH-TEMP_TTXD -07_°C 801
5/30/2018 10:00 GTG LAP 2 EXH-TEMP_TTXD -07_°C 206
5/29/2018 4:00 HRSG CR DEAERATOR_OUT.(A/M)_% 4
5/29/2018 6:00 HRSG CR DEAERATOR_OUT.(A/M)_% 4
5/30/2018 04.00 & 06.00 HRSG CR DEAERATOR_Cond Dearator._us / cm 0
5/29/2018 04.00 & 00.00 HRSG LAP DEAERATOR_Level CL 501 (> - 100cm Alarm)_cm 0
5/29/2019 18.00 & 20.00 HRSG LAP STEAM DRUM_Level CL 501 (> - 45cm Trip)_cm 0
5/30/2018 02.00 &18.00 HRSG LAP STEAM DRUM_Level CL 501 (> - 45cm Trip)_cm 0
5/28/2018 0:00 SWG CR 11KV-SWGR_DEMAND-P_KD-BKR-11_MW -15.91
5/29/2018 12.00 & 14.00 N2 LAP ioiii 0
6/3/2018 20:00 GTG CR Lube oil_Thrst Brg LO_LTBTIDD_°C 32
6/3/201808.00 S/D 14.00GTG CR Bearing Temp_TRB-BRG2 - MET_BJT 2-1_°C 6.4
6/2/2018 0:00 GTG LAP 2 EXH-TEMP_TTXD -04_°C 49
6/3/2018 8.00 s/d 14.00 HRSG LAP LINE GAS_Open C Valve AA 002_% 9
6/1/2018 20:00 SWG LAP POPKA_Current - T_A 632.394
5/18/201804.00 s/d 14.00N2 CR PSA_Purity AL 81_ppm 0
6/3/201808.00 S/D 14.00GTG CR Vibration_Vibration-1_BB1_mm/s 39
6/4/2018 10:00 GTG CR All 0
6/4/2018 4:00 GTG LAP 2 Generator_Arus I3_Amp 670
6/4/2018 16:00 HRSG CR DEAERATOR_Cond Dearator._us / cm 0
6/4/2018 16:00 HRSG CR STEAM DRUM_OUT. (A / M )_% 1.36
6/4/2018 18:00 HRSG CR STEAM DRUM_Cond. HP Drum._ us/cm 4.51
6/4/2018 10:00 PSA N2 CR All 0
6/4/2018 16:00 PSA N2 CR COMPRESSOR B_Sump Pressure_Bar 804
6/5/2018 10:00 PSA N2 CR COMPRESSOR C_Sump Pressure_Bar 3.1
6/5/2018 4:00 PSA N2 LAP PI-88 Inlet PSA 5.2
6/6/2018 20:00 SWG LAP INC GTG_Current - R_A 354
6/7/2018 2:00 PSA N2 CR KNI EXPORT-STEAM_Pressure PT - 10_Bar 1.6
6/7/2018 2:00 PSA N2 LAP Sum of Totally Flow - KMI 0
6/11/2018 06.00& 12.00 GTG CR Lube oil_Thrst Brg LO_LTBTIDD_°C 6
6/11/2018 22:00 GTG LAP 2 Generator_MVARh ERD_MVARh 233950
6/9/2018 14:00 HRSG CR DEAERATOR_Conden. Inlet Deaerator_°C 8.1
6/10/2018 10.00 & 12.00 HRSG CR DEAERATOR_O2 Deaerator_2 ppm 17
6/9/2019 22:00 HRSG CR STEAM PROD_Outlet Preheater _°c 0
6/10/2018 8:00 HRSG CR STEAM PROD_Outlet Super Heater 1_°c 66
6/11/2018 10:00 HRSG CR STEAM PROD_Pressure Steam_Bar 0.98
6/11/2018 10:00 HRSG CR STEAM PROD_Cond. HP Steam_us / cm 0
6/12/2018 12:00 GTG LAP 2 Generator_MVARh ERD_MVARh 230412
6/12/201812.00 s/d 16.00GTG LAP 2 EXH-TEMP_TTXD -02_°C 69
6/12/2018 08.00 & 14.00 HRSG LAP STEAM DRUM_Level CL 501 (> - 45cm Trip)_cm 0
6/19/2018 8:00 GTG LAP 2 Generator_Act. Power P_kW 1932
6/19/2019 20.00 & 22.00 SWG LAP POPKA_Current - T_A 234.9232
6/19/2018 16:00 DEMIN LAP PRODUCT_FROM POPKA_FIQ - (Total)_m3 19145
6/24/2018 04.00 & 06.00 GTG CR Lube oil_Turb Brg-2 LO_LTB2D_°C 0
6/24/2018 20:00 GTG LAP 2 Generator MVARh ERD MVARh 2307549
6/23/2018 22:00 HRSG LAP Line GAS_Running CAF 8.7
6/22/2018 20:00 HRSG LAP BFW Pump_suction press 0.2
6/23/2018 4:00 SWGR LAP INC GTG_Current - T_A 1.778974
6/23/2018 6:00 SWGR LAP INC GTG_Current - T_A 1.779295
6/25/2018 0:00 PSA CR KNI EXPORT-STEAM_RATE FT - 03_Ton/h 0
6/25/2018 0:00 PSA CR KNI EXPORT-STEAM_Pressure PT - 10_Bar 0
6/25/2018 0:00 PSA CR KNI EXPORT-STEAM_Temperature TE - 01_degC 0
6/24/2018 2:00 PSA LAP TI-300 0
6/23/2018 20:00 PSA LAP power comp B 0
6/23/2018 20:00 PSA LAP power comp c 0
6/23/2018 2:00 SWRO CR SWRO B_VSD HP_Freq. HP Pump A_Hz 2.2
6/24/2018 2:00 SWRO CR BWRO A_AIT 301 A_BWRO feed pH_pH 0.6
6/25/2018 0:00 SWRO LAP UF-A_PID 102 A_Outlet AMIAD A_bar 23553
6/23/2018 16.00&20.00 SWRO LAP UF-B_FI 103 B_UF X- flow Total_m3 431326
6/24/2018 All SWRO LAP UF-B_FI 103 B_UF X- flow Total_m4 431326
6/25/2018 0:00 SWRO LAP UF-B_FI 103 B_UF X- flow Total_m5 431326
6/25/2018 18:00 GTG LAP 2 Generator_Voltage.Battery 125 VDC_VDC 29
6/25/2018 10:00 GTG LAP 2 WS-TEMP_TTWS. 2 FO - 1_°C 425
6/27/2018 14:00 GTG CR Vibration_Vibration-10_BB10_mm/s 0.2
6/26/2018 8:00 GTG CR Spread Temp_Exsh spread-1_TTXSP1_°C 2.9
6/26/2018 22:00 GTG LAP 2 Generator_Arus I1_Amp 136
6/27/2018 12.00 & 14.00 GTG LAP 3 WS-TEMP_TTWS. 3 FO - 1_°C 340 & 342
6/27/2018 6:00 HRSG LAP BFW PUMP_PDI CP501 (1)_Bar 2
6/26/2018 4:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:2 666
6/26/2018 14:00 SWGR LAP INC GTG_Current - T_A 1.175083
6/27/2018 14:00 PSA N2 LAP COMPRESSOR C_Sump Pressure_Bar 3.1
6/27/2018 2:00 PSA N2 LAP Total Power Comp A&B 17427.1
6/27/2018 4:00 PSA N2 LAP Total Power Comp A&B 14429.8
6/26/2018 4:00 SWRO LAP UF-A_FI 102 A_UF product Total_m3 1190912
6/26/2018 8:00 SWRO LAP COMP-B_Air Compressor Tot. Hour__h 12953.52
6/27/2018 10.00 - 14.00 SWRO LAP MCC_Voltage__V 38
6/28/2018 2:00 GTG LAP 2 WS-TEMP_TTWS. 3 FO - 1_°C 340
6/29/2018 0:00 HRSG CR DEAERATOR_pH Dearator_8.5-9 1.05
6/28/2018 4:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:1 0
6/28/2018 4:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:2 0
6/28/2018 4:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:7 0
6/28/2018 4:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:8 0
6/28/2018 16:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 36.9678
6/28/2018 2:00 SWGR LAP POPKA_Current - T_A 636.01432
6/28/2018 4:00 SWGR LAP POPKA_Current - T_A 636.03252
6/28/2018 6:00 SWGR LAP POPKA_Current - T_A 636.06854
6/28/2018 12:00 SWGR LAP KPI_Current - T_A 40.471365
6/28/2018 22:00 PSA N2 LAP TI-300 0.5
6/28/2018 16:00 SWRO CR SWRO B_PIT 203 B_SWRO reject Pressure_bar 0.8
6/28/2018 16:00 SWRO CR DP SWRO B (Bar) 37.3
6/28/2018 2:00 SWRO LAP SW_LI 401_UF feed tank level_m 7560
6/30/2018 22:00 GTG CR All
7/2/2018 0:00 GTG CR Compressor_Comp disch temp_CTDA2_°C 12
7/1/2018 20:00 GTG CR Vibration_Vibration-2_BB2_mm/s 804
7/1/2018 18:00 GTG CR Spread Temp_Exsh temp_TTXM_°C 96
6/30/2018 22:00 HRSG CR All 0
6/29/2018 8:00 HRSG CR DEAERATOR_O2 Deaerator_2 ppm 122.7
7/1/2018 16:00 HRSG CR STEAM PROD_PV. Outlet SH 1_°c 69
7/1/2018 16:00 HRSG CR STEAM PROD_Outlet Preheater _°c 97
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:1 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:2 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:7 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:8 0
6/29/2018 10:00 SWGR CR 33KV-SWGR_GEN-PF_KDM_Lag 0
6/30/2018 02.00-22.00 SWGR LAP All
6/29/2018 12:00 PSA N2 LAP COMPRESSOR A_Air End Temperature_degC 926
6/29/2018 12:00 PSA N2 LAP KNI EXPORT-STEAM_Temperature TE - 01_degC 438.96
6/30/2018 10:00 SWRO CR T402_T-402_Level UF Product_m 138.1
6/30/2018 02.00-22.00 SWRO LAP All
7/2/2018 22:00 GTG CR Spread Temp_Allwd spread_TTXSPL_°C 91.7
7/2/2018 12:00 GTG LAP 1 COOLING WATER _Temp Inlet Exhaust_TI -152_0C 42
7/2/2018 8:00 GTG LAP 2 Generator_Voltage U. 2 - 3_kV 1.03
7/2/2018 8:00 GTG LAP 2 WS-TEMP_TTWS. 3 AO - 2_°C 0
7/2/2018 22:00 HRSG CR STEAM DRUM_OUT. (A / M )_% 14.22
7/2/2018 22:00 HRSG CR STEAM DRUM_Flow Steam_kg/s 22
7/2/2018 22:00 HRSG CR STEAM DRUM_Pressure Steam Drum_Bar 13.82
7/2/2018 16:00 HRSG CR STEAM DRUM_pH HP Steam Drum_9.5-9.8 0.95
7/2/2018 20:00 HRSG LAP LINE GAS_Press D Stream CP 502 (1.5 Bar Trip)_Bar 0.08
7/2/2018 20.00 & 22.00 HRSG LAP LINE GAS_Open C Valve AA 002_% 18
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:1 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:2 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:7 0
6/30/2018 6:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 90 degC)_No:8 0
7/2/2018 12:00 HRSG LAP LOADING CHEMICAL_Na3Po4_kg 12
7/2/2018 6:00 SWGR LAP INC GTG_Voltage_kV 1132
6/30/2018 12:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 36
6/30/2018 14:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 36.000952
6/29/2018 12:00 SWGR LAP AUX 6.6KV_Current - T_A 27.92131
6/30/2018 20.00 & 22.00 PSA N2 LAP PI81 Air R T Pressure 0
7/2/2018 14:00 PSA N2 LAP 1PI-80 Nitrogen To N2 RT 738
7/1/2018 16:00 PSA N2 LAP TI-300 2.7
7/2/2018 16.00 & 18.00 PSA N2 LAP FI-KMI 0
7/2/2018 18:00 PSA N2 LAP Totally Flow - KMI 0
7/2/2018 22:00 PSA N2 LAP Power Compressor A 3330
6/29/2018 6:00 SWRO CR UF B_PIT 104 B_Pressure Outlet UF B_bar 0.49
7/1/2018 6:00 SWRO LAP UF-B_FI 102 B_UF product Total_m3 1275316
6/29/2018 12:00 SWRO LAP BWRO A_FIT 301 A_BWRO permeate Total_m3 1321008.21
7/4/2018 0:00 GTG CR Generator_Reactive Power_MVAR_Mvar 3.5
7/3/2018 12:00 GTG LAP 2 EXH-TEMP_TTXD -04_°C 469
7/4/2018 0:00 HRSG CR STEAM PROD_PV Steam Temperature_°C 450
7/3/2018 12:00 HRSG LAP DEAERATOR_Press CP501 (< 0.3 Bar Alarm)_Bar 1.9
7/3/2018 12:00 PSA N2 LAP 1PI-82 Press Adsober A 7.4
7/3/2018 6:00 SWRO LAP SWRO B_FIT 201 B_SWRO Inlet ERI Total_m3 902034
7/4/2018 12:00 GTG LAP 2 Generator_React. Power Q_kVAR 118232
7/4/2018 20:00 GTG LAP 2 EXH-TEMP_TTXD -05_°C 525
7/4/2018 20:00 GTG LAP 2 EXH-TEMP_TTXD -06_°C 529
7/4/2018 18:00 GTG LAP 2 EXH-TEMP_TTXD -13_°C 208
7/4/2018 6:00 HRSG CR STEAM DRUM_Flow Steam_kg/s 3.79
7/4/2018 16:00 HRSG LAP LINE GAS_Press D Stream CP 502 (1.5 Bar Trip)_Bar 0.28
7/4/2018 22:00 SWGR LAP All 0
7/5/2018 0:00 PSA N2 CR PSA_Opening V 567_% 94
7/5/2018 0:00 SWRO LAP SW_FI 101_Totalizer_m3 116329
7/5/2018 4:00 GTG CR Vibration_Vibration-10_BB10_mm/s 0.9
7/8/2018 12.00 & 14.00 GTG CR Spread Temp_Allwd spread_TTXSPL_°C 6904
7/8/2018 10:00 GTG CR Spread Temp_Exsh spread-1_TTXSP1_°C 3446
7/6/2018 14:00 GTG LAP 2 Generator_MWh EAD_MWh 1.183307
7/6/2018 8:00 GTG LAP 2 Generator_MVARh ERD_MVARh 231158
7/6/2018 18:00 GTG LAP 2 Generator_Arus I2_Amp 4596
7/7/2018 22:00 GTG LAP 2 Generator_Arus I3_Amp 147
7/6/2018 20:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 033_°C 4.9
7/7/2018 10:00 GTG LAP 2 EXH-TEMP_TTXD -05_°C 55
7/8/2018 6:00 HRSG CR DEAERATOR_OUT.(A/M)_% 0
7/8/2018 14:00 HRSG CR DEAERATOR_OUT. (A / M )_% 46
7/7/2018 20:00 HRSG CR STEAM PROD_PV. Outlet SH 1_°c 45
7/6/2018 2:00 HRSG CR STEAM PROD_Outlet Preheater _°c 91
7/6/2018 6:00 HRSG CR STEAM PROD_Outlet Super Heater 1_°c 454
7/5/2018 02.00-06.00 SWGR CR 11KV-SWGR_DEMAND-P_UBS 6_MW 0
7/6/2018 20:00 SWGR LAP K P A_Current - T_A 159.50683
7/7/2018 10:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.11
7/8/2018 12:00 SWRO CR UF A_PIT 103 A_Pressure Inlet UF A_bar 348
7/6/2018 8:00 SWRO CR UF A_PIT 104 A_Pressure Outlet UF A_bar 2.71
7/7/2018 4:00 SWRO CR UF C_PID 101 C_DP Amiad B_bar 128.8
7/7/2018 4:00 SWRO CR UF C_PIT 103 C_Pressure Inlet UF B_bar 40191
7/7/2018 4:00 SWRO CR UF C_PIT 104 C_Pressure Outlet UF B_bar 23.7
7/7/2018 10:00 SWRO CR UF C_TMP C_Trans Membrane Press_bar 52.8
7/8/2018 12:00 SWRO CR UF C_TMP C_Trans Membrane Press_bar 53.4
7/6/2018 0:00 SWRO LAP SW_FI 101_Totalizer_m3 119322
7/6/2018 16:00 SWRO LAP UF-A_PI 102 A_Discharge pressure P-102 A_bar 88
7/8/2018 10.00-14.00 SWRO LAP BWRO A_FIT 301 A_BWRO permeate Total_m3 141182
7/5/2018 16:00 SWRO LAP CHEM-DOSING_Chlorine Dosing for CEB_Stroke_% 125
7/5/2018 4:00 SWRO LAP CHEM-DOSING_Chlorine Dosing for CEB_PI_kg/cm² 130
7/5/2018 4:00 SWRO LAP COMP-A_Air Compressor Tot. Hour__h 12199.40
7/6/2018 12:00 SWRO LAP COMP-A_Air Compressor Tot. Hour__h 11235.46
7/9/2018 18:00 GTG CR Lube oil_Turb Brg-1 LO_LTB1D_°C 2
7/9/2018 2:00 GTG CR Lube oil_Red gear LO_LTRGCD_°C 60
7/9/2018 14:00 HRSG CR DEAERATOR_OUT. (A / M )_% 4
7/9/2018 10:00 HRSG LAP BFW PUMP_Suction Press (> 1.2)_Bar 0.125
7/9/2018 22:00 HRSG LAP BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:2 3
7/9/2018 20:00 HRSG LAP LOADING CHEMICAL_Na3Po4_kg 15
7/9/2018 02.00-18.00 PSA N2 LAP Totally Flow - KMI 0
7/9/2018 22:00 PSA N2 LAP Totally Flow - KMI 0
7/7/2018 20:00 PSA N2 LAP Totally Flow - KMI 0
7/9/2018 10:00 PSA N2 LAP Total Power Comp A&B 145022.1
7/9/2018 18:00 PSA N2 LAP Total Power Comp A&B 145080.2
7/10/2018 0:00 SWRO LAP SWRO B_PI 207 B_SWRO permeate Press_bar 1.11
7/3/2018 12:00 HRSG LAP DEAERATOR_Press CP501 (< 0.3 Bar Alarm)_Bar 1.9
7/6/2018 2:00 SWGR CR 33KV-SWGR_GEN-P_Kaltim 3_MW 253
7/7/2018 20:00 PSA N2 LAP Pressure Discharge B 0
7/7/2018 22:00 PSA N2 LAP Pressure Discharge B 0
7/2/2018 22:00 SWRO CR UF C_PIT 104 C_Pressure Outlet UF B_bar 16
7/6/2018 8:00 SWRO CR UF A_PIT 104 A_Pressure Outlet UF A_bar 2.71
7/6/2018 16:00 SWRO LAP UF-A_PI 102 A_Discharge pressure P-102 A_bar 88
7/10/2018 20:00 GTG CR Spread Temp_Allwd spread_TTXSPL_°C 6934
7/10/2018 22:00 GTG LAP 2 Generator_Arus I1_Amp 14949
7/10/2018 18:00 HRSG CR STEAM PROD_Outlet Preheater _°c 355
7/10/2018 20:00 HRSG LAP DEAERATOR_Press CP501 (< 0.3 Bar Alarm)_Bar 9
7/10/2018 20:00 SWGR CR 11KV-SWGR_DEMAND-P_Pelabuhan_MW 0
7/10/2018 8:00 PSA N2 CR PSA_Opening V 567_% 94
7/10/2018 20:00 PSA N2 CR PSA_Flow INTEGRASI ( FT-300 )_Nm3/Hr 5020
7/10/2018 18:00 PSA N2 CR COMPRESSOR A_Discharge Pressure_Bar 5
7/10/2018 16:00 PSA N2 CR KNI EXPORT-STEAM_Pressure PT - 10_Bar 7
7/10/2018 22:00 PSA N2 CR KNI EXPORT-STEAM_Temperature TE - 01_degC 439.07
7/10/2018 22:00 PSA N2 LAP Pressure Discharge B 83
7/10/2018 14.00 & 22.00 PSA N2 LAP Totally Flow - KMI 0
7/10/2018 22:00 SWRO CR SWRO B_PIT 203 B_SWRO reject Pressure_bar 90.5
7/10/2018 14:00 SWRO LAP COMP-B_Air Compressor Pressure__bar 0
7/10/2018 14:00 SWRO LAP COMP-B_Air Compressor Temperature__deg C 0
7/10/2018 14:00 SWRO LAP COMP-B_Air Compressor Tot. Hour__h 0
7/10/2018 14:00 SWRO LAP COMP-B_Air Compressor Pressure Tank__bar 0
7/10/2018 14:00 SWRO LAP MCC_INCOMING__kWH 0
7/11/2018 6:00 GTG LAP 2 WS-TEMP_TTWS. 2 AO - 1_°C 687
7/11/2018 22:00 HRSG CR NG HEADER_PV. Natural Gas Pressure_% 0
7/11/2018 8:00 SWGR LAP INC GTG_Current - T_A 1.1862792
7/11/2018 12:00 SWGR LAP AUX 6.6KV_Current - T_A 27.757
7/11/2018 20:00 PSA N2 LAP Totally Flow - 300 11.581
7/11/2018 12.00 & 14.00 SWRO LAP SW_PI 101_Discharge pressure P-101A_kg/cm² 0
7/11/2018 12:00 SWRO LAP T402_LI 402_UF Product tank level_m 0
7/11/2018 12:00 SWRO LAP CHEM-DOSING_SWRO B feed Anti scalant Dosing_PI_kg/cm² 80
7/12/2018 8:00 GTG CR Turbine_Speed_TNH_% 100.2
7/12/2018 6:00 GTG CR Vibration_Vibration-5_BB5_mm/s 1.8
7/12/2018 6:00 GTG CR Vibration_Vibration -11_BB11_mm/s 95
7/12/2018 6:00 GTG CR Vibration_Vibration -12_BB12_mm/s 77
7/12/2018 6:00 HRSG CR STEAM PROD_Outlet Super Heater 1_°c 826
7/12/2018 6:00 HRSG CR NG_Temperature Stack_°C 279
7/12/2018 18:00 HRSG CR TOTALIZER_Level Demin Tank_M 0
7/12/2018 6:00 SWGR CR OLTC_Tap Position_PKT - 1B_# 1
7/10/2018 20:00 SWGR CR 11KV-SWGR_DEMAND-P_UBS 6_MW 0.6
7/10/2018 20:00 SWGR CR 11KV-SWGR_DEMAND-P_Coal Boiler_MW 0.59
7/11/2018 18:00 SWGR CR 11KV-SWGR_DEMAND-P_Pelabuhan_MW 2.12
7/12/2018 4:00 SWGR LAP INC GTG_Current - T_A 1.870418
7/12/2018 6:00 SWGR LAP POPKA_Current - T_A 604.48924
7/12/2018 14:00 PSA N2 LAP FI-KMI 0
7/12/2018 14:00 PSA N2 LAP Totally Flow - KMI 0
7/12/2018 14:00 SWRO CR SWI_FIT 101_Flow_m3/h 13.1
7/12/2018 6:00 SWRO CR SWRO B_FIT 202 B_SWRO feed flow _m3/h 1.8
7/12/2018 6:00 SWRO CR BWRO A_FIT 301 A_BWRO permeate flow _m3/h 6.5
7/13/2018 6:00 GTG CR Lube oil_Turb Brg-1 LO_LTB1D_°C 0
7/13/2018 6:00 GTG CR Lube oil_Turb Brg-2 LO_LTB2D_°C 0
7/13/2018 6:00 GTG CR Lube oil_Red gear LO_LTRGCD_°C 0
7/16/2018 0:00 GTG CR Spread Temp_Allwd spread_TTXSPL_°C 6934
7/14/2018 12:00 GTG LAP 2 Generator_Voltage U. 3 - 1_kV 10.69
7/13/2018 14:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 031_°C 5
7/14/2018 06.00 & 08.00 GTG LAP 2 EXH-TEMP_TTXD -07_°C 34
7/14/2018 0:00 SWGR CR 11KV-SWGR_DEMAND-P_UBS 6_MW 1
7/14/2018 12:00 SWGR LAP POPKA_Current - T_A 640.0162
7/15/2018 4:00 PSA N2 LAP PI81 Air R T Pressure 0
7/15/2018 4:00 PSA N2 LAP PI-90 N2 Booster 0.2
7/14/2018 4:00 SWRO CR SWRO B_AI 202 B_SWRO permeate cond._µs/cm 2.976
7/13/2018 22:00 SWRO LAP SWRO B_PI 201 B_Catr. filter inlet press. _bar 2.45
7/13/2018 4:00 SWRO LAP SWRO B_FIT 204 B_SWRO Outlet ERI Total_m3 854590
7/14/2018 4:00 SWRO LAP MCC_INCOMING__kWH 7.7668176
7/13/2018 18.00 & 20.00 Demin LAP PRODUCT_FLOW RC_Flow_m3/h 0
7/14/2018 8:00 Demin LAP PRODUCT_FROM POPKA_FIQ - (Total)_m3 213.352
7/16/2018 18:00 GTG LAP 2 EXH-TEMP_TTXD -04_°C 540
7/16/2018 4:00 HRSG LAP DEAERATOR_Temperatur CT 501 (> 104OC Alarm)_degC 12935
7/16/2018 4:00 PSA N2 LAP Pressure Discharge B 0
7/16/2018 4:00 PSA N2 LAP PI81 Air R T Pressure 0
7/16/2018 02.00 & 04.00 PSA N2 LAP Totally Flow - KMI 0
7/16/2018 6:00 SWRO CR SWRO B_AIT 201 B _SWRO feed ORP_mV 1.9
7/17/2018 08.00 & 10.00 GTG LAP 2 WS-TEMP_TTWS. 3 FO - 1_°C 34
7/17/2018 4:00 HRSG CR DEAERATOR_Temperature Dearator _°C 129.2
7/17/2018 14:00 HRSG CR STEAM PROD_PV Steam Temperature_°C 780
7/17/2018 20:00 SWGR LAP AUX 6.6KV_Current - T_A 37.82917
7/17/2018 22:00 SWGR LAP AUX 6.6KV_Current - T_A 37.830156
7/17/2018 12:00 PSA N2 LAP AL-81 (Analyzer Product) 0
7/17/2018 4:00 SWRO CR BWRO A_AIT 301 A_BWRO feed pH_pH 64
7/17/2018 2:00 Demin LAP MB-A_INLET_Counter Flow_m3 16750
7/18/2018 20:00 GTG CR Lube oil_Red gear LO_LTRGCD_°C 63
7/18/2018 8:00 GTG CR Vibration_Vibration-5_BB5_mm/s 804
7/18/2018 4:00 GTG LAP 2 Generator_Voltage U. 1 - 2_kV 1
7/18/2018 20:00 GTG LAP 2 WS-TEMP_TTWS. 1. FO - 2_°C 434
7/18/2018 6:00 GTG LAP 2 EXH-TEMP_TTXD -04_°C 457
7/18/2018 2:00 GTG LAP 2 WS-TEMP_TTWS. 3 FO - 1_°C 34
7/18/2018 10:00 HRSG CR STEAM DRUM_Pressure Steam Drum_Bar 8
7/18/2018 12:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.307985
7/18/2018 10:00 SWGR LAP POPKA_Current - T_A 642.10542
7/18/2018 12:00 SWGR LAP POPKA_Current - T_A 642.13526
7/18/2018 20:00 PSA N2 CR COMPRESSOR A_Discharge Pressure_Bar 5.1
7/18/2018 22:00 PSA N2 CR KNI EXPORT-STEAM_Pressure PT - 10_Bar 9.5
7/18/2018 02.00 & 04.00 SWRO LAP SW_FI 101_Totalizer_m3 0
7/20/2018 0:00 HRSG CR All Recheck
7/19/2018 16:00 SWGR CR 11KV-SWGR_DEMAND-P_Aux. Trafo 11/6,6_MW 4.58
7/19/2018 10:00 SWGR CR 11KV-SWGR_DEMAND-P_KMI_MW 1.26
7/19/2018 10:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.251523
7/19/2018 12:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.26525
7/19/2018 10:00 SWGR LAP KPI_Current - T_A 50.001382
7/19/2018 12:00 SWGR LAP KPI_Current - T_A 50.003748
7/19/2018 12:00 SWRO LAP CHEM-DOSING_SWRO B feed SMBS Dosing_PI_kg/cm² 88
7/20/2018 18:00 GTG CR Generator_Frequency_DF_Hz 10
7/21/2018 2:00 GTG CR Turbine_Speed_TNH_% 10
7/22/2018 4:00 GTG CR Turbine_Speed ref_TNR_% 102.05
7/20/2018 20.00 & 22.00 GTG LAP 2 All 0
7/21/2018 10:00 GTG LAP 2 Generator_Voltage U. 2 - 3_kV 12.05
7/22/2018 14:00 GTG LAP 2 WS-TEMP_TTWS. 1. FO - 1_°C 697
7/21/2018 18:00 HRSG CR NG HEADER_PV. Natural Gas Pressure_% 25.34
7/21/2018 18.00 & 20.00 HRSG LAP All 0
7/22/2018 6:00 SWGR CR 11KV-SWGR_DEMAND-P_Coal Boiler_MW 30
7/20/2018 20:00 SWGR CR 33KV-SWGR_GEN-P_KDM_MW 5.12
7/23/2018 0:00 SWGR CR OLTC_Tap Position_PKT - 1B_# 0
7/20/2018 22:00 SWGR LAP K P A_Current - T_A 160.53413
7/21/2018 16.00 - 20.00 PSA N2 LAP All 0
7/20/2018 10:00 PSA N2 LAP AL-81 (Analyzer Product) 21.7
7/23/2018 0:00 Demin LAP MB-B_INLET_Flow_m3/h 4676
7/24/2018 0:00 GTG CR Spread Temp_Exsh temp_TTXM_°C 5.1
7/24/2018 0:00 GTG LAP 2 EXH-TEMP_TTXD -08_°C 34
7/23/2018 6:00 HRSG CR NG_OUT. (A / M )_% 0
7/23/2018 6:00 HRSG CR NG_Pressure Natural Gas_°C 38
7/24/2018 0:00 HRSG CR NG_Temperature Furnance_°C 5.2
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_PCV Gas Header Open_% 0
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_Press U Stream CP 501 (2 Bar Trip)_Bar 0
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_Press D Stream CP 502 (1.5 Bar Trip)_Bar 0
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_Press Pilot Gas CP 503 (> 150 )_bar 0
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_Open C Valve AA 002_% 0
7/23/2018 12.00 & 14.00 HRSG LAP LINE GAS_Running C A F : Apo 10 - Apo 11_10/11 0
7/23/2018 12.00 & 14.00 HRSG LAP BFW PUMP_Current (< 74 A Trip)_A 0
7/23/2018 12.00 & 14.00 HRSG LAP BFW PUMP_Suction Press (> 1.2)_Bar 0
7/23/2018 12.00 & 14.00 HRSG LAP BFW PUMP_ Disch Press CP 502 (110)_Bar 0
7/24/2018 14:00 HRSG CR STEAM PROD_Outlet Preheater _°c 5
7/24/2018 6:00 HRSG CR NG_OUT. (A / M )_% 2
7/24/2018 22:00 HRSG LAP LINE GAS_PCV Gas Header Open_% 0
7/24/2018 22:00 HRSG LAP LINE GAS_Press U Stream CP 501 (2 Bar Trip)_Bar 0
7/24/2018 22:00 HRSG LAP LINE GAS_Press D Stream CP 502 (1.5 Bar Trip)_Bar 0
7/24/2018 22:00 HRSG LAP LINE GAS_Press Pilot Gas CP 503 (> 150 )_bar 0
7/24/2018 22:00 HRSG LAP LINE GAS_Open C Valve AA 002_% 0
7/24/2018 22:00 HRSG LAP LINE GAS_Running C A F : Apo 10 - Apo 11_10/11 0
7/24/2018 22:00 HRSG LAP BFW PUMP_Current (< 74 A Trip)_A 0
7/24/2018 22:00 HRSG LAP BFW PUMP_Suction Press (> 1.2)_Bar 0
7/24/2018 22:00 HRSG LAP BFW PUMP_ Disch Press CP 502 (110)_Bar 0
7/24/2018 14:00 SWGR LAP POPKA_Current - T_A 643.51136
7/24/2018 4:00 PSA N2 CR KNI EXPORT-STEAM_Temperature TE - 01_degC 493.75
7/25/2018 2:00 GTG CR Vibration_Vibration-1_BB1_mm/s 5.6
7/26/2018 4:00 GTG LAP 2 Generator_Voltage.Battery 125 VDC_VDC 126
7/25/2018 8:00 GTG LAP 2 GEN-STATOR-TEMP_TE - 023. A_°C 761
7/25/2018 6:00 GTG LAP 2 EXH-TEMP_TTXD -04_°C 837
7/25/2018 4:00 HRSG LAP DEAERATOR_Open CV Steam_% 1
7/26/2018 12:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.428542
7/26/2018 0:00 PSA N2 CR PSA_Totalizer Integrasi_Nm3 8817796.17
7/25/2018 4:00 PSA N2 CR COMPRESSOR B_Air End Temperature_degC 8
7/26/2018 02.00 & 04.00 PSA N2 LAP AL-81 (Analyzer Product) 0
7/26/2018 12:00 PSA N2 LAP PI-85 N2 after Filter 832
7/28/2018 8:00 GTG CR Generator_Voltage_DVX_kV 50.01
7/29/2018 2:00 GTG CR Turbine_Speed_TNH_% 100.2
7/27/2018 22:00 GTG CR Compressor_Comp disch temp_CTDA2_°C 15
7/28/2018 22:00 GTG CR STEAM PROD_PV Steam Temperature_°C 47
7/28/2018 12:00 GTG Lap 2 Generator_Act. Power P_kW 12.376
7/29/2018 8:00 GTG Lap 2 Generator_Voltage U. 2 - 3_kV 1.01
7/30/2018 0:00 GTG Lap 2 EXH-TEMP_TTXD -13_°C 48
7/28/2018 16:00 SWGR LAP INC GTG_Voltage_kV 1014
7/28/2018 18:00 SWGR LAP INC GTG_Voltage_kV 1105
7/28/2018 20:00 SWGR LAP INC GTG_Voltage_kV 1104
7/27/2018 22:00 SWGR LAP AUX 400V TO EXT PANEL_Current - T_A 37.47
7/28/2018 4:00 PSA N2 LAP 1PI-82 Press Adsober A 4
7/27/2018 10:00 PSA N2 LAP TI-300 303
7/30/2018 12:00 GTG CR Turbine_GRV Gas rev_FPRG_Bar 46.5
7/30/2018 6:00 HRSG CR STEAM DRUM_OUT. (A / M )_% 30
7/30/2018 22:00 HRSG CR STEAM PROD_PV Steam Temperature_°C 46
7/30/2018 14:00 PSA N2 CR COMPRESSOR B_Separator Drop_Bar 0.5
7/30/2018 22:00 GTG Lap 2 All 0
7/30/2018 22:00 PSA N2 LAP Pressure Discharge B 834
7/30/2018 20:00 PSA N2 LAP PI-85 N2 after Filter 0.20
7/30/2018 12:00 PSA N2 LAP FI-KMI 130
7/30/2018 20:00 PSA N2 LAP Total Power Comp A&B 1491789.10
7/31/2018 12:00 GTG Lap 2 EXH-TEMP_TTXD -02_°C 564
7/30/2018 22:00 SWGR CR OLTC_Tap Position_PKT - 1B_# 0
8/1/2018 4:00 GTG Lap 2 EXH-TEMP_TTXD -05_°C 379
8/1/2018 20:00 SWGR LAP AUX 6.6KV_Current - T_A 27.00
8/1/2018 22:00 SWGR LAP AUX 6.6KV_Current - T_A 27.00
7/31/2018 12:00 PSA N2 CR PSA_Purity AL 81_ppm 41.87
7/31/2018 4:00 PSA N2 LAP FI-300 4.93
8/5/2018 14:00 GTG CR Lube oil_Thrst Brg LO_LTBTIDD_°C 0
8/3/2018 8:00 GTG CR Lube oil_Turb Brg-1 LO_LTB1D_°C 9.00
8/3/2018 22:00 GTG CR Spread Temp_Exsh temp_TTXM_°C 76.00
8/4/2018 6:00 GTG CR Spread Temp_Allwd spread_TTXSPL_°C 30.20
8/5/2018 4:00 GTG Lap 2 Generator_Act. Power P_kW 0
8/2/2018 4:00 HRSG CR DEAERATOR_Conden. Inlet Deaerator_°C 9101
8/5/2018 18:00 HRSG CR STEAM DRUM_OUT. (A / M )_% 0
8/5/2018 8:00 HRSG CR STEAM DRUM_Pressure BFW_Bar 447
8/5/2018 10:00 HRSG CR STEAM DRUM_Pressure BFW_Bar 77.18
8/5/2018 12:00 HRSG CR STEAM DRUM_Pressure BFW_Bar 77.18
8/5/2018 8:00 HRSG CR NG_PV. Natural Gas_% 147
8/5/2018 10:00 HRSG CR NG_PV. Natural Gas_% 147
8/2/2018 14:00 SWGR CR 11KV-SWGR_DEMAND-P_KMI_MW 4.73
8/2/2018 4:00 PSA N2 CR COMPRESSOR B_Separator Drop_Bar 2.00
8/5/2018 4:00 GTG Lap 2 Generator_Act. Power P_kW 0
8/2/2018 20:00 GTG Lap 2 Generator_MVARh ERD_MVARh 232132
8/3/2018 16:00 GTG Lap 2 Generator_MVARh ERD_MVARh 232154
8/2/2018 16:00 GTG Lap 2 Generator_Arus I2_Amp 399
8/3/2018 18:00 GTG Lap 2 EXH-TEMP_TTXD -03_°C 569
8/3/2018 20:00 GTG Lap 2 EXH-TEMP_TTXD -14_°C 784
8/5/2018 14:00 GTG Lap 2 WS-TEMP_TTWS. 2 AO - 2_°C 344
8/1/2018 8:00 GTG Lap 2 BEARING TEMP BFW PUMP_RTD (max 200 degC)_No:1 54
8/3/2018 18:00 GTG Lap 2 DEAERATOR_Level CL 501 (> - 100cm Alarm)_cm 21
8/4/2018 12:00 GTG Lap 2 DEAERATOR_Open CV Steam_% 126.67
8/1/2018 6:00 SWGR LAP 0
8/5/2018 8:00 PSA N2 LAP Total Power Comp A&B 179781
8/5/2018 10:00 PSA N2 LAP Total Power Comp A&B 179485
8/6/2018 8:00 GTG Lap 2 WS-TEMP_TTWS. 1. FO - 1_°C 674
8/6/2018 6:00 SWGR CR 11KV-SWGR_DEMAND-P_KNI_MW 0.14
8/6/2018 8:00 SWGR CR 11KV-SWGR_DEMAND-P_KNI_MW 0.11
8/5/2018 10:00 SWGR LAP SS4_Current - R_A 177
8/6/2018 22.OO PSA N2 CR PSA_Pressure Header ( PT-300 )_Bar 15.11
8/6/2018 4:00 PSA N2 LAP FI-300 0
8/6/2018 8:00 PSA N2 LAP Totally Flow - 300 9.90
8/6/2018 12:00 PSA N2 LAP Power Compressor A 0.25
8/7/2018 6:00 GTG Lap 2 Generator_Frequency F_Hz 50.28
8/7/2018 22.OO GTG Lap 2 EXH-TEMP_TTXD -04_°C 1.00
8/7/2018 16:00 PSA N2 LAP 0
8/7/2018 18:00 SWGR CR 11KV-SWGR_DEMAND-P_P1 A Urea_MW 0.83
8/7/2018 16:00 SWGR LAP EXT PANEL TR 1000KVA_Current - R_A 0
8/7/2018 16:00 SWGR LAP EXT PANEL TR 1000KVA_Current - S_A 0
8/7/2018 16:00 SWGR LAP EXT PANEL TR 1000KVA_Current - T_A 0
8/8/2018 4:00 GTG Lap 2 Generator_MVARh ERD_MVARh 2325743
8/7/2018 22:00 HRSG LAP STEAM DRUM_Open CV AA501_% 79.65
11/17/2018 10:00 SWRO CR SWRO B_AI 201 B_SWRO feed cond._µs/cm 4299.8 OK
11/20/2018 2:00 SWRO Lap SW_LI 401_UF feed tank level_m 118 OK
11/20/2018 8:00 SWRO Lap SW_LI 401_UF feed tank level_m 0 OK
11/20/2018 20:00 SWRO Lap SW_LI 401_UF feed tank level_m 431318 OK
11/20/2018 22:00 SWRO Lap SW_LI 401_UF feed tank level_m 0 OK
11/20/2018 02.00-22.00 SWRO Lap MCC_INCOMING__kWH 6….. OK
12/4/2018 12:00 GTG CR Turbine_Fuel stroke ref_FSR_% 313 OK
12/4/2018 6:00 Turbine_GRV Gas rev_FPRG_Bar 16.56 OK
12/3/2018 2:00 Vibration_Vibration -11_BB11_mm/s 137 OK
12/5/2018 18.00-22.00 Vibration_Vibration -11_BB11_mm/s 137 OK
12/6/2018 22:00 Vibration_Vibration -11_BB11_mm/s 137 OK
12/4/2018 12:00 Bearing Temp_TRB-BRG2 - MET_BJT 2-2_°C 68 OK
12/6/2018 0:00 GTG Lap 2 Generator_MVARh ERD_MVARh 235810 OK
12/4/2018 2:00 Generator_Voltage.Battery 125 VDC_VDC 119 OK
12/5/2018 04.00-06.00 WS-TEMP_TTWS. 2 AO - 1_°C 695 OK
12/5/2018 18.00-20.00 HRSG CR STEAM DRUM_PV Flow BFW_kg/s 0.2 OK
12/4/2018 12:00 STEAM DRUM_Cond. HP Drum._ us/cm 3.45 OK
12/5/2018 8:00 NG_Temperature Furnance_°C 5.66 OK
12/4/2018 14:00 PSA N2 CR PSA_Pressure Header ( PT-300 )_Bar 45 OK
12/3/2018 20:00 PSA N2 Lap AL-81 (Analyzer Product) 203 OK
12/3/2018 20:00 SWRO CR BWRO A_AIT 301 A _BWRO permeate pH_pH 3.8 OK
12/9/2018 12:00 GTG CR Turbine_GRV Gas rev_FPRG_Bar 13.5 OK
12/7/2018 22:00 Spread Temp_IGV Angle_CSGV_DGA 27 OK
12/9/2018 22:00 GTG Lap 2 Generator_Voltage U. 3 - 1_kV 10.9 OK
12/9/2018 12:00 Generator_Power Factor Pf_Cos p 38 OK
12/8/2018 12:00 HRSG CR STEAM PROD_Pressure Steam_Bar 48.72 OK
12/8/2018 6:00 PSA N2 CR PSA_Pressure Header ( PT-300 )_Bar 39 OK
12/8/2018 6:00 PSA_Opening V 567_% 471 OK
12/12/2018 10:00 GTG CR Generator_Voltage_DVX_kV 1039 OK
12/11/2018 12:00 Turbine_GRV Gas rev_FPRG_Bar OK
12/6/2018 20:00 GTG Lap 2 Generator_MVARh ERD_MVARh 2359055 OK
12/12/2018 16:00 Generator_Voltage U. 1 - 2_kV 10.7 OK
12/12/2018 8:00 Generator_Voltage.Battery 125 VDC_VDC 29 OK
12/9/2018 6:00 GEN-STATOR-TEMP_TE - 023. A_°C 96.5 OK
12/12/2018 20:00 EXH-TEMP_TTXD -07_°C 86 OK
12/11/2018 0:00 EXH-TEMP_TTXD -10_°C 778 OK
12/12/2018 16:00 EXH-TEMP_TTXD -11_°C 590 OK
12/10/2018 20:00 Generator_MVA S_kVA 12269 OK
12/1/2018 0:00 HRSG CR DEAERATOR_Cond Dearator._us / cm 0 OK
12/1/2018 2:00 DEAERATOR_Cond Dearator._us / cm 0 OK
12/11/2018 4:00 NG_OUT. (A / M )_% 4 OK
12/5/2018 8:00 NG_Temperature Furnance_°C 5.66 OK
12/4/2018 14:00 PSA N2 CR PSA_Pressure Header ( PT-300 )_Bar 45 OK
12/2/2018 4:00 COMPRESSOR B_Separator Drop_Bar 2 OK
12/10/2018 4:00 HRSG Lap STEAM DRUM_Open CV AA501_% 3.56 OK
12/13/2018 2:00 GTG Lap 2 Generator_MVARh ERD_MVARh 2354688 OK
4:00 Generator_MVARh ERD_MVARh 2354712 OK
8:00 Generator_Voltage U. 1 - 2_kV 10.9 OK
12:00 Generator_Voltage U. 2 - 3_kV 1 OK
22:00 Generator_Arus I2_Amp 91 OK
8:00 EXH-TEMP_TTXD -03_°C 65 OK

12/14/2018 20:00 GTG LAP 2 Generator_MVARh ERD_MVARh 2357146


12/14/2018 4:00 Generator_Power Factor Pf_Cos p 0.51
12/15/2018 2:00 EXH-TEMP_TTXD -14_°C 4487
12/7/2018 20:00 PSA N2 Lap PI81 Air R T Pressure 0
12/8/2018 2:00 PI81 Air R T Pressure 78
12/8/2018 4:00 1PI-79 Purging 76
12/9/2018 4:00 Total Power Comp A&B 1542253.32
12/3/2018 20:00 AL-81 (Analyzer Product) 203