Date Project Gahub Bridge Location Subject BOM: Precast Concrete Square Piles
Date Project Gahub Bridge Location Subject BOM: Precast Concrete Square Piles
B EQUIPMENT
1.0 Bar Bending machine hrs. 0.444 418.53
2.0 Bar Cutter Machine hrs. 0.444 368.30
3.0 Crane hrs. 0.333 2041.00
4.0 Air Compressor hrs. 0.083 422.00
5.0 Concrete Vibrator hrs. 0.114 78.13
6.0 Batching Plant hrs. 0.114 2486.40
7.0 Cutting Outfit hrs. 0.418 64.00
8.0 Coiling Machine hrs. 0.170 418.53
9.0 Pre-stressing Jack hrs. 0.750 322.00
10.0 Grinding Machine hrs. 0.049 35.00
11.0 Payloader hrs. 0.114 1255.00
12.0 Transit Mixer hrs. 0.114 1486.00
13.0 Wielding Machine hrs.
C. Labor/Sub-Contractor
1.0 Concrete cu.m 2.430 60.00
2.0 Fabrication and Installation of Rebars kgs. 87.738 3.50
3.0 Coil kgs. 22.178 1.00
4.0 HTS kgs. 94.800 1.00
Admin
5.0 1-Supervisor hrs. 0.114 62.50
6.0 1-Quality Control hrs. 0.114 62.50
7.0 1-QC Aid hrs. 0.114 39.88
8.0 1-Electrician hrs. 0.114 43.75
9.0 4-Riggers hrs. 1.332 39.88
10.0 2-Fabrication Machine Operator hrs. 0.392 43.75
Consumables
11.0 Acetylene/LPG Cyl. 0.007 900.00
12.0 Industrial Oxygen Cyl. 0.036 370.00
13.0 Latex Paint gal. 0.035 475.00
14.0 Welding Rod 6011 1/8" kgs.
PILES
REMARKS
AMOUNT (Php)
6348.38
911.74
1107.11
956.81
24.41
1202.15
1299.42
902.00
216.65
4740.00
677.54
185.99
163.67
679.65
35.03
8.90
283.37
26.76
71.01
241.46
1.72
143.03
169.35
145.80
307.08
22.18
94.80
7.12
7.12
4.55
4.99
53.12
17.13
6.30
13.32
16.63
21096.26
Project: GAHUB BRIDGE PROJECT
Section: 450mmx450mm
Length (m): 12
Concrete Volume (cu.m): 2.43
Re
COIL HTS
Stirrups (tip)
No. of turns Price Pcs. Length (m) Price 10mmØ x 1.5m
Pcs.
106.00 1/kg 10 12 1/kg 16
Adjusted Price =
Concrete
Price/Pile Price/Lin.m.
555.532 46.294
Adjusted Price =
CP GAHUB BRIDGE 450mmx450mmx12,000mm Dowel Flat End 10hts Pre-stressed Pre-cast Concret
C. Indirect labor - per piece cost
A. Square Pile
1. Operators
2. Admin
1
1
1
4
D. Variable overhead
A. Pile
1. Electricity
mm Dowel Flat End 10hts Pre-stressed Pre-cast Concrete Square Piles
1. Electricity
A. Batching plant Computation of formula Watts Cost driver
1. Control unit = hrs x kWh rate / 1000watts
2. Lighting = hrs x kWh rate / 1000watts
3. Aircon = hrs x kWh rate / 1000watts
B. Bar Bending = hrs x kWh rate / 1000watts
C. Bar cutting = hrs x kWh rate / 1000watts
D. Air compressor = hrs x kWh rate / 1000watts
E. Vibrator = hrs x kWh rate / 1000watts
F. Prestressing jack = hrs x kWh rate / 1000watts
G. Coiling Machine = hrs x kWh rate / 1000watts
H. Compression machine = hrs x kWh rate / 1000watts
Standard Cost
Standard Cost
137350 0.114 15,657.900
1350 0.114 153.900
500 0.114 57.000
3700 0.444 1,642.800
3700 0.444 1,642.800
3000 0.083 249.000
1500 0.114 171.000
3000 0.75 2,250.000
4000 0.17 680.000
750 0.5 375.000
22,879.400 22.88 10.45 PHP 239.09
Date Length: 14 meters
Project Width: 450mm
Location Tickness: 450mm
Subject Quantity: 1 pc.
B EQUIPMENT
1 Bar Bending machine hrs.
2 Bar Cutter Machine hrs. 0.426
3 Crane hrs. 0.333
4 Air Compressor hrs. 0.062
5 Concrete Vibrator hrs. 0.127
6 Batching Plant hrs. 0.127
7 Cutting Outfit hrs. 0.334
8 Coiling Machine hrs. 0.221
9 Pre-stressing Jack hrs. 0.6
10 Grinding Machine hrs. 0.041
11 Payloader hrs. 0.127
12 Transit Mixer hrs. 0.127
13 Wielding Machine hrs.
C. Labor/Sub-Contractor
1 Concrete cu.m 2.835
2 Fabrication and Installation of Rebars kgs. 44.2
3 Coil kgs. 24.689
4 HTS kgs. 88.48
Admin
5 1-Supervisor hrs.
6 1-Quality Control hrs.
7 1-QC Aid hrs.
8 1-Electrician hrs.
9 4-Riggers hrs.
10 2-Fabrication Machine Operator hrs.
Consumables
11 Acetylene/LPG Cyl.
12 Industrial Oxygen Cyl.
13 Latex Paint gal.
14 Welding Rod 6011 1/8" kgs.
Cage Bar: 25mm Ø
Tip: 4pcsX0.6m = 2.40 m
Butt: 4pcsX0.6m = 2.40 m
HTS: 8-12.7mmØ
Lateral Ties: 10.00 mmØ
Length: 1.50 m
Tip: 13 pcs.
Butt: 13 pcs.
Spiral Ties: 6.00mmØ
Dowel Bars: 25.00mmØ
Length: 1.50 m
No.: 4 pcs
SQUARE PILES
MATERIAL STATUS (%) Percentage REMARKS
Pending
MUTIPLIER
1 cu.m = 12.5 bags Cement BAg
Washed sand is 0.56 of volume washed sand
Crushed Sand = 0.68 of volume 3/4 gravel
water reducing agent TOJ (concrete Admixture) 4.5 Liters / volume
used oil is 0.098 liters of the surface area Delivery Cost
RSB is 20 kg/ ton
#16 GI tie wire = (total weight of steel/1000)x 20 equipment
stressing jack
crane 90T P&H
Crane Terex 75T
Transit Mixer
concrete vibrator
Payloader
228
850
1020
8000
250/hr
5800/hr
5800/hr
900/hr
550/hr
1200/hr
Common Unit Price of Items
Line No. Ref. Doc. Material No. Material Description Quantity Unit
Supply, Delivery and Driving of PS/PC
Concrete Square Piles
4,000,000
457,250
200,000
150,000
50,000
20,000
80,000
50,000
150,000
200,000
80,000
3,900
3900
550
6,000
120,000
40,000
ITEM MATERIALS DESCRIPTION UNIT QUANTITY UNIT COST AMOUNT
A 1. CONCRETE
Cement
Sand
Gravel
Admixtures
Used Oil
2. Grout
SIKA Grout Entro Plus Z 0.80kg