BAR BENDING SCHEDULE PIPE SLEEPER TIPE A

DIAMETER BERAT (/m) JUMLAH


BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 14.000

6.3
7

77.1 13.00 1.040 0.904 14.000

6.3
4 189.4

12 12
10.00 0.617 4.108 5.000

189.4

42
17 17 13.00 1.040 0.760 13.000

192
15.7 15.7 13.00 1.040 2.234 3.000

17 17 13.00 1.040 0.734 13.000


39.4

15.7 15.7 13.00 1.040 2.234 3.000


192

30 16.00 1.578 0.370 12.000

7
VOLUME BESI
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (SP-A-02)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 6.000

6.3
7

77.1 13.00 1.040 0.904 6.000

6.3
4 79.2

12 12
10.00 0.617 1.904 5.000

79.2

42
17 17 13.00 1.040 0.760 5.000

82
15.7 15.7 13.00 1.040 1.134 3.000

17 17 13.00 1.040 0.734 5.000


39.4

15.7 15.7 13.00 1.040 1.134 3.000


82

30 16.00 1.578 0.370 5.000

7
VOLUME BESI

JUMLAH 1.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (SP-A-03)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 5.000

6.3
7

77.1 13.00 1.040 0.904 5.000

6.3
4 59

12 12
10.00 0.617 1.500 4.000

59

42
17 17 13.00 1.040 0.760 3.000

82
15.7 15.7 13.00 1.040 1.134 3.000

17 17 13.00 1.040 0.734 4.000


39.4

15.7 15.7 13.00 1.040 1.134 3.000


82

30 16.00 1.578 0.370 4.000

7
VOLUME BESI

JUMLAH 5.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (SP-A-05)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
VOLUME TULANGAN

JUMLAH PONDASI
TOTAL VOLUME TULANGAN
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (PS29-C-1812 ; PS29-C-1810 ; PS29-C-2510 )
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMET (kg/m) TULANGAN (m) TULANG
ER (mm) AN
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
VOLUME TULANGAN

JUMLAH PONDASI
TOTAL VOLUME TULANGAN
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (PS16-5S-0305)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
17.4

59.4 13.00 1.040 0.868 3.000

10
17.3

58.1 13.00 1.040 0.854 3.000

10

23 10.00 0.617 0.310 4.000

4 23

23 23 10.00 0.617 1.000 4.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4

30 16.00 1.578 0.370 4.000

VOLUME BESI

JUMLAH 3.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (PS16-5S-1806)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
17.4

79.4 13.00 1.040 1.118 3.000

15
17.3

78.1 13.00 1.040 1.104 3.000

15

23 10.00 0.617 0.310 4.000

4 23

23 23 10.00 0.617 1.000 4.000

23

72
17 17 13.00 1.040 1.060 4.000

72
15.7 15.7 13.00 1.040 1.034 4.000

17 17 13.00 1.040 1.034 4.000


69.4

15.7 15.7 13.00 1.040 1.008 4.000


13.00 1.040 1.008 4.000
69.4

30 16.00 1.578 0.370 4.000

VOLUME BESI

JUMLAH 1.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
TANK (PS16-5S-2505)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
17.4

79.4 13.00 1.040 1.118 3.000

15
17.3

78.1 13.00 1.040 1.104 3.000

15

23 10.00 0.617 0.310 4.000

4 23

23 23 10.00 0.617 1.000 4.000

23

72
17 17 13.00 1.040 1.060 4.000

72
15.7 15.7 13.00 1.040 1.034 4.000

17 17 13.00 1.040 1.034 4.000


69.4

15.7 15.7 13.00 1.040 1.008 4.000


13.00 1.040 1.008 4.000
69.4

30 16.00 1.578 0.370 4.000

VOLUME BESI

JUMLAH 1.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
TANK (SP-A-04)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 6.000

6.3
7

77.1 13.00 1.040 0.904 6.000

6.3
4 74.4

12 12
10.00 0.617 1.808 5.000

74.4

42
17 17 13.00 1.040 0.760 13.000

77
15.7 15.7 13.00 1.040 1.084 3.000

17 17 13.00 1.040 0.734 13.000


39.4

15.7 15.7 13.00 1.040 1.058 3.000


74.4

30 16.00 1.578 0.370 5.000

7
VOLUME BESI

JUMLAH 16.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
TANK (PS02-2S-15)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
TANK (PS02-2S-12)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
TANK (PS02-2S-08)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 6.000

10
17.2

76.6 13.00 1.040 1.038 6.000

10

23 10.00 0.617 0.310 10.000

4 23

23 23 10.00 0.617 1.000 10.000

23

112
17 17 13.00 1.040 1.460 4.000

52
15.7 15.7 13.00 1.040 0.834 8.000

17 17 13.00 1.040 1.434 4.000


109.4

15.7 15.7 13.00 1.040 0.808 8.000


13.00 1.040 0.808 8.000
49.4
16

25 25 16.00 1.578 0.800 4.000

7 7

VOLUME BESI

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
TANK (PS17-2S-04)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 26.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SUPPORT RELOKLASI ADO TANK (PS16-6W-0
JUMLAH
BERAT
BENTUK TULANGAN (cm) D (mm) (kg/m) PANJANG TULANG
TULANGAN (m) AN
25

25 25 16.00 1.58 0.890 4

7 7
17.4

89.4 13.00 1.04 1.168 3

10
17.4

88.1 13.00 1.04 1.155 3

10
4 32

32 32 10.00 0.62 1.360 6

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
D 16
Ø 10
TOTAL VOLUME TULANGAN
BAR BENDING SCHEDULE PIPE SUPPORT RELOKLASI ADO TANK (SP-D-01
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 6.000

6.3
7

77.1 13.00 1.040 0.904 6.000

6.3
4 89.2

12 12
10.00 0.617 2.104 5.000

89.2

42
17 17 13.00 1.040 0.760 5.000

92
15.7 15.7 13.00 1.040 1.234 3.000

17 17 13.00 1.040 0.734 5.000


39.4

15.7 15.7 13.00 1.040 1.234 3.000


92

30 16.00 1.578 0.370 5.000

7
VOLUME BESI

JUMLAH 1.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-02)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-03)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-03A)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-03B)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-03C)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-03D)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-04)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-05)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-06)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 4.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(PS-D-07)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(PS-D-08)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 1.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-09)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 15

6.3
7

77.1 13.00 1.040 0.904 15

6.3
4 209.4

12 12
10.00 0.617 4.508 7.000

209.4

42
17 17 13.00 1.040 0.760 14.000

212
15.7 15.7 13.00 1.040 2.434 3.000

17 17 13.00 1.040 0.734 14.000


39.4

15.7 15.7 13.00 1.040 2.408 3.000


209

30 16.00 1.578 0.370 14.000

7
VOLUME BESI

JUMLAH 40.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-10)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 4

6.3
7

77.1 13.00 1.040 0.904 4

6.3
4 39.4

12 12
10.00 0.617 1.108 5.000

39.4

42
17 17 13.00 1.040 0.760 14.000

42
15.7 15.7 13.00 1.040 0.734 3.000

17 17 13.00 1.040 0.734 14.000


39.4

15.7 15.7 13.00 1.040 0.708 3.000


39.4

30 16.00 1.578 0.370 3.000

7
VOLUME BESI

JUMLAH 15.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-D-11)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 4

6.3
7

77.1 13.00 1.040 0.904 4

6.3
4 69.4

12 12
10.00 0.617 1.708 5

69.4

42
17 17 13.00 1.040 0.760 5

72
15.7 15.7 13.00 1.040 1.034 3

17 17 13.00 1.040 0.734 5


39.4

15.7 15.7 13.00 1.040 1.008 3


69.4

30 16.00 1.578 0.370 5

7
VOLUME BESI

JUMLAH 2.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(SP-D-12)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 6

6.3
7

77.1 13.00 1.040 0.904 6

6.3
4 74.4

12 12
10.00 0.617 1.808 5

74.4

42
17 17 13.00 1.040 0.760 5

77
15.7 15.7 13.00 1.040 1.084 3

17 17 13.00 1.040 0.734 5


39.4

15.7 15.7 13.00 1.040 1.058 3


74.4

30 16.00 1.578 0.370 5

7
VOLUME BESI

JUMLAH 29.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS03-2S-22)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
17.4

79.4 13.00 1.040 1.118 3.000

15
17.3

78.1 13.00 1.040 1.104 3.000

15

23 10.00 0.617 0.310 4.000

4 23

23 23 10.00 0.617 1.000 5.000

23

72
17 17 13.00 1.040 1.060 5.000

72
15.7 15.7 13.00 1.040 1.034 5.000

17 17 13.00 1.040 1.034 5.000


69.4

15.7 15.7 13.00 1.040 1.008 5.000


13.00 1.040 1.008 5.000
69.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-22)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
17.4

79.4 13.00 1.040 1.118 3.000

15
17.3

78.1 13.00 1.040 1.104 3.000

15

23 10.00 0.617 0.310 4.000

4 23

23 23 10.00 0.617 1.000 5.000

23

72
17 17 13.00 1.040 1.060 5.000

72
15.7 15.7 13.00 1.040 1.034 5.000

17 17 13.00 1.040 1.034 5.000


69.4

15.7 15.7 13.00 1.040 1.008 5.000


13.00 1.040 1.008 5.000
69.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 10.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-15)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 4.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-08)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 6.000

10
17.2

76.6 13.00 1.040 1.038 6.000

10

23 10.00 0.617 0.310 10.000

4 23

23 23 10.00 0.617 1.000 10.000

23

112
17 17 13.00 1.040 1.460 4.000

52
15.7 15.7 13.00 1.040 0.834 8.000

17 17 13.00 1.040 1.434 4.000


109.4

15.7 15.7 13.00 1.040 0.808 8.000


13.00 1.040 0.808 8.000
49.4
16

25 25 16.00 1.578 0.800 4.000

7 7

VOLUME BESI

JUMLAH 15.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-12)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS17-2S-04)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 18.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-01)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

103.4 13.00 1.040 1.172 14.000

6.3
7

102.1 13.00 1.040 1.154 14.000

6.3
4 199.4

12 12
10.00 0.617 4.308 7.000

199.4

42
17 17 13.00 1.040 0.760 13.000

202
15.7 15.7 13.00 1.040 2.334 3.000

17 17 13.00 1.040 0.734 13.000


39.4

15.7 15.7 13.00 1.040 2.308 3.000


199.4

30 16.00 1.578 0.370 13.000

7
VOLUME BESI

JUMLAH 3.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-02)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

88.4 13.00 1.040 1.022 12.000

6.3
7

87.1 13.00 1.040 1.004 12.000

6.3
4 159.4

12 12
10.00 0.617 3.508 6.000

159.4

42
17 17 13.00 1.040 0.760 10.000

162
15.7 15.7 13.00 1.040 1.934 3.000

17 17 13.00 1.040 0.734 10.000


39.4

15.7 15.7 13.00 1.040 1.908 3.000


159.4

30 16.00 1.578 0.370 10.000

7
VOLUME BESI

JUMLAH 1.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-04)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

103.4 13.00 1.040 1.172 2.000

6.3
7

102.1 13.00 1.040 1.154 2.000

6.3
4 19.4

12 12
10.00 0.617 0.708 7.000

19.4

42
17 17 13.00 1.040 0.760 2.000

22
15.7 15.7 13.00 1.040 0.534 3.000

17 17 13.00 1.040 0.734 2.000


39.4

15.7 15.7 13.00 1.040 0.508 3.000


19.4

30 16.00 1.578 0.370 2.000

7
VOLUME BESI

JUMLAH 4.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-03)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5

72.0
13.00 1.04 1.034 5
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
D 16

JUMLAH 6.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-05)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

88.4 13.00 1.040 1.022 12.000

6.3
7

87.1 13.00 1.040 1.004 12.000

6.3
4 159.4

12 12
10.00 0.617 3.508 6.000

159.4

42
17 17 13.00 1.040 0.760 11.000

162
15.7 15.7 13.00 1.040 1.934 3.000

17 17 13.00 1.040 0.734 11.000


39.4

15.7 15.7 13.00 1.040 1.908 3.000


159.4

30 16.00 1.578 0.370 10.000

7
VOLUME BESI

JUMLAH 1.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE
(SP-U-6)
DIAMETER BERAT (/m) JUMLAH
BENTUK TULANGAN (cm) (mm) PANJANG TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 4

6.3
7

77.1 13.00 1.040 0.904 4

6.3
4 39.4

12 12
10.00 0.617 1.108 5.000

39.4

42
17 17 13.00 1.040 0.760 14.000

42
15.7 15.7 13.00 1.040 0.734 3.000

17 17 13.00 1.040 0.734 14.000


39.4

15.7 15.7 13.00 1.040 0.708 3.000


39.4

30 16.00 1.578 0.370 3.000

7
VOLUME BESI

JUMLAH 2.00 VOLUME BESI

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-13)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 2.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS02-2S-08)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 6.000

10
17.2

76.6 13.00 1.040 1.038 6.000

10

23 10.00 0.617 0.310 10.000

4 23

23 23 10.00 0.617 1.000 10.000

23

112
17 17 13.00 1.040 1.460 4.000

52
15.7 15.7 13.00 1.040 0.834 8.000

17 17 13.00 1.040 1.434 4.000


109.4

15.7 15.7 13.00 1.040 0.808 8.000


13.00 1.040 0.808 8.000
49.4
16

25 25 16.00 1.578 0.800 4.000

7 7

VOLUME BESI

JUMLAH 4.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS17-2S-04)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 11.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING
(PS16-4S-0805)
JUMLAH
BERAT PANJANG
BENTUK TULANGAN (cm) DIAMETE TULANGA
(/m) TULANGAN (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


13.00 1.040 0.808 4.000
49.4
16

25 25 16.00 1.578 0.800 2.000

7 7

VOLUME BESI

JUMLAH 8.00 VOLUME BESI TOTAL

TOTAL VOLUME BESI


R TIPE A
BERAT TOTAL KET
(Kg)

13.417 Tulangan Pedestal

13.162 Tulangan Pedestal

Tulangan Sengkang
12.673 Pedestal

Tulangan Foot Plat (Atas -


10.275 Top)

Tulangan Foot Plat (Atas -


6.970 Bottom)

Tulangan Foot Plat


9.924 (Bawah - Bottom)

Tulangan Foot Plat


6.970 (Bawah - Top)

7.006 Tulangan Embedded


60.718 D 13
12.673 Ø 10
7.006 D 16
TION PROCESS PIPE PREMIUM

BERAT TOTAL KET


(Kg)

5.750 Tulangan Pedestal

5.641 Tulangan Pedestal

Tulangan
5.874 Sengkang Pedestal

3.952 Tulangan Foot Plat


(Atas - Top)

3.538 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.817 (Bawah - Bottom)

3.538 Tulangan Foot Plat


(Bawah - Top)

Tulangan
2.919 Embedded
26.236 D 13
5.874 Ø 10
2.919 D 16
26.236 D 13
5.874 Ø 10
2.919 D 16
35.029 Kg
TION PROCESS PIPE PREMIUM

BERAT TOTAL KET


(Kg)

4.792 Tulangan Pedestal

4.701 Tulangan Pedestal

Tulangan
3.702 Sengkang Pedestal

2.371 Tulangan Foot Plat


(Atas - Top)

3.538 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.053 (Bawah - Bottom)

3.538 Tulangan Foot Plat


(Bawah - Top)

Tulangan
2.335 Embedded
21.993 D 13
3.702 Ø 10
2.335 D 16
109.967 D 13
18.510 Ø 10
11.677 D 16
140.154 Kg
TION PROCESS PIPE PREMIUM

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

27.49 kg
6.69 kg
34.18 kg

2
68.35 kg
TION PROCESS PIPE PREMIUM
C-2510 )
BERAT KETERANGAN
TOTAL (Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan Sengkang
4.20 Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

27.49 kg
6.69 kg
34.18 kg

3
102.53 kg
TION PROCESS PIPE PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

2.708 Tulangan Pedestal

2.664 Tulangan Pedestal

Tulangan
0.765 Sengkang Pedestal

Tulangan
2.468 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.335 Embedded

19.250 D 13
3.233 Ø 10
2.335 D 16
57.751 D 13
9.699 Ø 10
7.006 D 16
74.457 Kg
TION PROCESS PIPE PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

3.488 Tulangan Pedestal

3.444 Tulangan Pedestal

Tulangan
0.765 Sengkang Pedestal

Tulangan
2.468 Sengkang Pedestal

4.410 Tulangan Foot Plat


(Atas - Top)

4.301 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


4.301 (Bawah - Bottom)

4.193 Tulangan Foot Plat


(Bawah - Top)
4.193 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.335 Embedded

24.138 D 13
3.233 Ø 10
2.335 D 16
24.138 D 13
3.233 Ø 10
2.335 D 16
29.707 Kg
TION PROCESS PIPE PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

3.488 Tulangan Pedestal

3.444 Tulangan Pedestal

Tulangan
0.765 Sengkang Pedestal

Tulangan
2.468 Sengkang Pedestal

4.410 Tulangan Foot Plat


(Atas - Top)

4.301 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


4.301 (Bawah - Bottom)

4.193 Tulangan Foot Plat


(Bawah - Top)
4.193 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.335 Embedded

24.138 D 13
3.233 Ø 10
2.335 D 16
24.138 D 13
3.233 Ø 10
2.335 D 16
29.707 Kg
TION FIRE FIGHTING PREMIUM

BERAT TOTAL KET


(Kg)

5.750 Tulangan Pedestal

5.641 Tulangan Pedestal

Tulangan Sengkang
5.578 Pedestal

Tulangan Foot Plat (Atas -


10.275 Top)

Tulangan Foot Plat (Atas -


3.382 Bottom)

Tulangan Foot Plat


9.924 (Bawah - Bottom)

Tulangan Foot Plat


3.301 (Bawah - Top)

2.919 Tulangan Embedded


38.273 D 13
5.578 Ø 10
2.919 D 16
612.369 D 13
89.243 Ø 10
46.709 D 16
748.320 Kg
TION FIRE FIGHTING PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
122.616 D 13
24.248 Ø 10
15.149 D 16
162.013 Kg
TION FIRE FIGHTING PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
122.616 D 13
24.248 Ø 10
15.149 D 16
162.013 Kg
TION FIRE FIGHTING PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

6.639 Tulangan Pedestal

6.477 Tulangan Pedestal

Tulangan
1.913 Sengkang Pedestal

Tulangan
6.170 Sengkang Pedestal

6.074 Tulangan Foot Plat


(Atas - Top)

6.939 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


5.965 (Bawah - Bottom)

6.723 Tulangan Foot Plat


(Bawah - Top)
6.723 Tulangan Foot Plat
(Bawah - Top)

Tulangan
5.050 Embedded

38.817 D 13
8.083 Ø 10
5.050 D 16
232.902 D 13
48.496 Ø 10
30.298 D 16
311.696 Kg
TION FIRE FIGHTING PREMIUM

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
531.336 D 13
105.075 Ø 10
65.645 D 16
702.056 Kg
O TANK (PS16-6W-0706)
BERAT Ket
TOTAL (Kg)

Tulangan
5.62 Embedded Plate

3.64 Tulangan Pedestal

3.60 Tulangan Pedestal

Tulangan
5.03 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

28.75 kg
5.62 kg
5.03 kg
39.41 kg
ADO TANK (SP-D-01)
BERAT TOTAL KET
(Kg)

5.750 Tulangan Pedestal

5.641 Tulangan Pedestal

Tulangan
6.491 Sengkang Pedestal

3.952 Tulangan Foot Plat


(Atas - Top)

3.850 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.817 (Bawah - Bottom)

3.850 Tulangan Foot Plat


(Bawah - Top)

Tulangan
2.919 Embedded
26.860 D 13
6.491 Ø 10
2.919 D 16
26.860 D 13
6.491 Ø 10
2.919 D 16
36.270 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
184.417 D 13
40.130 D 10
- D 16
224.547 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
184.417 D 13
40.130 Ø 10
- D 16
224.547 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
184.417 D 13
40.130 Ø 10
- D 16
224.547 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
122.945 D 13
26.753 Ø 10
- D 16
149.698 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
61.472 D 13
13.377 Ø 10
- D 16
74.849 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
20.436 D 13
4.041 Ø 10
2.525 D 16
27.002 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

14.375 Tulangan Pedestal

14.102 Tulangan Pedestal

Tulangan Sengkang
19.470 Pedestal

Tulangan Foot Plat (Atas -


11.066 Top)

Tulangan Foot Plat (Atas -


7.594 Bottom)

Tulangan Foot Plat


10.687 (Bawah - Bottom)

Tulangan Foot Plat


7.513 (Bawah - Top)

8.174 Tulangan Embedded


65.337 D 13
19.470 Ø 10
8.174 D 16
2,613.499 D 13
778.802 Ø 10
326.962 D 16
3,719.263 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.833 Tulangan Pedestal

3.761 Tulangan Pedestal

Tulangan Sengkang
3.418 Pedestal

Tulangan Foot Plat (Atas -


11.066 Top)

Tulangan Foot Plat (Atas -


2.290 Bottom)

Tulangan Foot Plat


10.687 (Bawah - Bottom)

Tulangan Foot Plat


2.209 (Bawah - Top)

1.752 Tulangan Embedded


33.846 D 13
3.418 Ø 10
1.752 D 16
507.686 D 13
51.273 Ø 10
26.274 D 16
585.233 Kg
TION PROCESS PIPE ADO TANK

BERAT TOTAL KET


(Kg)

3.833 Tulangan Pedestal

3.761 Tulangan Pedestal

Tulangan Sengkang
5.269 Pedestal

Tulangan Foot Plat (Atas -


3.952 Top)

Tulangan Foot Plat (Atas -


3.226 Bottom)

Tulangan Foot Plat


3.817 (Bawah - Bottom)

Tulangan Foot Plat


3.145 (Bawah - Top)

2.919 Tulangan Embedded


21.734 D 13
5.269 Ø 10
2.919 D 16
43.468 D 13
10.538 Ø 10
5.839 D 16
59.845 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KET


(Kg)

5.750 Tulangan Pedestal

5.641 Tulangan Pedestal

Tulangan Sengkang
5.578 Pedestal

Tulangan Foot Plat (Atas -


3.952 Top)

Tulangan Foot Plat (Atas -


3.382 Bottom)

Tulangan Foot Plat


3.817 (Bawah - Bottom)

Tulangan Foot Plat


3.301 (Bawah - Top)

2.919 Tulangan Embedded


25.843 D 13
5.578 Ø 10
2.919 D 16
749.446 D 13
161.753 Ø 10
84.660 D 16
995.858 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.488 Tulangan Pedestal

3.444 Tulangan Pedestal

Tulangan
0.765 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

5.512 Tulangan Foot Plat


(Atas - Top)

5.377 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


5.377 (Bawah - Bottom)

5.242 Tulangan Foot Plat


(Bawah - Top)
5.242 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

28.440 D 13
3.850 Ø 10
2.525 D 16
56.880 D 13
7.700 Ø 10
5.050 D 16
69.629 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.488 Tulangan Pedestal

3.444 Tulangan Pedestal

Tulangan
0.765 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

5.512 Tulangan Foot Plat


(Atas - Top)

5.377 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


5.377 (Bawah - Bottom)

5.242 Tulangan Foot Plat


(Bawah - Top)
5.242 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

28.440 D 13
3.850 Ø 10
2.525 D 16
284.398 D 13
38.501 Ø 10
25.248 D 16
348.147 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
81.744 D 13
16.165 Ø 10
10.099 D 16
108.009 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

6.639 Tulangan Pedestal

6.477 Tulangan Pedestal

Tulangan
1.913 Sengkang Pedestal

Tulangan
6.170 Sengkang Pedestal

6.074 Tulangan Foot Plat


(Atas - Top)

6.939 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


5.965 (Bawah - Bottom)

6.723 Tulangan Foot Plat


(Bawah - Top)
6.723 Tulangan Foot Plat
(Bawah - Top)

Tulangan
5.050 Embedded

38.817 D 13
8.083 Ø 10
5.050 D 16
582.254 D 13
121.241 Ø 10
75.744 D 16
779.239 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
40.872 D 13
8.083 Ø 10
5.050 D 16
54.004 Kg
TION FIRE FIGHTING ADO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
367.848 D 13
72.744 Ø 10
45.446 D 16
486.039 Kg
TION PROCESS PIPE RFO TANK

BERAT TOTAL KET


(Kg)

17.057 Tulangan Pedestal

16.802 Tulangan Pedestal

Tulangan Sengkang
18.606 Pedestal

Tulangan Foot Plat (Atas -


10.275 Top)

Tulangan Foot Plat (Atas -


7.282 Bottom)

Tulangan Foot Plat


9.924 (Bawah - Bottom)

Tulangan Foot Plat


7.201 (Bawah - Top)

7.590 Tulangan Embedded


68.541 D 13
18.606 Ø 10
7.590 D 16
205.624 D 13
55.819 Ø 10
22.771 D 16
284.213 Kg
TION PROCESS PIPE RFO TANK

BERAT TOTAL KET


(Kg)

12.748 Tulangan Pedestal

12.530 Tulangan Pedestal

Tulangan Sengkang
12.987 Pedestal

Tulangan Foot Plat (Atas -


7.904 Top)

Tulangan Foot Plat (Atas -


6.034 Bottom)

Tulangan Foot Plat


7.634 (Bawah - Bottom)

Tulangan Foot Plat


5.953 (Bawah - Top)

5.839 Tulangan Embedded


52.803 D 13
12.987 Ø 10
5.839 D 16
52.803 D 13
12.987 Ø 10
5.839 D 16
71.628 Kg
TION PROCESS PIPE RFO TANK

BERAT TOTAL KET


(Kg)

2.437 Tulangan Pedestal

2.400 Tulangan Pedestal

Tulangan Sengkang
3.058 Pedestal

Tulangan Foot Plat (Atas -


1.581 Top)

Tulangan Foot Plat (Atas -


1.666 Bottom)

Tulangan Foot Plat


1.527 (Bawah - Bottom)

Tulangan Foot Plat


1.585 (Bawah - Top)

1.168 Tulangan Embedded


11.196 D 13
3.058 Ø 10
1.168 D 16
44.782 D 13
12.231 Ø 10
4.671 D 16
61.685 Kg
TION PROCESS PIPERFO TANK

BERAT TOTAL KET


(Kg)

3.49 Tulangan Pedestal

5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan
4.20 Sengkang Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)
Tulangan Foot Plat
5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg
- kg
184.417 D 13
40.130 Ø 10
- D 16
224.547 Kg
TION PROCESS PIPE RFO TANK

BERAT TOTAL KET


(Kg)

12.748 Tulangan Pedestal

12.530 Tulangan Pedestal

Tulangan Sengkang
12.987 Pedestal

Tulangan Foot Plat (Atas -


8.694 Top)

Tulangan Foot Plat (Atas -


6.034 Bottom)

Tulangan Foot Plat


8.397 (Bawah - Bottom)

Tulangan Foot Plat


5.953 (Bawah - Top)

5.839 Tulangan Embedded


54.357 D 13
12.987 Ø 10
5.839 D 16
54.357 D 13
12.987 Ø 10
5.839 D 16
73.182 Kg
TION PROCESS PIPE RFO TANK

BERAT TOTAL KET


(Kg)

3.833 Tulangan Pedestal

3.761 Tulangan Pedestal

Tulangan Sengkang
3.418 Pedestal

Tulangan Foot Plat (Atas -


11.066 Top)

Tulangan Foot Plat (Atas -


2.290 Bottom)

Tulangan Foot Plat


10.687 (Bawah - Bottom)

Tulangan Foot Plat


2.209 (Bawah - Top)

1.752 Tulangan Embedded


33.846 D 13
3.418 Ø 10
1.752 D 16
67.692 D 13
6.836 Ø 10
3.503 D 16
78.031 Kg
TION FIRE FIGHTING RFO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
40.872 D 13
8.083 Ø 10
5.050 D 16
54.004 Kg
TION FIRE FIGHTING RFO TANK

BERAT TOTAL KETERANGAN


(Kg)

6.639 Tulangan Pedestal

6.477 Tulangan Pedestal

Tulangan
1.913 Sengkang Pedestal

Tulangan
6.170 Sengkang Pedestal

6.074 Tulangan Foot Plat


(Atas - Top)

6.939 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


5.965 (Bawah - Bottom)

6.723 Tulangan Foot Plat


(Bawah - Top)
6.723 Tulangan Foot Plat
(Bawah - Top)

Tulangan
5.050 Embedded

38.817 D 13
8.083 Ø 10
5.050 D 16
155.268 D 13
32.331 Ø 10
20.198 D 16
207.797 Kg
TION FIRE FIGHTING RFO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
224.796 D 13
44.455 Ø 10
27.773 D 16
297.024 Kg
TION FIRE FIGHTING RFO TANK

BERAT TOTAL KETERANGAN


(Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal

Tulangan
0.956 Sengkang Pedestal

Tulangan
3.085 Sengkang Pedestal

3.578 Tulangan Foot Plat


(Atas - Top)

3.469 Tulangan Foot Plat


(Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

3.361 Tulangan Foot Plat


(Bawah - Top)
3.361 Tulangan Foot Plat
(Bawah - Top)

Tulangan
2.525 Embedded

20.436 D 13
4.041 Ø 10
2.525 D 16
163.488 D 13
32.331 Ø 10
20.198 D 16
216.017 Kg
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE ADO

diameter berat jumlah


BENTUK TULANGAN (cm) (mm) (/m) panjang rebar
rebar (m)
22.4

74.4 13.00 1.04 1.118 3

15
22.3

73.1 13.00 1.04 1.104 5

15
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
13.00 1.04 1.060 5
17.0 17.0 13.00 1.04 1.060 5

72.0
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10

BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE AD
(SP-D-08)

diameter berat jumlah


BENTUK TULANGAN (cm)
(mm) (/m) rebar
panjang
rebar (m)
18.5

77.9 13.00 1.040 1.064 3.000

10
17.2

76.6 13.00 1.040 1.038 3.000


13.00 1.040 1.038 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


49.4

15.7 15.7 13.00 1.040 0.808 4.000


49.4
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE AD
(SP-D-09)

diameter berat jumlah


BENTUK TULANGAN (cm) (mm) (/m) panjang rebar
rebar (m)
7.45

78.4 13.00 1.040 0.922 15

6.3
7

77.1 13.00 1.040 0.904 15

6.3
4 209.4

12 12
10.00 0.617 4.508 7.000

209.4

42
17 17 13.00 1.040 0.760 14.000

212
15.7 15.7 13.00 1.040 2.434 3.000

17 17 13.00 1.040 0.734 14.000


39.4

15.7 15.7 13.00 1.040 2.408 3.000


209

16.00 1.578 0.370 14.000


30 16.00 1.578 0.370 14.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE AD
(SP-D-10)
diameter berat jumlah
BENTUK TULANGAN (cm) panjang
(mm) (/m) rebar
rebar (m)
7.45

78.4 13.00 1.040 0.922 4

6.3
7

77.1 13.00 1.040 0.904 4

6.3
4 39.4

12 12
10.00 0.617 1.108 5.000

39.4

42
17 17 13.00 1.040 0.760 14.000

42
15.7 15.7 13.00 1.040 0.734 3.000

17 17 13.00 1.040 0.734 14.000


39.4

15.7 15.7 13.00 1.040 0.708 3.000


39.4

16.00 1.578 0.370 3.000


30 16.00 1.578 0.370 3.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION PROCESS PIPE AD
(SP-D-11)
diameter berat panjang jumlah
BENTUK TULANGAN (cm) (mm) (/m) rebar
rebar (m)
7.45

78.4 13.00 1.040 0.922 4

6.3
7

77.1 13.00 1.040 0.904 4

6.3
4 69.4

12 12
10.00 0.617 1.708 5

69.4

42
17 17 13.00 1.040 0.760 5

72
15.7 15.7 13.00 1.040 1.034 3

17 17 13.00 1.040 0.734 5


39.4

15.7 15.7 13.00 1.040 1.008 3


69.4

16.00 1.578 0.370 5


30 16.00 1.578 0.370 5

VOLUME BESI
TION PROCESS PIPE ADO TANK

berat KET
total (Kg)
Untuk :
- SP-D-02
- SP-D-03
- SP-D-03A
3.49 Tulangan Pedestal - SP-D-03B
- SP-D-03C
- SP-D-03D
- SP-D-04
- SP-D-05
- SP-D-06
- SP-D-07
5.74 Tulangan Pedestal

2.49 Tulangan Pedestal

Tulangan Sengkang
4.20 Pedestal

Tulangan Foot Plat


5.51 (Atas - Top)
Tulangan Foot Plat
5.51 (Atas - Top)

Tulangan Foot Plat


5.38 (Atas - Bottom)

Tulangan Foot Plat


5.38 (Bawah - Bottom)

Tulangan Foot Plat


5.24 (Bawah - Top)

30.74 kg
6.69 kg

ATION PROCESS PIPE ADO TANK

berat KET
total (Kg)

3.320 Tulangan Pedestal

3.239 Tulangan Pedestal


3.239 Tulangan Pedestal

Tulangan Sengkang
0.956 Pedestal

Tulangan Sengkang
3.085 Pedestal

Tulangan Foot Plat


3.578 (Atas - Top)

Tulangan Foot Plat


3.469 (Atas - Bottom)

Tulangan Foot Plat


3.469 (Bawah - Bottom)

Tulangan Foot Plat


3.361 (Bawah - Top)

20.436 D 13
4.041 Ø 10
ATION PROCESS PIPE ADO TANK

berat KET
total (Kg)

14.375 Tulangan Pedestal

14.102 Tulangan Pedestal

19.470 Tulangan Sengkang Pedestal

Tulangan Foot Plat (Atas -


11.066 Top)

Tulangan Foot Plat (Atas -


7.594 Bottom)

Tulangan Foot Plat (Bawah -


10.687 Bottom)

Tulangan Foot Plat (Bawah -


7.513 Top)

8.174 Tulangan Embedded


8.174 Tulangan Embedded

65.337 D 13
19.470 Ø 10
8.174 D 16
ATION PROCESS PIPE ADO TANK

berat KET
total (Kg)

3.833 Tulangan Pedestal

3.761 Tulangan Pedestal

3.418 Tulangan Sengkang Pedestal

Tulangan Foot Plat (Atas -


11.066 Top)

Tulangan Foot Plat (Atas -


2.290 Bottom)

Tulangan Foot Plat (Bawah -


10.687 Bottom)

Tulangan Foot Plat (Bawah -


2.209 Top)

1.752 Tulangan Embedded


1.752 Tulangan Embedded

33.846 D 13
3.418 Ø 10
1.752 D 16
ATION PROCESS PIPE ADO TANK

berat KET
total (Kg)

3.833 Tulangan Pedestal

3.761 Tulangan Pedestal

5.269 Tulangan Sengkang Pedestal

Tulangan Foot Plat (Atas -


3.952 Top)

Tulangan Foot Plat (Atas -


3.226 Bottom)

Tulangan Foot Plat (Bawah -


3.817 Bottom)

Tulangan Foot Plat (Bawah -


3.145 Top)

2.919 Tulangan Embedded


2.919 Tulangan Embedded

21.734 D 13
5.269 Ø 10
2.919 D 16
BAR BENDING SCHEDULE PIPE SLEEPER TIPE A

DIAMETER JUMLAH
BENTUK TULANGAN (cm) (mm) BERAT (/m) PANJANG TULANGAN
TULANGAN
(m)
7.5

103.4 13.00 1.040 1.172 14.000

6.3
7

102.1 13.00 1.040 1.154 14.000

6.3
4 189.4

12 12
10.00 0.617 4.108 7.000

189.4

42
17 17 13.00 1.040 0.760 13.000

192
15.7 15.7 13.00 1.040 2.234 3.000

17 17 13.00 1.040 0.734 13.000


39.4

15.7 15.7 13.00 1.040 2.234 3.000


192

16.00 1.578 0.370 13.000


30 16.00 1.578 0.370 13.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SLEEPER TIPE B

DIAMETER BERAT (/m) PANJANG JUMLAH


BENTUK TULANGAN (cm) (mm) TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 6.000

6.3
7

77.1 13.00 1.040 0.904 6.000

6.3
4 79.4

12 12
10.00 0.617 1.908 5.000

79.4

42
17 17 13.00 1.040 0.760 5.000

192
15.7 15.7 13.00 1.040 2.234 3.000

17 17 13.00 1.040 0.734 5.000


39.4

15.7 15.7 13.00 1.040 2.234 3.000


192
30 16.00 1.578 0.370 5.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SLEEPER TIPE C

DIAMETER BERAT (/m) PANJANG JUMLAH


BENTUK TULANGAN (cm) (mm) TULANGAN TULANGAN
(m)
7.45

78.4 13.00 1.040 0.922 3.000

6.3
7

77.1 13.00 1.040 0.904 3.000

6.3
4 39.4

12 12
10.00 0.617 1.108 5.000

39.4

42
17 17 13.00 1.040 0.760 3.000

192
15.7 15.7 13.00 1.040 2.234 3.000

17 17 13.00 1.040 0.734 3.000


39.4

15.7 15.7 13.00 1.040 2.234 3.000


192

16.00 1.578 0.370 3.000


30 16.00 1.578 0.370 3.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SUPPORT FOUNDATION TIPE A

DIAMETER BERAT (/m) PANJANG JUMLAH


BENTUK TULANGAN (cm) (mm) TULANGAN TULANGAN
(m)
27.5

74.4 13.00 1.04 1.174 3

15.5
22.3

73.1 13.00 1.04 1.109 5

15.5
4.5

31.4 10.00 0.62 0.404 10

4.5
4 32

32 32 10.00 0.62 1.360 5

32

72.0
17.0 17.0 13.00 1.04 1.060 5
13.00 1.04 1.060 5

72.0
15.7 15.7 13.00 1.04 1.034 5

13.00 1.04 1.034 5


17.0 17.0
69.4

13.00 1.04 1.008 5


15.7 15.7
69.4
D 13
Ø 10
BAR BENDING SCHEDULE PIPE SUPPORT FOUNDATION TIPE B
PANJANG JUMLAH
BERAT TULANGA TULANGA
BENTUK TULANGAN (cm) DIAMETE (/m) N (m)
R (mm) N
17.4

74.4 13.00 1.040 1.018 3.000

10
17.3

73.1 13.00 1.040 1.004 3.000

10

23 10.00 0.617 0.310 5.000

4 23

23 23 10.00 0.617 1.000 5.000

23

52
17 17 13.00 1.040 0.860 4.000

52
15.7 15.7 13.00 1.040 0.834 4.000

17 17 13.00 1.040 0.834 4.000


13.00 1.040 0.834 4.000
49.4

15.7 15.7 13.00 1.040 0.808 4.000


49.4

30 16.00 1.578 0.370 4.000

VOLUME BESI
BAR BENDING SCHEDULE PIPE SUPPORT FOUNDATION TIPE C
PANJANG JUMLAH
BERAT TULANGA TULANGA
BENTUK TULANGAN (cm) DIAMETE (/m) N (m)
R (mm) N
18.5

77.9 13.00 1.040 1.064 6.000

10
17.2

76.6 13.00 1.040 1.038 6.000

10

23 10.00 0.617 0.310 10.000

4 23

23 23 10.00 0.617 1.000 10.000

23

112
17 17 13.00 1.040 1.460 4.000

52
15.7 15.7 13.00 1.040 0.834 8.000

17 17 13.00 1.040 1.434 4.000


13.00 1.040 1.434 4.000
109.4

15.7 15.7 13.00 1.040 0.808 8.000


49.4
16

25 25 16.00 1.578 0.800 4.000

7 7

VOLUME BESI
EPER TIPE A

BERAT TOTAL (Kg) KET

Tulangan
17.064 Pedestal

Tulangan
16.802 Pedestal

Tulangan
17.742 Sengkang
Pedestal

Tulangan
10.275 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
6.970 (Atas -
Bottom)

Tulangan
Foot Plat
9.924 (Bawah -
Bottom)

Tulangan
6.970 Foot Plat
(Bawah - Top)

Tulangan
7.590 Embedded
Tulangan
7.590 Embedded

68.006 D 13
17.742 Ø 10
7.590 D 16
EPER TIPE B

BERAT TOTAL (Kg) KET

Tulangan
5.750 Pedestal

Tulangan
5.641 Pedestal

Tulangan
5.886 Sengkang
Pedestal

Tulangan
3.952 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
6.970 (Atas -
Bottom)

Tulangan
Foot Plat
3.817 (Bawah -
Bottom)

Tulangan
6.970 Foot Plat
(Bawah - Top)
Tulangan
2.919 Embedded

33.100 D 13
5.886 Ø 10
2.919 D 16
EPER TIPE C

BERAT TOTAL (Kg) KET

Tulangan
2.875 Pedestal

Tulangan
2.820 Pedestal

Tulangan
3.418 Sengkang
Pedestal

Tulangan
2.371 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
6.970 (Atas -
Bottom)

Tulangan
Foot Plat
2.290 (Bawah -
Bottom)

Tulangan
6.970 Foot Plat
(Bawah - Top)

Tulangan
1.752 Embedded
Tulangan
1.752 Embedded

24.297 D 13
3.418 Ø 10
1.752 D 16
OUNDATION TIPE A

BERAT TOTAL (Kg) KET

Tulangan
3.66 Pedestal

Tulangan
5.77 Pedestal

Tulangan
2.49 Pedestal

Tulangan
4.20 Sengkang
Pedestal

Tulangan
Foot Plat
5.51 (Atas -
Top)
Tulangan
Foot Plat
5.51 (Atas -
Top)

Tulangan
Foot Plat
5.38 (Atas -
Bottom)

Tulangan
Foot Plat
5.38 (Bawah -
Bottom)

Tulangan
Foot Plat
5.24 (Bawah -
Top)

33.43 kg
6.69 kg
OUNDATION TIPE B

BERAT TOTAL (Kg) KETERANGAN

Tulangan
3.176 Pedestal

Tulangan
3.132 Pedestal

Tulangan
0.956 Sengkang
Pedestal

Tulangan
3.085 Sengkang
Pedestal

Tulangan
Foot Plat
3.578 (Atas -
Top)

Tulangan
Foot Plat
3.469 (Atas -
Bottom)

Tulangan
Foot Plat
3.469 (Bawah -
3.469 (Bawah -
Bottom)
Tulangan
Foot Plat
3.361 (Bawah -
Top)

Tulangan
2.335 Embedde
d

20.186 D 13
4.041 Ø 10
2.335 D 16
OUNDATION TIPE C

BERAT TOTAL (Kg) KETERANGAN

Tulangan
6.639 Pedestal

Tulangan
6.477 Pedestal

Tulangan
1.913 Sengkang
Pedestal

Tulangan
6.170 Sengkang
Pedestal

Tulangan
Foot Plat
6.074 (Atas -
Top)

Tulangan
Foot Plat
6.939 (Atas -
Bottom)

Tulangan
Foot Plat
5.965 (Bawah -
5.965 (Bawah -
Bottom)
Tulangan
Foot Plat
6.723 (Bawah -
Top)

Tulangan
5.050 Embedde
d

38.817 D 13
8.083 Ø 10
5.050 D 16
BAR BENDING SCHEDULE PIPE SLEEPER TIPE A (SP-D-09)

DIAMETER BERAT (/m) PANJANG JUMLAH BERAT


BENTUK TULANGAN (cm) (mm) TULANGAN TOTAL (Kg)
TULANGAN
(m)
7.5

103.4 13.00 1.040 1.172 14.000 17.064

6.3
7

102.1 13.00 1.040 1.154 14.000 16.802

6.3
4 189.4

12 12
13.00 1.040 4.108 4.000 17.089

189.4

42
17 17 13.00 1.040 0.760 13.000 10.275

192
15.7 15.7 13.00 1.040 2.234 3.000 6.970

17 17 13.00 1.040 0.734 13.000 9.924


39.4

15.7 15.7 13.00 1.040 2.234 3.000 6.970


192

16.00 1.040 0.370 13.000 5.002


30 16.00 1.040 0.370 13.000 5.002

7
68.006
VOLUME BESI 17.089
5.002
total 90.097

Volume typical concrete

BAR BENDING SCHEDULE PIPE SUPPORT RELOKLASI ADO TANK (SP-D-01)


BAR BENDING SCHEDULE PIPE SUPPORT RELOKLASI ADO TANK (SP-D-01)
DIAMETER BERAT (/m) PANJANG JUMLAH BERAT
BENTUK TULANGAN (cm) (mm) TULANGAN TULANGAN TOTAL (Kg)
(m)
7.45

78.4 13.00 1.040 0.922 6.000 5.750

6.3
7

77.1 13.00 1.040 0.904 6.000 5.641

6.3
4 89.2

12 12
13.00 1.040 2.104 5.000 10.941

89.2

42
17 17 13.00 1.040 0.760 5.000 3.952

92
15.7 15.7 13.00 1.040 1.234 3.000 3.850

17 17 13.00 1.040 0.734 5.000 3.817


39.4

15.7 15.7 13.00 1.040 1.234 3.000 3.850


92

30 16.00 1.578 0.370 5.000 2.919


16.00 1.578 0.370 5.000 2.919

7
26.860
VOLUME BESI 10.941
2.919
26.860
JUMLAH 1.00 VOLUME BESI 10.941
2.919
TOTAL VOLUME BESI 40.720

Volume Concrete
BAR BENDING SCHEDULE PIPE SUPPORT RELOKLASI ADO TANK (PS16-6W-
0706)
PANJANG JUMLAH BERAT
BERAT TULANGA
BENTUK TULANGAN (cm) D (mm) (kg/m) TULANG TOTAL
N (m) AN (Kg)
25

25 25 13.00 1.58 0.890 4 5.62

7 7
17.4

89.4 13.00 1.04 1.168 3 3.64

10
17.4

88.1 13.00 1.04 1.155 3 3.60

10
4 32

32 32 13.00 1.04 1.360 6 8.49

32

72.0
17.0 17.0 13.00 1.04 1.060 5 5.51
13.00 1.04 1.060 5 5.51

72.0
15.7 15.7 13.00 1.04 1.034 5 5.38

13.00 1.04 1.034 5 5.38


17.0 17.0
69.4

13.00 1.04 1.008 5 5.24


15.7 15.7
69.4
D 13 28.75
D 13 5.62
D 13 8.49
TOTAL VOLUME TULANGAN 42.86

Volume concrete
-09)

KET

Tulangan
Pedestal

Tulangan
Pedestal

Tulangan
Sengkang
Pedestal

Tulangan
Foot Plat
(Atas - Top)

Tulangan
Foot Plat
(Atas -
Bottom)

Tulangan
Foot Plat
(Bawah -
Bottom)

Tulangan
Foot Plat
(Bawah - Top)

Tulangan
Embedded
Tulangan
Embedded

D 13
D 13
D 13
kg

ypical concrete 0.62 m3

NK (SP-D-01)
NK (SP-D-01)

KET

Tulangan
Pedestal

Tulangan
Pedestal

Tulangan
Sengkang
Pedestal

Tulangan
Foot Plat
(Atas -
Top)

Tulangan
Foot Plat
(Atas -
Bottom)

Tulangan
Foot Plat
(Bawah -
Bottom)
Tulangan
Foot Plat
(Bawah -
Top)

Tulangan
Embedde
d
Tulangan
Embedde
d

D 13
D 13
D 13
D 13
D 13
D 16
Kg

0.27 m3
NK (PS16-6W-

Ket

Tulangan
Embedde
d Plate

Tulangan
Pedestal

Tulangan
Pedestal

Tulangan
Sengkang
Pedestal

Tulangan
Foot Plat
(Atas -
Top)
Tulangan
Foot Plat
(Atas -
Top)

Tulangan
Foot Plat
(Atas -
Bottom)

Tulangan
Foot Plat
(Bawah -
Bottom)

Tulangan
Foot Plat
(Bawah -
Top)

kg
kg
kg
kg

0.304 m3
BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-12)

DIAMETER BERAT PANJANG


BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)

68

1071 13.00 1.04 1.196

57
63

1058 13.00 1.04 1.178

57

40 781
107
107 10.00 0.62 1.856
781

407.0
163.0 163.0 13.00 1.04 0.733

807.0
151.0 151.0 13.00 1.04 1.109

13.00 1.04 0.707


163.0 163.0
381.0

150.0 150.0
13.00 1.04 1.107

807.0

Total Besi 1 Buah Sleeper


Total sleeper SP-D-12 29.00 Noz

BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-13)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
68

821 13.00 1.04 0.946

57
63

808 13.00 1.04 0.928

57

40 2081
107
107 10.00 0.62 4.456
2081

407.0
163.0 163.0 13.00 1.04 0.733
13.00 1.04 0.733

2,107.0
151.0 151.0 13.00 1.04 2.409

13.00 1.04 0.707


163.0 163.0
381.0

150.0 150.0
13.00 1.04 2.407

2,107.0

Total Besi 1 Buah Sleeper

Total sleeper SP-D-13 6.00 Noz

BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-14)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
68

821 13.00 1.04 0.946


13.00 1.04 0.946

57
63

808 13.00 1.04 0.928

57

40 1381
107
107 10.00 0.62 3.056
1381

407.0
163.0 163.0 13.00 1.04 0.733

1,407.0
151.0 151.0 13.00 1.04 1.709

13.00 1.04 0.707


163.0 163.0
381.0

150.0 150.0
13.00 1.04 1.707

1,407.0

Total Besi 1 Buah Sleeper

Total sleeper SP-D-14 2.00 Noz


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-15)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
68

821 13.00 1.04 0.946

57
63

808 13.00 1.04 0.928

57

40 1081
107
107 10.00 0.62 2.456
1081

407.0
163.0 163.0 13.00 1.04 0.733

1,107.0
151.0 151.0 13.00 1.04 1.409

13.00 1.04 0.707


163.0 163.0
381.0
150.0 150.0
13.00 1.04 1.407

1,107.0

Total Besi 1 Buah Sleeper

Total sleeper SP-D-15 1.00 Noz

BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-16)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
68

821 13.00 1.04 0.946

57
63

808 13.00 1.04 0.928

57

40 881

10.00 0.62 2.056


107
107 10.00 0.62 2.056
881

407.0
163.0 163.0 13.00 1.04 0.733

907.0
151.0 151.0 13.00 1.04 1.209

13.00 1.04 0.707


163.0 163.0
381.0

150.0 150.0
13.00 1.04 1.207

907.0

Total Besi 1 Buah Sleeper

Total sleeper SP-D-16 15.00 Noz

BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (SP-D-17)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
68

821 13.00 1.04 0.946

57
63

808 13.00 1.04 0.928

57

40 381
107
107 10.00 0.62 1.056
381

407.0
163.0 163.0 13.00 1.04 0.733

407.0
151.0 151.0 13.00 1.04 0.709

13.00 1.04 0.707


163.0 163.0
381.0

150.0 150.0
13.00 1.04 0.707

407.0

Total Besi 1 Buah Sleeper

Total sleeper SP-D-17 16.00 Noz


BAR BENDING SCHEDULE PIPE SLEEPER & SUPPORT FOUNDATION FIRE FIGHTING PIP
ADO TANK (PS03-2S-22)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm)
(mm) (kg/m) REBAR (m)
223

766 13.00 1.04 1.083

94
222

753 13.00 1.04 1.069

94

40 307

307 307 10.00 0.62 1.308


307

45

310 10.00 0.62 0.400

45
507.0
163.0 163.0 13.00 1.04 0.833

507.0
150.0 150.0 13.00 1.04 0.807

13.00 1.04 0.833


163.0 163.0
507.0

150.0 150.0
13.00 1.04 0.807

507.0

Total Besi 1 Buah Sleeper

Total Pondasi Support PS03-2S-22 2.00 Noz


EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE
DO TANK (SP-D-12)

JUMLAH BERAT KET


REBAR TOTAL (Kg)

Tulangan
6 7.46 Pedestal

Tulangan
6 7.35 Pedestal

Tulangan
7 8.02 Sengkang
Pedestal

Tulangan
5 3.81 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 3.46 (Atas -
Bottom)

Tulangan
Foot Plat
5 3.68 (Bawah -
Bottom)

Tulangan
Foot Plat
3 3.45 (Bawah -
Top)
D 13 29.22 kg
Ø 10 8.02 kg
Jumlah 37.23 kg
D 13 847.25 kg
Ø 10 232.47 kg
Jumlah 1,079.72 kg

EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE


DO TANK (SP-D-13)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
15 14.76 Pedestal

Tulangan
15 14.48 Pedestal

Tulangan
5 13.75 Sengkang
Pedestal

Tulangan
14 10.67 Foot Plat
(Atas - Top)
Tulangan
14 10.67 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 7.52 (Atas -
Bottom)

Tulangan
Foot Plat
14 10.29 (Bawah -
Bottom)

Tulangan
Foot Plat
3 7.51 (Bawah -
Top)
D 13 65.23 kg
Ø 10 13.75 kg
Jumlah 78.97 kg
D 13 391.36 kg
Ø 10 82.48 kg
Jumlah 473.84 kg

EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE


DO TANK (SP-D-14)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
10 10.06 Pedestal
Tulangan
10 10.06 Pedestal

Tulangan
10 9.87 Pedestal

Tulangan
5 9.43 Sengkang
Pedestal

Tulangan
10 7.28 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 5.33 (Atas -
Bottom)

Tulangan
Foot Plat
10 7.02 (Bawah -
Bottom)

Tulangan
Foot Plat
3 5.33 (Bawah -
Top)
D 13 44.89 kg
Ø 10 9.43 kg
Jumlah 54.31 kg
D 13 89.77 kg
Ø 10 18.86 kg
Jumlah 108.63 kg
EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE
DO TANK (SP-D-15)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
8 7.87 Pedestal

Tulangan
8 7.72 Pedestal

Tulangan
5 7.58 Sengkang
Pedestal

Tulangan
8 6.10 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 4.40
(Atas -
Bottom)

Tulangan
Foot Plat
8 5.88 (Bawah -
Bottom)
Tulangan
Foot Plat
3 4.39 (Bawah -
Top)
D 13 36.36 kg
Ø 10 7.58 kg
Jumlah 43.94 kg
D 13 36.36 kg
Ø 10 7.58 kg
Jumlah 43.94 kg

EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE


DO TANK (SP-D-16)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
7 6.56 Pedestal

Tulangan
7 6.43 Pedestal

Tulangan
5 6.34 Sengkang
Pedestal
Tulangan
5 6.34 Sengkang
Pedestal

Tulangan
7 5.08 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 3.77
(Atas -
Bottom)

Tulangan
Foot Plat
7 4.90 (Bawah -
Bottom)

Tulangan
Foot Plat
3 3.77 (Bawah -
Top)
D 13 30.51 kg
Ø 10 6.34 kg
Jumlah 36.86 kg
D 13 457.72 kg
Ø 10 95.14 kg
Jumlah 552.87 kg

EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE


DO TANK (SP-D-17)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
4 3.44
Pedestal

Tulangan
4 3.38 Pedestal

Tulangan
5 3.26 Sengkang
Pedestal

Tulangan
4 2.67 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 2.21 (Atas -
Bottom)

Tulangan
Foot Plat
4 2.57 (Bawah -
Bottom)

Tulangan
Foot Plat
3 2.21 (Bawah -
Top)
D 13 16.48 kg
Ø 10 3.26 kg
Jumlah 19.74 kg
D 13 263.69 kg
Ø 10 52.12 kg
Jumlah 315.82 kg
EPER & SUPPORT FOUNDATION FIRE FIGHTING PIPE
O TANK (PS03-2S-22)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
3 3.38 Pedestal

Tulangan
3 3.34 Pedestal

Tulangan
5 4.04 Sengkang
Pedestal

Tulangan
5 1.23 Sengkang
Pedestal
Tulangan
4 3.03 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
4 2.94 (Atas -
Bottom)

Tulangan
Foot Plat
4 3.03 (Bawah -
Bottom)

Tulangan
Foot Plat
4 2.94 (Bawah -
Top)
D 13 18.65 kg
Ø 10 5.27 kg
Jumlah 23.92 kg
D 13 37.31 kg
Ø 10 10.54 kg
Jumlah 47.85 kg
BAR BENDING SCHEDULE PIPE SLEEPER PROCESS
PREMIUM TANK (SP-A-02)

DIAMETER BERAT PANJANG


BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)

87

770 25.00 3.85 0.955

98
50

745 25.00 3.85 0.892

97

40 727
110
110 10.00 0.62 1.754
727

395.0
183.0 183.0 25.00 3.85 0.761

795.0
133.0 133.0 25.00 3.85 1.061

25.00 3.85 0.659


157.0 157.0
345.0

107.0 107.0
25.00 3.85 0.959

745.0

Total Besi 1 Buah Sleeper


Total sleeper SP-A-02 6.00 Noz
BAR BENDING SCHEDULE PIPE SLEEPER PROCESS
PREMIUM TANK (SP-A-01)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
87

770 25.00 3.85 0.955

98
50

745 25.00 3.85 0.892

97

40 1827
110
110 10.00 0.62 3.954
1827

395.0
183.0 183.0 25.00 3.85 0.761

1,895.0
133.0 133.0 25.00 3.85 2.161

25.00 3.85 0.659


157.0 157.0
345.0

107.0 107.0
25.00 3.85 2.059

1,845.0

Total Besi 1 Buah Sleeper

Total sleeper SP-A-01


Total sleeper SP-A-01 6.00 Noz
SCHEDULE PIPE SLEEPER PROCESS
MIUM TANK (SP-A-02)

JUMLAH BERAT KET


REBAR TOTAL (Kg)

Tulangan
5 18.38 Pedestal

Tulangan
5 17.17 Pedestal

Tulangan
5 5.41 Sengkang
Pedestal

Tulangan
4 11.72 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 12.25 (Atas -
Bottom)

Tulangan
Foot Plat
4 10.15 (Bawah -
Bottom)

Tulangan
Foot Plat
3 11.08 (Bawah -
Top)
D 25 80.75 kg
Ø 10 5.41 kg
Jumlah 86.16 kg
D 25 484.52 kg
Ø 10 32.47 kg
Jumlah 516.99 kg
SCHEDULE PIPE SLEEPER PROCESS
MIUM TANK (SP-A-01)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
10 36.77 Pedestal

Tulangan
10 34.34 Pedestal

Tulangan
5 12.20 Sengkang
Pedestal

Tulangan
9 26.04 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 24.96 (Atas -
Bottom)

Tulangan
Foot Plat
9 22.55 (Bawah -
Bottom)

Tulangan
Foot Plat
3 23.78 (Bawah -
Top)
D 25 168.45 kg
Ø 10 12.20 kg
Jumlah 180.64 kg
D 25 1,010.68 kg
Ø 10 73.19 kg
Jumlah 1,083.86 kg
BAR BENDING SCHEDULE PIPE SLEEPER PROCESS
PREMIUM TANK (SP-A-02)

DIAMETER BERAT PANJANG


BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)

87

770 22.00 2.98 0.955

98
50

745 22.00 2.98 0.892

97

40 727
110
110 10.00 0.62 1.754
727

395.0
183.0 183.0 22.00 2.98 0.761

795.0
133.0 133.0 22.00 2.98 1.061

22.00 2.98 0.659


157.0 157.0
345.0

107.0 107.0
22.00 2.98 0.959

745.0

Total Besi 1 Buah Sleeper


Total sleeper SP-A-02 6.00 Noz
BAR BENDING SCHEDULE PIPE SLEEPER PROCESS
PREMIUM TANK (SP-A-01)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
87

770 22.00 2.98 0.955

98
50

745 22.00 2.98 0.892

97

40 1827
110
110 10.00 0.62 3.954
1827

395.0
183.0 183.0 22.00 2.98 0.761

1,895.0
133.0 133.0 22.00 2.98 2.161

22.00 2.98 0.659


157.0 157.0
345.0

107.0 107.0
22.00 2.98 2.059

1,845.0

Total Besi 1 Buah Sleeper

Total sleeper SP-A-01


Total sleeper SP-A-01 6.00 Noz
SCHEDULE PIPE SLEEPER PROCESS
MIUM TANK (SP-A-02)

JUMLAH BERAT KET


REBAR TOTAL (Kg)

Tulangan
5 14.23 Pedestal

Tulangan
5 13.29 Pedestal

Tulangan
5 5.41 Sengkang
Pedestal

Tulangan
4 9.07 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 9.49 (Atas -
Bottom)

Tulangan
Foot Plat
4 7.86 (Bawah -
Bottom)

Tulangan
Foot Plat
3 8.57 (Bawah -
Top)
D 25 62.51 kg
Ø 10 5.41 kg
Jumlah 67.92 kg
D 25 375.03 kg
Ø 10 32.47 kg
Jumlah 407.50 kg
SCHEDULE PIPE SLEEPER PROCESS
MIUM TANK (SP-A-01)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
10 28.46 Pedestal

Tulangan
10 26.58 Pedestal

Tulangan
5 12.20 Sengkang
Pedestal

Tulangan
9 20.16 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 19.32 (Atas -
Bottom)

Tulangan
Foot Plat
9 17.46 (Bawah -
Bottom)

Tulangan
Foot Plat
3 18.41 (Bawah -
Top)
D 25 130.38 kg
Ø 10 12.20 kg
Jumlah 142.58 kg
D 25 782.29 kg
Ø 10 73.19 kg
Jumlah 855.48 kg
BAR BENDING SCHEDULE PIPE SLEEPER
Penambahan Tulangan SP-D-10

DIAMETER BERAT PANJANG


BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)

68

813 13.00 1.04 0.881

50

800 13.00 1.04 0.850

40 326
326
10.00 0.62 1.420
326
362

Total Besi 1 Buah Sleeper


Total sleeper SP-A-02 15.00 Noz
BAR BENDING SCHEDULE PIPE SLEEPER PROCESS
PREMIUM TANK (SP-A-01)
DIAMETER BERAT PANJANG
BENTUK TULANGAN (mm) (mm) (kg/m) REBAR (m)
87

770 22.00 2.98 0.955

98
50

745 22.00 2.98 0.892

97

40 1827
110
110 10.00 0.62 3.954
1827

395.0
183.0 183.0 22.00 2.98 0.761

1,895.0
133.0 133.0 22.00 2.98 2.161

22.00 2.98 0.659


157.0 157.0
345.0

107.0 107.0
22.00 2.98 2.059

1,845.0

Total Besi 1 Buah Sleeper

Total sleeper SP-A-01


Total sleeper SP-A-01 6.00 Noz
ING SCHEDULE PIPE SLEEPER
bahan Tulangan SP-D-10

JUMLAH BERAT KET


REBAR TOTAL (Kg)

Tulangan
3 2.75 Pedestal

Tulangan
3 2.65 Pedestal

Tulangan
2 1.75 Sengkang
Pedestal

D 13 5.40 kg
Ø 10 1.75 kg
Jumlah 7.15 kg
D 13 81.01 kg
Ø 10 26.28 kg
Jumlah 107.30 kg
SCHEDULE PIPE SLEEPER PROCESS
MIUM TANK (SP-A-01)
JUMLAH BERAT KET
REBAR TOTAL (Kg)

Tulangan
10 28.46 Pedestal

Tulangan
10 26.58 Pedestal

Tulangan
5 12.20 Sengkang
Pedestal

Tulangan
9 20.16 Foot Plat
(Atas - Top)

Tulangan
Foot Plat
3 19.32 (Atas -
Bottom)

Tulangan
Foot Plat
9 17.46 (Bawah -
Bottom)

Tulangan
Foot Plat
3 18.41 (Bawah -
Top)
D 25 130.38 kg
Ø 10 12.20 kg
Jumlah 142.58 kg
D 25 782.29 kg
Ø 10 73.19 kg
Jumlah 855.48 kg