Professional Documents
Culture Documents
Improvement of Sylhet Town Bypass-Garrison Link To Shahporan Bridge Ghat Road Into 4-Lane Highway Project
Improvement of Sylhet Town Bypass-Garrison Link To Shahporan Bridge Ghat Road Into 4-Lane Highway Project
Remaining Quantity of filling sand upto subgrade level for Road No-01(Ch. 1+370 to 1+700) considering 4-Lane
1 For PVD bed@ R.L +9.50m 1+500 1+700 200.000 44.660 0.800 328,041.63
2 Filling over PVD bed Upto sub Grade level 1+370 1+700 330.000 38.060 2.500 1,441,494.53