Professional Documents
Culture Documents
New World Shwe Pyi Tan Company Limited: Safety Plan FOR
New World Shwe Pyi Tan Company Limited: Safety Plan FOR
New World Shwe Pyi Tan Company Limited: Safety Plan FOR
SAFETY PLAN
FOR
TAUNGOO-LEIKTHO-YARDO ROAD
Construction Works for the Pilot Project
in Bago Region
for Regional Development Project
for Poverty Reduction, Phase II
This Construction Safety Plan has been prepared to comply with the
regulations under Occupational Safety and Health Administration (OSHA), MNBC
and under The Guidance for the Management of Safety for Construction Works in
Japanese ODA Projects. It addresses foreseeable activities associated with the site
work activities to be conducted at the project: TAUNGOO-LEIKTHO-YARDO ROAD,
Construction Works for the Pilot Project in Bago Region for Regional Development
Project for Poverty Reduction, Phase II.
This plan is prepared to identify, evaluate, and control health and safety
hazards for the purpose of protecting all employees that involve in this project. The
plan provides for emergency response activities at the jobsite as well as covering
site hazard analysis, training requirements, engineering controls, materials handling,
and safe construction operations. The level of protection and the procedures
specified in this SAFETY PLAN represent the minimum health and safety
requirements to be observed by site personnel engaged in the referenced
inspection of construction related activities.
All Site Personnel Are Expected To Consider "Safety First" At All Times. The
ultimate responsibility for the health and safety of the individual employee rests with
the employee and his or her colleagues. Each employee is responsible for
exercising the utmost care and good judgment in protecting his or her own health
and safety and that of fellow employees. Should any employee observe a
potentially unsafe condition or situation, it is the responsibility of that employee to
immediately bring the observed condition to the attention of the appropriate
health and safety personnel as designated above and to follow-up the verbal
notification.
NEW WORLD SHWE PYI TAN has a strong commitment to providing a safe
and productive workplace. We seek to establish policies promoting high standards
of employee health and safety while delivering to our customer the highest quality
product. In keeping with this commitment we intend to maintain a positive Safety
Plan. Our employees conduct themselves and work in a safe manner with good
construction practices.
We shall appoint the personnel, Project Manager, Health and Safety Coordinator
(HSC), Site Safety Officer (SSO) and Site Safety Supervisors (SSS) for internal
organizational structure for safety management for this project. Key personnel and
their responsibilities are described below.
Project Manager: Provides review of all site activities and directs site activities via
the Site Safety Officer reports to Client. Has authority to direct response operations.
Responsibilities:
■ Prepares and organizes the background review of site conditions, the site
safety and the field team.
■ Coordinates with the Site Safety Officer (SSO) to ensure that health and
safety requirements are met.
■ Prepares the final report and support files on the response activities.
Responsibilities:
■ Assists SSO in conducting Jobsite Safety Inspections and assists with the
correction of shortcomings found.
Site Safety Officer (SSO): Advises the Project Manager and HSC on all aspects of
health and safety on site. Stops work if any operation threatens worker or public
health or safety.
Responsibilities:
■ Ensures that protective clothing and equipment are properly stored and
maintained.
■ Monitors the work parties for signs of stress, such as cold exposure, heat
stress, and fatigue.
NEW WORLD SHWE PYI TAN shall set out the basic principles for promotion of
the PDCA Cycle at construction sites in accordance with Clause 2.3 "PDCA for
Safety Management" which is described below.
The basic principle of PDCA for safety management shall be the cycle of
"Plan, Do, Check, Act" with "Plan" being the process of establishing the Safety Plan
and its Method Statements on Safety, "Do" being the specific implementation of
the plan thus established, "Check" being the observation and confirmation of the
safety management process, and "Act" being the implementation of
improvements to the implemented plans based on the past performance to ensure
the continuous development of field site safety standards. The cycle of these
processes shall be defined as PDCA for safety management. NEW WORLD SHWE
PYI TAN shall have chief responsibility for the implementation of safety
management.
Formulation of the "Plan": As part of the "Plan" NEW WORLD SHWE PYI TAN shall
formulate the Safety Plan as the basic safety management. NEW WORLD SHWE PYI
TAN shall then formulate a Method Statements on Safety as the more detailed
safety management plan for implementation.
Page 6 of 10
LOGO NEW WORLD SHWE PYI TAN CO., LTD JICA-TYLR-CSP
Broad Publication at the "Planning" Stage: NEW WORLD SHWE PYI TAN shall
document the items necessary to ensure safety at construction sites, disclose the
same to all Project Stakeholders and ensure that those items are fully understood at
the "Planning" stage.
"Do": NEW WORLD SHWE PYI TAN shall implement safety management on
construction sites according to the Safety Plan and its Method Statements on
Safety as formulated at the "Planning" stage.
Disclosure of results at the "Check" Stage: NEW WORLD SHWE PYI TAN shall
document and disclose the results of the "Check" stage to the Project Stakeholders.
“Act”: NEW WORLD SHWE PYI TAN shall examine specific methods of implementing
safety measures or related management systems and take corrective action
based on their results at the "Checking" stage. In addition, we shall review our
Safety Plan and the Method Statements on Safety and submit revised versions to
the Employer/Engineer. The Employer/Engineer shall review the submitted
documents.
Broad publication of the results of the "Acting" stage: In case the Safety Plan or the
Method Statements on Safety is revised, NEW WORLD SHWE PYI TAN shall document
the revision and disclose such revision to the Project Stakeholders. In particular, the
Contractor shall explain the types of work to which such change is to be
implemented and ensure that, prior to the commencement of the relevant work,
the change is understood by workers who engage in such work.
Continuous improvement: NEW WORLD SHWE PYI TAN shall ensure that the PDCA
safety management process is implemented and continuously improved in order
to maintain safety at construction sites.
4. Monitoring
NEW WORLD SHWE PYI TAN shall set out the basic principles for monitoring
safety management while considering the following requirements:
NEW WORLD SHWE PYI TAN shall undertake tests at all areas on site to
determine the extent of implementation of and compliance with safety
management principles in accordance with the Safety Plan. In addition,
NEW WORLD SHWE PYI TAN shall undertake tests to determine the extent of
implementation of strategies for the safe execution of each type of work in
accordance with the Method Statements on Safety.
NEW WORLD SHWE PYI TAN shall set out the basic principles for education
and training on safety to maintain safety during the construction works and take
into account the following requirements:
(1) Compliance with laws and regulations of the Republic of the Union of
Myanmar on education and training on safety
(2) Education to all Project Stakeholders (and to all new entrants to the site)
on:
(3) Education on the Method Statements on Safety for the assigned work
(7) Education for visitors, Education for third parties (other than Project
Stakeholders) when they enter the work area
NEW WORLD SHWE PYI TAN shall set out the basic principles for voluntary
safety management activities while taking into account the provisions in the tender
documents, the contract documents and the following requirements:
7. Sharing Information
Page 10 of 10
LOGO NEW WORLD SHWE PYI TAN CO., LTD JICA-TYLR-CSP
NEW WORLD SHWE PYI TAN shall set out the basic principles for sharing
information necessary to ensure effective safety management while taking into
account the following requirements:
NEW WORLD SHWE PYI TAN shall determine the policy for responding to any
unforeseen circumstances considered to be caused by natural disasters such as
rainstorms or earthquakes while taking into account the following requirements: